A Set of Solutions to Reduce the Water Cut in Well Production

A. A. Isaev, R. Takhautdinov, V. I. Malykhin, A. A. Sharifullin
{"title":"A Set of Solutions to Reduce the Water Cut in Well Production","authors":"A. A. Isaev, R. Takhautdinov, V. I. Malykhin, A. A. Sharifullin","doi":"10.2118/206462-ms","DOIUrl":null,"url":null,"abstract":"\n This paper presents a set of activities to reduce water cut and develop a technical solution to measure water cut:\n measurement of watercut, flow rates and gas-oil ratio of a well output using a mobile unit. tracer tests and conformance control operations - watercut of reacting wells within Bashkirian stage decreased by 16,6% after those operations were performed. water flow control, flow deviation and remedying production casing damages made it possible to reduce extraction of produced water and, accordingly, the cost of oil production. development of Liquid Phase Separation Device enabled alternate delivery of oil and water to the intake of downhole pump.","PeriodicalId":11017,"journal":{"name":"Day 2 Wed, October 13, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, October 13, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206462-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper presents a set of activities to reduce water cut and develop a technical solution to measure water cut: measurement of watercut, flow rates and gas-oil ratio of a well output using a mobile unit. tracer tests and conformance control operations - watercut of reacting wells within Bashkirian stage decreased by 16,6% after those operations were performed. water flow control, flow deviation and remedying production casing damages made it possible to reduce extraction of produced water and, accordingly, the cost of oil production. development of Liquid Phase Separation Device enabled alternate delivery of oil and water to the intake of downhole pump.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一套降低油井生产含水率的解决方案
本文介绍了一系列降低含水率的措施,并开发了一种测量含水率的技术解决方案:使用移动设备测量井产出的含水率、流速和气油比。示踪剂测试和一致性控制操作-在这些操作之后,Bashkirian阶段反应井的含水率降低了16.6%。通过水流控制、流偏和修复生产套管损坏,可以减少采出水的采出,从而降低石油生产成本。液相分离装置的开发使油和水交替输送到井下泵的进水口。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Technological Features of Associated Petroleum Gas Miscible Injection MGI in Order to Increase Oil Recovery at a Remote Group of Fields in Western Siberia Interdisciplinary Approach for Wellbore Stability During Slimhole Drilling at Volga-Urals Basin Oilfield A Set of Solutions to Reduce the Water Cut in Well Production Production Optimiser Pilot for the Large Artificially-Lifted and Mature Samotlor Oil Field Artificial Neural Network as a Method for Pore Pressure Prediction throughout the Field
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1