Climate change driven events and projects’ vulnerability as element of the EIA procedure – Application of the IAEA STE selection criteria

R. Urbaniak, D. Absalon
{"title":"Climate change driven events and projects’ vulnerability as element of the EIA procedure – Application of the IAEA STE selection criteria","authors":"R. Urbaniak, D. Absalon","doi":"10.1063/1.5138042","DOIUrl":null,"url":null,"abstract":"There is a clear cause-and-effect interaction at play between environment and the project itself that acts two-way, making the project’s suitable site selection of utmost importance. As general public becomes more and more aware of environmental issues that need to be addressed in the course of licensing procedures (Environmental Impact Assessment [EIA]) many aspects that can affect a planned development’s site suitability remain hidden from the public view and yet crucial as they can determine investment’s not only impact spatial boundaries but even its viability. Determination of a planned development’s location, therefore, should be preceded by detailed siting and environmental studies completing of which guarantee removal or at least occurrence probability reduction from a financial equation of significant uncertainties that could impact an investment at either the designing or operating stage. In the paper application of conventional energy sector methodologies as well as site selection criteria of the Safety Standards, International Atomic Energy Agency [IAEA] for nuclear installations as mutually complementing tools are being discussed with a special consideration given to climatic, geological and legislative issues.There is a clear cause-and-effect interaction at play between environment and the project itself that acts two-way, making the project’s suitable site selection of utmost importance. As general public becomes more and more aware of environmental issues that need to be addressed in the course of licensing procedures (Environmental Impact Assessment [EIA]) many aspects that can affect a planned development’s site suitability remain hidden from the public view and yet crucial as they can determine investment’s not only impact spatial boundaries but even its viability. Determination of a planned development’s location, therefore, should be preceded by detailed siting and environmental studies completing of which guarantee removal or at least occurrence probability reduction from a financial equation of significant uncertainties that could impact an investment at either the designing or operating stage. In the paper application of conventional energy sector methodologies as well as site selection criteria of t...","PeriodicalId":20565,"journal":{"name":"PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING 2019 (ICCMSE-2019)","volume":"39 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING 2019 (ICCMSE-2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1063/1.5138042","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

There is a clear cause-and-effect interaction at play between environment and the project itself that acts two-way, making the project’s suitable site selection of utmost importance. As general public becomes more and more aware of environmental issues that need to be addressed in the course of licensing procedures (Environmental Impact Assessment [EIA]) many aspects that can affect a planned development’s site suitability remain hidden from the public view and yet crucial as they can determine investment’s not only impact spatial boundaries but even its viability. Determination of a planned development’s location, therefore, should be preceded by detailed siting and environmental studies completing of which guarantee removal or at least occurrence probability reduction from a financial equation of significant uncertainties that could impact an investment at either the designing or operating stage. In the paper application of conventional energy sector methodologies as well as site selection criteria of the Safety Standards, International Atomic Energy Agency [IAEA] for nuclear installations as mutually complementing tools are being discussed with a special consideration given to climatic, geological and legislative issues.There is a clear cause-and-effect interaction at play between environment and the project itself that acts two-way, making the project’s suitable site selection of utmost importance. As general public becomes more and more aware of environmental issues that need to be addressed in the course of licensing procedures (Environmental Impact Assessment [EIA]) many aspects that can affect a planned development’s site suitability remain hidden from the public view and yet crucial as they can determine investment’s not only impact spatial boundaries but even its viability. Determination of a planned development’s location, therefore, should be preceded by detailed siting and environmental studies completing of which guarantee removal or at least occurrence probability reduction from a financial equation of significant uncertainties that could impact an investment at either the designing or operating stage. In the paper application of conventional energy sector methodologies as well as site selection criteria of t...
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
气候变化驱动的事件和项目的脆弱性作为环境影响评估程序的要素——国际原子能机构STE选择标准的应用
环境与项目本身之间存在着明显的因果关系,这种关系是双向的,因此项目的选址至关重要。随着公众越来越意识到在审批过程中需要解决的环境问题(环境影响评估[EIA]),许多可能影响规划发展的场地适宜性的方面仍然隐藏在公众视野之外,但它们却至关重要,因为它们不仅可以影响空间边界,甚至可以决定投资的可行性。因此,在确定计划发展的地点之前,应先完成详细的选址和环境研究,以保证在设计或运营阶段可能影响投资的重大不确定性的财务方程式中消除或至少减少发生概率。在文件中讨论了传统能源部门方法的应用以及国际原子能机构将核设施作为相互补充的工具的安全标准的选址标准,并特别考虑到气候、地质和立法问题。环境与项目本身之间存在着明显的因果关系,这种关系是双向的,因此项目的选址至关重要。随着公众越来越意识到在审批过程中需要解决的环境问题(环境影响评估[EIA]),许多可能影响规划发展的场地适宜性的方面仍然隐藏在公众视野之外,但它们却至关重要,因为它们不仅可以影响空间边界,甚至可以决定投资的可行性。因此,在确定计划发展的地点之前,应先完成详细的选址和环境研究,以保证在设计或运营阶段可能影响投资的重大不确定性的财务方程式中消除或至少减少发生概率。本文介绍了传统的能源部门方法的应用,以及t - t的选址标准。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Selected time space characteristics in female pole vault Wave polarisation in a dynamic elastic lattice Symbolic-numeric research of leaky modes in planar dielectric electromagnetic waveguide as inhomogeneous waves Derivation of the concepts in data modelling Preface of the “GIS, Remote Sensing and Dendrochronology in Geohazards”
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1