{"title":"Nigeria JV Onshore OHGP Recent Experience: Beyond Flawless Execution","authors":"Kayode Adegbulugbe, Akunna Ambakederemo, C. Elendu","doi":"10.2118/207084-ms","DOIUrl":null,"url":null,"abstract":"\n An oil producing swamp field, BX, is located in the coastal region of the western Niger Delta with an average water depth of 15 – 20 ft. The wells in the most recent development drilling campaign were designed as horizontal wells with critical well objective of meeting the target oil production rates with sand control. In order to achieve these goals, the sand control methodology deployed is the Open Hole Gravel Pack (OHGP) pumped through Concentric Annular Pack Screen (CAPS) system.\n This completion methodology has similar comparisons to the AX field completions where 19 completions were successfully installed between 2016 and 2018. The lessons learnt from the AX campaign were implemented on the BX campaign and this contributed to the campaign's near-flawless completion execution evidenced by the world class operational excellence, very low Non-Productive Times (NPTs) best-in-class production performances with no sand production\n However, the following opportunities were identified and implemented during the BX campaign focused on either increasing operational efficiency or preventing post-completion productivity impairment:Elimination of slickline required for tubing test operations by incorporating a \"RH\" catcher sub into the completion designPerforming required analysis and implementing procedural change to ensure that the change from WBM to NAF does not compromise completion performance due to the presence of reactive shales intervals encountered in the lateralDeveloping and implementing an enhanced fluid loss protocol to address the fluid loss event in one of the BX well that prevented the execution of OHGP pumping operation in the well.\n The implementation of these opportunities contributed significantly to the continued consistent delivery of superior completions performance in the BX field. This paper aims to provide a background to these opportunities and highlights the steps and processes that were applied to ensure their flawless implementation.","PeriodicalId":10899,"journal":{"name":"Day 2 Tue, August 03, 2021","volume":"16 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, August 03, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207084-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

An oil producing swamp field, BX, is located in the coastal region of the western Niger Delta with an average water depth of 15 – 20 ft. The wells in the most recent development drilling campaign were designed as horizontal wells with critical well objective of meeting the target oil production rates with sand control. In order to achieve these goals, the sand control methodology deployed is the Open Hole Gravel Pack (OHGP) pumped through Concentric Annular Pack Screen (CAPS) system. This completion methodology has similar comparisons to the AX field completions where 19 completions were successfully installed between 2016 and 2018. The lessons learnt from the AX campaign were implemented on the BX campaign and this contributed to the campaign's near-flawless completion execution evidenced by the world class operational excellence, very low Non-Productive Times (NPTs) best-in-class production performances with no sand production However, the following opportunities were identified and implemented during the BX campaign focused on either increasing operational efficiency or preventing post-completion productivity impairment:Elimination of slickline required for tubing test operations by incorporating a "RH" catcher sub into the completion designPerforming required analysis and implementing procedural change to ensure that the change from WBM to NAF does not compromise completion performance due to the presence of reactive shales intervals encountered in the lateralDeveloping and implementing an enhanced fluid loss protocol to address the fluid loss event in one of the BX well that prevented the execution of OHGP pumping operation in the well. The implementation of these opportunities contributed significantly to the continued consistent delivery of superior completions performance in the BX field. This paper aims to provide a background to these opportunities and highlights the steps and processes that were applied to ensure their flawless implementation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
近期经验:超越完美执行
BX是一个产油沼泽油田,位于尼日尔三角洲西部沿海地区,平均水深为15 - 20英尺。在最近的开发钻井活动中,这些井被设计为水平井,其关键目标是通过防砂来满足目标产油量。为了实现这些目标,采用的防砂方法是通过同心环空充填筛管(CAPS)系统泵入裸眼砾石充填(OHGP)。这种完井方法与2016年至2018年期间成功安装了19套完井的AX油田完井方法相似。从AX作业中吸取的经验教训被应用到BX作业中,这使得该作业的完井执行近乎完美,证明了世界级的卓越运营,非常低的非生产时间(NPTs),一流的生产性能,没有出砂。在BX作业期间,为了提高作业效率或防止完井后产能受损,确定并实施了以下措施:在完井设计中加入“RH”捕集器,消除了油管测试作业所需的滑绳。进行必要的分析并实施程序变更,以确保从WBM到NAF的变更不会因活性页岩的存在而影响完井性能开发并实施强化失液方案,以解决其中一口BX井的失液事件,该井无法执行OHGP泵送作业。这些机会的实施为BX油田持续提供优越的完井性能做出了重大贡献。本文旨在提供这些机会的背景,并强调为确保其完美实现而应用的步骤和流程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Production and Performance Evaluation of Biodetergents as an Alternative to Conventional Drilling Detergent Comparative Evaluation of Artificial Intelligence Models for Drilling Rate of Penetration Prediction The Limitation of Reservoir Saturation Logging Tool in a Case of a Deeper Reservoir Flow into a Shallower Reservoir Within the Same Wellbore Surrogate-Based Analysis of Chemical Enhanced Oil Recovery – A Comparative Analysis of Machine Learning Model Performance Understanding the Impacts of Backpressure & Risk Analysis of Different Gas Hydrate Blockage Scenarios on the Integrity of Subsea Flowlines
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1