Research of Formation Protection Technology in Complex Fault Block Oilfield

Fan Songlin, Xiaofang Wang, Jun Dong, Qiuyan You, Xiaochun Yang, Junfeng Zhao
{"title":"Research of Formation Protection Technology in Complex Fault Block Oilfield","authors":"Fan Songlin, Xiaofang Wang, Jun Dong, Qiuyan You, Xiaochun Yang, Junfeng Zhao","doi":"10.2523/IPTC-19510-MS","DOIUrl":null,"url":null,"abstract":"\n Dagang Oilfield is a part of oil-gas reservoir with various reservoir types, broken fault block, high heterogeneity and complex geological situations. For example, in low pressure and high permeability reservoirs, permeability is higher than 2000 mD and pressure coefficient is less than 0.5. The salinity of formation water in low permeability reservoir is as high as 30000 mg/L, and the pour point of crude oil is as high as 40 °C. The statistics show that the average recovery time of the well yield after remedial work is over 7 days, and the average recovery rate of the well yield is less than 87% in Dagang Oilfield, which have an influence on the stable production and the benefit development of the oilfield. The problem above has not been effectively resolved for a long time because of the factors of technology and cost. In this paper, a series of low cost formation protection technology were developed. First, the low-cost nitrogen microbubble temporary blocking technology, which can block 2 mm aperture, was developed by improving preparation technology of nitrogen microbubble working fluid and adding degradable temporary blocking material. Second, the formation protection for complex low-permeability reservoirs was developed by enhancing the temperature of workover fluid and adding the high efficiency surfactants. The results show that the temperature of workover fluid increases by 20-50 °C. Finally, the low-cost workover operation technology with formation protection was developed. The cost can be reduced more than 50% while protecting the formation. So far, the all technologies were successfully applied in 2135 wells. After the application of technology, the average recovery time of the well yield is 3.5 days, the average recovery rate of the well yield is 96%, and the total production loss is 15.7 ° 104t. The problem of the formation pollution during the workover has been effectively resolved, which provides technical support for the production stability of complex fault block oilfield.","PeriodicalId":11267,"journal":{"name":"Day 3 Thu, March 28, 2019","volume":"96 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 28, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/IPTC-19510-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Dagang Oilfield is a part of oil-gas reservoir with various reservoir types, broken fault block, high heterogeneity and complex geological situations. For example, in low pressure and high permeability reservoirs, permeability is higher than 2000 mD and pressure coefficient is less than 0.5. The salinity of formation water in low permeability reservoir is as high as 30000 mg/L, and the pour point of crude oil is as high as 40 °C. The statistics show that the average recovery time of the well yield after remedial work is over 7 days, and the average recovery rate of the well yield is less than 87% in Dagang Oilfield, which have an influence on the stable production and the benefit development of the oilfield. The problem above has not been effectively resolved for a long time because of the factors of technology and cost. In this paper, a series of low cost formation protection technology were developed. First, the low-cost nitrogen microbubble temporary blocking technology, which can block 2 mm aperture, was developed by improving preparation technology of nitrogen microbubble working fluid and adding degradable temporary blocking material. Second, the formation protection for complex low-permeability reservoirs was developed by enhancing the temperature of workover fluid and adding the high efficiency surfactants. The results show that the temperature of workover fluid increases by 20-50 °C. Finally, the low-cost workover operation technology with formation protection was developed. The cost can be reduced more than 50% while protecting the formation. So far, the all technologies were successfully applied in 2135 wells. After the application of technology, the average recovery time of the well yield is 3.5 days, the average recovery rate of the well yield is 96%, and the total production loss is 15.7 ° 104t. The problem of the formation pollution during the workover has been effectively resolved, which provides technical support for the production stability of complex fault block oilfield.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
复杂断块油田地层保护技术研究
大港油田属于储层类型多、断块破碎、非均质性高、地质情况复杂的油气储层。例如,在低压高渗油藏中,渗透率大于2000 mD,压力系数小于0.5。低渗透油藏地层水矿化度高达30000 mg/L,原油倾点高达40℃。统计表明,大港油田修复后的井产平均恢复时间在7天以上,井产平均采收率低于87%,影响了油田的稳定生产和效益开发。由于技术和成本等因素,上述问题长期未能得到有效解决。本文开发了一系列低成本的地层保护技术。首先,通过改进氮微泡工质制备工艺,加入可降解暂堵材料,开发出可封堵2mm孔径的低成本氮微泡暂堵技术。其次,通过提高修井液温度和添加高效表面活性剂,对复杂低渗透油藏进行地层保护。结果表明,修井液温度升高20 ~ 50℃。最后,开发了具有地层保护的低成本修井作业技术。在保护地层的同时,成本可降低50%以上。到目前为止,所有技术已成功应用于2135口井。应用该技术后,井产平均恢复时间为3.5天,井产平均采收率为96%,总产量损失为15.7°104t。有效解决了修井过程中地层污染问题,为复杂断块油田的稳定生产提供了技术支持。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
New Modified Plane of Weakness Method Enables Drilling Horizontal Wells Successfully in Ordos Basin, China A Practical Method to Match Trajectories of a Horizontal Well in Time Domain and in Depth in Ancient Buried Hill 3D Permeability Characterization Based on Pore Structure Analysis and Multi-Parameters Seismic Inversion and Its Application in H Oilfield Research and Application on Intensive Drilling Model of Large Platforms Disclose Hidden Hydrocarbon HC Reserves from Additional Zone of Interest AZIs Using dT LogR Method in Lunar Field, Gulf of Thailand
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1