BIM Based Time Management Among Construction Contractors in Turkey

Ayşen Saraç Çıracıoğlu, H. Yaman
{"title":"BIM Based Time Management Among Construction Contractors in Turkey","authors":"Ayşen Saraç Çıracıoğlu, H. Yaman","doi":"10.3311/ppar.17918","DOIUrl":null,"url":null,"abstract":"In both developing and industrialised countries, due to numerous time-related problems of construction projects, BIM-based time management, 4D BIM, plays an increasingly critical role within the industry. This study investigates the planning and scheduling problems, BIM application level, and BIM-based scheduling implementation by the lead construction companies in Turkey. Despite the critical importance of the planning department in construction companies, the planning and BIM integration levels have scarcely been investigated from the contractor perspective in Turkey. This paper presents the outcomes of 16 semi-structured interviews (SSI) with managers of the leading Turkish contractors selected from 100 of ENR’s 2019 Top 250 International Contractors list; a list of issues are outlined. The current situation escalates problems like tendering with missing project documents, examining 2D project drawings while scheduling, fragmentation, project manager’s reluctance to use and follow the project schedule, issues with updating the schedule as per construction improvements and quantities, and a lack of investment for BIM implementation. The research findings, ultimately, aim to help contractors improve their processes. Although this study’s findings are obtained from interviews with lead Turkish contractors, it is not limited in terms of geographic context since the interviewed contractors work worldwide.","PeriodicalId":33684,"journal":{"name":"Periodica Polytechnica Architecture","volume":"76 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Periodica Polytechnica Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ppar.17918","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In both developing and industrialised countries, due to numerous time-related problems of construction projects, BIM-based time management, 4D BIM, plays an increasingly critical role within the industry. This study investigates the planning and scheduling problems, BIM application level, and BIM-based scheduling implementation by the lead construction companies in Turkey. Despite the critical importance of the planning department in construction companies, the planning and BIM integration levels have scarcely been investigated from the contractor perspective in Turkey. This paper presents the outcomes of 16 semi-structured interviews (SSI) with managers of the leading Turkish contractors selected from 100 of ENR’s 2019 Top 250 International Contractors list; a list of issues are outlined. The current situation escalates problems like tendering with missing project documents, examining 2D project drawings while scheduling, fragmentation, project manager’s reluctance to use and follow the project schedule, issues with updating the schedule as per construction improvements and quantities, and a lack of investment for BIM implementation. The research findings, ultimately, aim to help contractors improve their processes. Although this study’s findings are obtained from interviews with lead Turkish contractors, it is not limited in terms of geographic context since the interviewed contractors work worldwide.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于BIM的土耳其建筑承包商时间管理
无论是在发展中国家还是工业化国家,由于建筑项目存在大量与时间相关的问题,基于BIM的时间管理4D BIM在行业中发挥着越来越重要的作用。本研究调查了土耳其主要建筑公司的规划和调度问题、BIM应用水平和基于BIM的调度实施。尽管规划部门在建筑公司中至关重要,但在土耳其,很少从承包商的角度对规划和BIM集成水平进行调查。本文介绍了16次半结构化访谈(SSI)的结果,访谈对象是从ENR 2019年250强国际承包商名单中选出的100家土耳其领先承包商的经理;列出了一系列问题。目前的情况加剧了一些问题,如投标时缺少项目文件,在调度时检查2D项目图纸,碎片化,项目经理不愿意使用和遵循项目进度计划,根据施工改进和数量更新进度计划的问题,以及缺乏对BIM实施的投资。研究结果的最终目的是帮助承包商改进他们的流程。虽然这项研究的结果是通过对土耳其主要承包商的采访获得的,但它并不局限于地理背景,因为被采访的承包商在世界各地工作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
期刊最新文献
The Urban Morphology of Edirne Imperial Past, Neoliberal Present, Dependent Future: A Political-Economic Approach to Urban Development of Bursa Bibliometric Analysis of Key Issues and Objectives in Environmental, Economic, and Social Sustainable Project Management The Urban Walking Tour as an Experience-based Methodology for Built Environment Education in Budapest Determining the Criteria Related to the Preference of Contemporary Mosques by the Analytic Hierarchy Process (AHP) Method within the Context of User-centered Design
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1