Transparency and Risk Allocation in PPP: Addressing Complex Contracts' Mathematical Formulas in the Portuguese Case

IF 0.5 4区 管理学 Q4 POLITICAL SCIENCE Lex Localis-Journal of Local Self-Government Pub Date : 2022-04-21 DOI:10.4335/10.4335/20.2.435-453(2022)
P. Morais, José Alberto da Rosa de Matos, Noémia Bessa Vilela, Ž. Oplotnik
{"title":"Transparency and Risk Allocation in PPP: Addressing Complex Contracts' Mathematical Formulas in the Portuguese Case","authors":"P. Morais, José Alberto da Rosa de Matos, Noémia Bessa Vilela, Ž. Oplotnik","doi":"10.4335/10.4335/20.2.435-453(2022)","DOIUrl":null,"url":null,"abstract":"Concept of partnership between public and private entities, commonly addressed as »Public private partnership« or PPP, have spread all over the world as an innovative model to deliver public services and to help established public infra-structure; as railways and roads, water supply facilities and sewerage systems, other communal services and public infrastructure, even building and managing hospitals, elderly homes, etc. In order to serve the public interest, PPP projects should be based upon a negotiated allocation of risk, which means that project risks should be distributed equaly between the partners. However, issues of transparency, good governance and public accountability have been at risk in the process. Through the Portuguese case of PPP involving the reward contract for the construction and maintenance of highways, the argument for the need of transparent and readable information is presented.","PeriodicalId":51875,"journal":{"name":"Lex Localis-Journal of Local Self-Government","volume":"2 1","pages":""},"PeriodicalIF":0.5000,"publicationDate":"2022-04-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Lex Localis-Journal of Local Self-Government","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.4335/10.4335/20.2.435-453(2022)","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"POLITICAL SCIENCE","Score":null,"Total":0}
引用次数: 1

Abstract

Concept of partnership between public and private entities, commonly addressed as »Public private partnership« or PPP, have spread all over the world as an innovative model to deliver public services and to help established public infra-structure; as railways and roads, water supply facilities and sewerage systems, other communal services and public infrastructure, even building and managing hospitals, elderly homes, etc. In order to serve the public interest, PPP projects should be based upon a negotiated allocation of risk, which means that project risks should be distributed equaly between the partners. However, issues of transparency, good governance and public accountability have been at risk in the process. Through the Portuguese case of PPP involving the reward contract for the construction and maintenance of highways, the argument for the need of transparent and readable information is presented.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PPP中的透明度和风险分配:解决葡萄牙案例中复杂合同的数学公式
公共和私营实体之间的伙伴关系概念,通常被称为“公私伙伴关系”或PPP,作为一种提供公共服务和帮助建立公共基础设施的创新模式在世界各地传播;如铁路和公路、供水设施和污水处理系统、其他公共服务和公共基础设施,甚至建造和管理医院、养老院等。为了服务于公共利益,PPP项目应该建立在风险协商分配的基础上,即项目风险在合作伙伴之间平均分配。然而,在这一过程中,透明度、善政和公共问责等问题受到了威胁。通过葡萄牙涉及公路建设和维护奖励合同的PPP案例,提出了透明和可读信息的必要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.10
自引率
25.00%
发文量
31
期刊最新文献
(Correct) Calculation of Payment During Annual Leave and Allowance in Lieu of Leave not Taken in the Public and Private Sectors and the Impact of the Case-law of the Court of Justice on the Decision-making of the Slovenian Courts The Importance of the Application of Controlling in the Management of Public Enterprises whose Founders are Local Self-government Units: The Example of Republic of Serbia The Development of Innovation Knowledge Management System in Tangerang Regency Local Government Vertical Upward Accountability, Oversight, and the Intervention Mechanism in South Africa Position of the Local Development Fee in the System of Local Taxes and Fees in the Slovak Republic
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1