Designing Deadlines

IF 10.5 1区 经济学 Q1 ECONOMICS American Economic Review Pub Date : 2022-03-01 DOI:10.1257/aer.20200212
Erik Madsen
{"title":"Designing Deadlines","authors":"Erik Madsen","doi":"10.1257/aer.20200212","DOIUrl":null,"url":null,"abstract":"I study how an organization should manage a project of uncertain scope, when it is advised by a privately informed expert who prefers to prolong his employment. The optimal long-term contract combines a deadline for project completion and incentive payments which decline as the deadline approaches. When the firm can additionally learn about the project's state from output, the optimal deadline exhibits variable sensitivity to output, with a hard deadline at the outset of the project and increasingly soft deadlines as the project's performance declines. (JEL D21, D82, D86, G31, J33, M52, M54)","PeriodicalId":48472,"journal":{"name":"American Economic Review","volume":"166 1","pages":""},"PeriodicalIF":10.5000,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"American Economic Review","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.1257/aer.20200212","RegionNum":1,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ECONOMICS","Score":null,"Total":0}
引用次数: 3

Abstract

I study how an organization should manage a project of uncertain scope, when it is advised by a privately informed expert who prefers to prolong his employment. The optimal long-term contract combines a deadline for project completion and incentive payments which decline as the deadline approaches. When the firm can additionally learn about the project's state from output, the optimal deadline exhibits variable sensitivity to output, with a hard deadline at the outset of the project and increasingly soft deadlines as the project's performance declines. (JEL D21, D82, D86, G31, J33, M52, M54)
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
设计的最后期限
我研究的是一个组织应该如何管理一个范围不确定的项目,当这个项目是由一个私下知情的专家建议的,这个专家更愿意延长他的雇佣期。最优的长期合同包括项目完成的最后期限和奖励付款,奖励付款随着最后期限的临近而减少。当企业可以从产出中额外了解到项目的状态时,最优期限对产出表现出可变的敏感性,在项目开始时是硬期限,随着项目绩效的下降,软期限越来越多。(jl d21, d82, d86, g31, j33, m52, m54)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
18.60
自引率
2.80%
发文量
122
期刊介绍: The American Economic Review (AER) stands as a prestigious general-interest economics journal. Founded in 1911, it holds the distinction of being one of the nation's oldest and most esteemed scholarly journals in economics. With a commitment to academic excellence, the AER releases 12 issues annually, featuring articles that span a wide spectrum of economic topics.
期刊最新文献
Disentangling Moral Hazard and Adverse Selection The Ends of 27 Big Depressions America, Jump-Started: World War II R&D and the Takeoff of the US Innovation System Worth Your Weight: Experimental Evidence on the Benefits of Obesity in Low-Income Countries Second-Best Fairness: The Trade-Off between False Positives and False Negatives
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1