Bayonne Bridge: Raising the Roadway

Matthew Spoth, Roger Q. Haight
{"title":"Bayonne Bridge: Raising the Roadway","authors":"Matthew Spoth, Roger Q. Haight","doi":"10.1680/jbren.21.00069","DOIUrl":null,"url":null,"abstract":"The Port Authority of New York & New Jersey's Bayonne Bridge crosses the entrance to the Ports of Newark and Elizabeth, New Jersey. The longest steel truss arch span in the world when it opened in 1931, the bridge was designed by Othmar Ammann. To maintain the economic vitality of the ports, the original 46 m navigational clearance needed to be raised to 65.5 m to accommodate mega container ships passing through the newly widened Panama Canal. Precast concrete segmental construction was used along with an innovative staged construction approach to avoid long term bridge closures and to expedite the construction schedule. The new navigational clearance was attained in 2017 and project completion occurred in mid-2019.","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"71 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2022-09-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jbren.21.00069","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

The Port Authority of New York & New Jersey's Bayonne Bridge crosses the entrance to the Ports of Newark and Elizabeth, New Jersey. The longest steel truss arch span in the world when it opened in 1931, the bridge was designed by Othmar Ammann. To maintain the economic vitality of the ports, the original 46 m navigational clearance needed to be raised to 65.5 m to accommodate mega container ships passing through the newly widened Panama Canal. Precast concrete segmental construction was used along with an innovative staged construction approach to avoid long term bridge closures and to expedite the construction schedule. The new navigational clearance was attained in 2017 and project completion occurred in mid-2019.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
巴约讷大桥:抬高道路
纽约和新泽西港务局的巴约讷大桥横跨纽瓦克港和新泽西州伊丽莎白港的入口。这座桥是世界上最长的钢桁架拱桥,于1931年开放,由奥斯曼·阿曼(Othmar Ammann)设计。为了保持港口的经济活力,需要将原来的46米通航间隙提高到65.5米,以容纳通过新拓宽的巴拿马运河的大型集装箱船。预制混凝土分段施工采用了创新的分段施工方法,避免了长期的桥梁封闭,加快了施工进度。新的航行许可于2017年获得,项目于2019年年中完成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.00
自引率
10.00%
发文量
48
期刊最新文献
Hybrid machine learning model for prediction of vertical deflection of composite bridges A control chart to evaluate the control effect of a bridge under active control Design of stone masonry bridges in European treatises: Part 1 – The geometrical configuration Extreme fjord-crossings development in the E39 coastal highway route project – a review The replacement of the Kosciuszko Bridge
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1