Production Throughput Improvement for Plant Streamline N

Weihua Gan, P. Che, Jin-ning You
{"title":"Production Throughput Improvement for Plant Streamline N","authors":"Weihua Gan, P. Che, Jin-ning You","doi":"10.2991/978-94-6239-100-0_33","DOIUrl":null,"url":null,"abstract":"The objective of this research is to improve the throughput of the plant streamline N based on the methods of industrial engineering, e.g. job analysis, fishbone diagram and work study, for increased productivity. In this case study, bottlenecks diagnose and continuous productivity improvement is studied. The new production system has been designed and compared with the present throughput. The results show that new throughput of plant streamline N significantly increases from 140 to 202 per day.","PeriodicalId":16379,"journal":{"name":"Journal of Nanchang Hangkong University","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2014-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Nanchang Hangkong University","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/978-94-6239-100-0_33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The objective of this research is to improve the throughput of the plant streamline N based on the methods of industrial engineering, e.g. job analysis, fishbone diagram and work study, for increased productivity. In this case study, bottlenecks diagnose and continuous productivity improvement is studied. The new production system has been designed and compared with the present throughput. The results show that new throughput of plant streamline N significantly increases from 140 to 202 per day.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
工厂流线生产能力的改进
本研究的目的是基于工业工程的方法,如工作分析、鱼骨图和工作研究,提高工厂流线N的吞吐量,以提高生产率。在这个案例研究中,研究了瓶颈诊断和持续的生产力改进。设计了新的生产系统,并与现有的产量进行了比较。结果表明,植物流线氮的新吞吐量从每天140个显著增加到每天202个。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Production Throughput Improvement for Plant Streamline N
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1