Catalogue of example instrumentation and monitoring systems for tailings dams in Australia

Luke Clarkson, David J. Williams
{"title":"Catalogue of example instrumentation and monitoring systems for tailings dams in Australia","authors":"Luke Clarkson, David J. Williams","doi":"10.1080/25726668.2021.1901026","DOIUrl":null,"url":null,"abstract":"ABSTRACT New literature, mining regulators, insurance firms, and mining practitioners are calling for increased diligence in the form of real-time monitoring: but what can the industry offer in response? This research establishes a centralisation of instrumentation systems suitable for tailings dams, discussing the specifications, advantages, and disadvantages of each. This paper describes an understanding of dataloggers and sensor nodes, sensor networks, and online monitoring systems critical to the transmission and reception of sensor data across vast and remote site areas. Collaboration with suppliers discovered systems which enable reliable, efficient, and real-time transmission of instrumentation data, ready for interpretation. This paper aims to translate traditionally electrical and systems engineering terminology into a reference base suitable for the broad range of tailings dam practitioners. This reference base is anticipated to help facilitate informed discussions and encourage deployment of appropriate instrumentation systems that are suitable to the practitioner’s short- and long-term intent.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"354 1","pages":"119 - 129"},"PeriodicalIF":1.8000,"publicationDate":"2021-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/25726668.2021.1901026","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2021.1901026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 1

Abstract

ABSTRACT New literature, mining regulators, insurance firms, and mining practitioners are calling for increased diligence in the form of real-time monitoring: but what can the industry offer in response? This research establishes a centralisation of instrumentation systems suitable for tailings dams, discussing the specifications, advantages, and disadvantages of each. This paper describes an understanding of dataloggers and sensor nodes, sensor networks, and online monitoring systems critical to the transmission and reception of sensor data across vast and remote site areas. Collaboration with suppliers discovered systems which enable reliable, efficient, and real-time transmission of instrumentation data, ready for interpretation. This paper aims to translate traditionally electrical and systems engineering terminology into a reference base suitable for the broad range of tailings dam practitioners. This reference base is anticipated to help facilitate informed discussions and encourage deployment of appropriate instrumentation systems that are suitable to the practitioner’s short- and long-term intent.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
澳大利亚尾矿坝实例仪表和监测系统目录
新文献、矿业监管机构、保险公司和矿业从业者都在呼吁以实时监控的形式增加尽职调查:但行业能提供什么回应?本研究建立了一个适用于尾矿坝的集中仪器系统,讨论了每种仪器的规格、优点和缺点。本文描述了对数据采集器和传感器节点、传感器网络和在线监控系统的理解,这些系统对于在广阔和偏远的站点区域传输和接收传感器数据至关重要。与供应商合作,发现了能够可靠、高效和实时传输仪器数据的系统,并准备好进行解释。本文旨在将传统的电气和系统工程术语翻译成适合广泛的尾矿坝从业人员的参考基础。这个参考基础预计将有助于促进知情的讨论,并鼓励部署适合从业者短期和长期意图的适当仪器系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.20
自引率
9.10%
发文量
5
期刊最新文献
Digital twins in the minerals industry – a comprehensive review Mining Metaverse – a future collaborative tool for best practice mining Reliability evaluation of CAN-bus connectors with tailored testing Sustainable open pit fleet management system: integrating economic and environmental objectives into truck allocation A Genetic algorithm scheme for large scale open-pit mine production scheduling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1