MCDM approach to investigate the effectiveness of SCRUM events in minimizing risk factors in project management

IF 1.3 Q4 ENGINEERING, INDUSTRIAL Journal of Project Management Pub Date : 2023-01-01 DOI:10.5267/j.jpm.2023.7.001
G. Yücenur
{"title":"MCDM approach to investigate the effectiveness of SCRUM events in minimizing risk factors in project management","authors":"G. Yücenur","doi":"10.5267/j.jpm.2023.7.001","DOIUrl":null,"url":null,"abstract":"Traditional project management methods have been used for many years in the implementation and management of projects. With the publication of the agile manifesto in 2001, the interest in agile methods increased and successful results were obtained in the execution and solution of complex projects with agile approaches. Agile approach consists of different structures that can be named as framework or method. Among these agile methods, which are selected and applied according to the suitability and purpose of the project, the most frequently preferred one is SCRUM. In this study, SCRUM, an agile project management technique that has been used frequently in recent years in order to develop a flexible project management process, has been examined, and the effectiveness of the events of the SCRUM technique in minimizing the risks that arise in project management has been evaluated. Determining the effectiveness of these SCRUM events, which each agile project team implements in turn, is very important for the correct and effective allocation of resources. For this purpose, a multi-criteria decision-making model has been proposed to evaluate the effectiveness of 4 SCRUM events within the scope of this study. While the importance weights of the 24 project management risk factors proposed in the solution phase of the created model were determined by the SWARA method, the SCRUM events were evaluated with the WASPAS, COPRAS and EDAS methods and the solution values found by three different methods were compared.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2023.7.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

Traditional project management methods have been used for many years in the implementation and management of projects. With the publication of the agile manifesto in 2001, the interest in agile methods increased and successful results were obtained in the execution and solution of complex projects with agile approaches. Agile approach consists of different structures that can be named as framework or method. Among these agile methods, which are selected and applied according to the suitability and purpose of the project, the most frequently preferred one is SCRUM. In this study, SCRUM, an agile project management technique that has been used frequently in recent years in order to develop a flexible project management process, has been examined, and the effectiveness of the events of the SCRUM technique in minimizing the risks that arise in project management has been evaluated. Determining the effectiveness of these SCRUM events, which each agile project team implements in turn, is very important for the correct and effective allocation of resources. For this purpose, a multi-criteria decision-making model has been proposed to evaluate the effectiveness of 4 SCRUM events within the scope of this study. While the importance weights of the 24 project management risk factors proposed in the solution phase of the created model were determined by the SWARA method, the SCRUM events were evaluated with the WASPAS, COPRAS and EDAS methods and the solution values found by three different methods were compared.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
MCDM方法来调查SCRUM事件在最小化项目管理中的风险因素方面的有效性
传统的项目管理方法已经在项目的实施和管理中使用了多年。随着2001年敏捷宣言的发布,人们对敏捷方法的兴趣增加了,并且在使用敏捷方法执行和解决复杂项目方面取得了成功的结果。敏捷方法由不同的结构组成,这些结构可以命名为框架或方法。在这些根据项目的适用性和目的选择和应用的敏捷方法中,最常用的是SCRUM。在本研究中,为了开发灵活的项目管理过程,近年来经常使用的敏捷项目管理技术SCRUM已经被检查,并评估了SCRUM技术的事件在最小化项目管理中出现的风险方面的有效性。确定这些SCRUM事件(每个敏捷项目团队轮流实施)的有效性,对于正确有效地分配资源非常重要。为此,在本研究范围内,提出了一个多标准决策模型来评估4个SCRUM事件的有效性。虽然在创建模型的解决方案阶段提出的24个项目管理风险因素的重要性权重是由SWARA方法确定的,但SCRUM事件是用WASPAS、COPRAS和EDAS方法评估的,并比较了三种不同方法发现的解决方案值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
期刊最新文献
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times Review of sustainable concrete based on photocatalytic to reduce the environmental impact in large works in Peru Development of a robust multi-objective model for green capacitated location-routing under crisis conditions The effect of tourism village development project on economic sustainability through tourism villages based on natural and cultural potentials Structural equation modeling of critical success factors in the programs of development regional
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1