Extreme fjord-crossings development in the E39 coastal highway route project – a review

X. Xiang
{"title":"Extreme fjord-crossings development in the E39 coastal highway route project – a review","authors":"X. Xiang","doi":"10.1680/jbren.22.00012","DOIUrl":null,"url":null,"abstract":"In this article an overview of the fjord-crossing bridge technologies development under the Norwegian Coastal Highway Route E39 Project is provided. Due to the extensive development and research scope, only a brief introduction of the concepts’ development is provided. This includes the different novel marine bridges developed by NPRA in the recent years, in addition to analysis and model test activities accompanying the design process.","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"68 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2023-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jbren.22.00012","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 2

Abstract

In this article an overview of the fjord-crossing bridge technologies development under the Norwegian Coastal Highway Route E39 Project is provided. Due to the extensive development and research scope, only a brief introduction of the concepts’ development is provided. This includes the different novel marine bridges developed by NPRA in the recent years, in addition to analysis and model test activities accompanying the design process.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
E39沿海高速公路路线项目中极端峡湾渡口的开发——综述
本文概述了挪威沿海公路E39号线项目下跨峡湾桥梁技术的发展。由于其广泛的发展和研究范围,本文仅对这些概念的发展进行简要介绍。这包括NPRA近年来开发的不同新型海洋桥梁,以及伴随设计过程的分析和模型测试活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
3.00
自引率
10.00%
发文量
48
期刊最新文献
Hybrid machine learning model for prediction of vertical deflection of composite bridges A control chart to evaluate the control effect of a bridge under active control Design of stone masonry bridges in European treatises: Part 1 – The geometrical configuration Extreme fjord-crossings development in the E39 coastal highway route project – a review The replacement of the Kosciuszko Bridge
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1