Substantiating the parameters of deep surfacemine reloading works during operation of combined conveyor-railway transport

O. Shustov, A. Adamchuk
{"title":"Substantiating the parameters of deep surfacemine reloading works during operation of combined conveyor-railway transport","authors":"O. Shustov, A. Adamchuk","doi":"10.33271/crpnmu/68.103","DOIUrl":null,"url":null,"abstract":"Purpose. Improvement of technological schemes of work of reloading points with substantiation of parameters of their work at working off of a deep zone of an iron ore open cast mine. Method. To achieve this purpose, the following research methods were used: analytical, graphical and mathematical modeling, the method of logical engineering solutions, comparison of options and analogies. These methods were used to substantiate the parameters of the transshipment points when using the combined conveyor-railway transport, determining the number of dump trucks from their capacity to increase the production capacity of the iron ore open cast mine. Results. Application of the developed device for reloading of rocks in railway transport, allows to reduce a transport and cargo platform by 25-30 m, thereby, to reduce volume of excavation of over-burden to 250-280 thousand m 3 , to rationally use extraction-loading and transport equipment in one line with reduction of time of loading of dump trucks and formation of a stack. Scientific novelty. For the first time the parameters of reloading points operation in the operation of combined conveyor-railway transport were substantiated and the number of dump trucks on the transport horizon was determined depending on their load capacity and production capacity of the iron ore quarry; with the productivity of the ore quarry 18 million tons / year, their number varies between 37-104 depending on the load capacity of the cars and taking into account the calendar plan of the mining enterprise. The dependence of the number of dump trucks on the horizon on their car-rying capacity and productivity of the ore quarry has been established Practical meaning. It was found that in the conditions of deep iron ore open cast mines it is most effective to use a combination of conveyor-railway transport with the construction of an installation for transshipment of rocks, which will reduce the cost of field development to 6.7-8.9 million USD.","PeriodicalId":10466,"journal":{"name":"Collection of Research Papers of the National Mining University","volume":"217 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Collection of Research Papers of the National Mining University","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33271/crpnmu/68.103","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose. Improvement of technological schemes of work of reloading points with substantiation of parameters of their work at working off of a deep zone of an iron ore open cast mine. Method. To achieve this purpose, the following research methods were used: analytical, graphical and mathematical modeling, the method of logical engineering solutions, comparison of options and analogies. These methods were used to substantiate the parameters of the transshipment points when using the combined conveyor-railway transport, determining the number of dump trucks from their capacity to increase the production capacity of the iron ore open cast mine. Results. Application of the developed device for reloading of rocks in railway transport, allows to reduce a transport and cargo platform by 25-30 m, thereby, to reduce volume of excavation of over-burden to 250-280 thousand m 3 , to rationally use extraction-loading and transport equipment in one line with reduction of time of loading of dump trucks and formation of a stack. Scientific novelty. For the first time the parameters of reloading points operation in the operation of combined conveyor-railway transport were substantiated and the number of dump trucks on the transport horizon was determined depending on their load capacity and production capacity of the iron ore quarry; with the productivity of the ore quarry 18 million tons / year, their number varies between 37-104 depending on the load capacity of the cars and taking into account the calendar plan of the mining enterprise. The dependence of the number of dump trucks on the horizon on their car-rying capacity and productivity of the ore quarry has been established Practical meaning. It was found that in the conditions of deep iron ore open cast mines it is most effective to use a combination of conveyor-railway transport with the construction of an installation for transshipment of rocks, which will reduce the cost of field development to 6.7-8.9 million USD.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
确定了输送机-铁路联运运行中深部地表地雷重装工程参数
目的。对某铁矿露天矿深部采空区重装点工作工艺方案的改进及重装点工作参数的确定。方法。为了达到这一目的,使用了以下研究方法:分析,图形和数学建模,逻辑工程解的方法,选项比较和类比。利用这些方法确定了铁路与输送机联合运输时转运点的参数,从自卸车的运力出发确定自卸车的数量,以提高铁矿露天矿的生产能力。结果。所研制的岩石重装装置在铁路运输中的应用,可使运输和货物平台减少25-30米,从而使超载开挖量减少到25- 28万立方米,合理使用一条线的提取-装载和运输设备,减少自卸车装载时间,形成堆垛。科学的新奇。首次确定了铁路-输送机联合运输作业中重装点作业参数,并根据自卸车的载重能力和铁矿采石场的生产能力确定了运输水平上自卸车的数量;采石场的生产能力为1800万吨/年,根据车辆的载重能力和考虑到矿山企业的日历计划,其数量在37-104之间变化。地平线上自卸车的数量与采石场的运载能力和生产能力的关系具有一定的现实意义。研究发现,在深部铁矿露天矿条件下,采用输送机-铁路运输与建设岩石转运设施相结合的运输方式最为有效,可将现场开发成本降低至670 - 890万美元。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of the operation of the electrical current supply scheme to two cables of a multilayer wire rope Peculiarities of the total content of metals in oil deposits of the Dnipro-Donetsk depression Research of temperature phenomena during the mechanical processing of steels and iron Using applied program packages in determining optimum cutting modes Drilling mechanical hydrogen extraction at mining enterprises of Ukraine
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1