Material handling robots fleet size optimization by a heuristic

IF 1.3 Q4 ENGINEERING, INDUSTRIAL Journal of Project Management Pub Date : 1900-01-01 DOI:10.5267/J.JPM.2019.4.002
V. Chawla, A. Chanda, Surjit Angra
{"title":"Material handling robots fleet size optimization by a heuristic","authors":"V. Chawla, A. Chanda, Surjit Angra","doi":"10.5267/J.JPM.2019.4.002","DOIUrl":null,"url":null,"abstract":"Article history: Received: March 8 2019 Received in revised format: April 2 2019 Accepted: April 2 2019 Available online: April 4 2019 The application of material handling robots (MHRs) has been commonly observed in flexible manufacturing systems (FMS) for efficient material handling activities. In order to gain maximum throughput, minimum tardiness from the minimum investment of funds for the material handling activities, it is important to determine the optimum numbers of MHRs required for efficient production of jobs in the FMS. In the present work, the requirement of MHRs is optimized for different FMS layouts by using a heuristic procedure. Initially, a mathematical model is proposed to identify the MHRs requirement to perform the material handling activities in the FMS, later on, the model is optimized by simulating a novel heuristic procedure to find the required optimum number of MHRs in the FMS. The proposed methodology is found to be generic enough and can also be applied in various industries employing the MHRs. © 2019 by the authors; licensee Growing Science, Canada.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.4.002","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/J.JPM.2019.4.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 11

Abstract

Article history: Received: March 8 2019 Received in revised format: April 2 2019 Accepted: April 2 2019 Available online: April 4 2019 The application of material handling robots (MHRs) has been commonly observed in flexible manufacturing systems (FMS) for efficient material handling activities. In order to gain maximum throughput, minimum tardiness from the minimum investment of funds for the material handling activities, it is important to determine the optimum numbers of MHRs required for efficient production of jobs in the FMS. In the present work, the requirement of MHRs is optimized for different FMS layouts by using a heuristic procedure. Initially, a mathematical model is proposed to identify the MHRs requirement to perform the material handling activities in the FMS, later on, the model is optimized by simulating a novel heuristic procedure to find the required optimum number of MHRs in the FMS. The proposed methodology is found to be generic enough and can also be applied in various industries employing the MHRs. © 2019 by the authors; licensee Growing Science, Canada.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于启发式算法的物料搬运机器人车队规模优化
文章历史:接收:2019年3月8日接收:修订格式:2019年4月2日接收:2019年4月2日在线提供:2019年4月4日材料搬运机器人(mhr)的应用已在柔性制造系统(FMS)中普遍观察到,以实现高效的材料搬运活动。为了在物料处理活动中以最小的资金投入获得最大的吞吐量,最小的延迟,确定FMS中有效生产作业所需的最佳mhr数量是很重要的。在本工作中,采用启发式方法对不同FMS布局的mhr要求进行了优化。首先,提出了一个数学模型来确定在FMS中执行物料搬运活动所需的mhr,然后,通过模拟一种新的启发式过程来优化模型,以找到FMS中所需的最佳mhr数量。所提出的方法被认为是足够通用的,也可以应用于采用MHRs的各种行业。©2019作者所有;加拿大Growing Science公司
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
期刊最新文献
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times Review of sustainable concrete based on photocatalytic to reduce the environmental impact in large works in Peru Development of a robust multi-objective model for green capacitated location-routing under crisis conditions The effect of tourism village development project on economic sustainability through tourism villages based on natural and cultural potentials Structural equation modeling of critical success factors in the programs of development regional
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1