{"title":"Tekep Isolator Gardu Untuk Menanggulangi Gangguan Binatang Tupai","authors":"Ida Bagus Prabha Girindra, Politeknik Negeri Bali, Wayan Jondra, I. W. Teresna","doi":"10.31940/matrix.v10i2.1892","DOIUrl":null,"url":null,"abstract":": Reliability is the key to minimize SAIDI and SAIFI. The remote power station generated electrical energy, and distributed to customers trought the transmision and distribution system. So many disturbance in the distribution electrical energy process. PT. PLN ULP Kuta was noted 107 animal disturbances in 2018. Ground fault disturbance interrupted the GFR and the impact is distribution systems black out. Tekep Isolator is the trade mark of cover insulator for subdistribution station protection agains animal disturbance, that are made in PT. Adi Putra. This study is quantitative research. This study was to determine the ground fault current, after the substation insulator cover installation and to minimize the ground fault relay (GFR) interuption. The findings of this study are (1) The value of one phase ground fault by to squirrels after the installation of the insulator cover, type YS-FCO-AP on the fuse cut out while dry and wet squirrel body conditions, namely: 46.14206371 micro amperes and 46.14208458 micro amperes. The value of one phase ground fault by to squirrels after the installation insulator cover type: YS-BUS-ARR-AP on the transformer bushing and arrester while squirrels are dry and wet is: 16.83937183 micro amperes and 16.83937461 micro amperes; (2) When one phase ground fault at fuse cut out, transformer bushing and arrester by squirrels did not cause the distribution black out, because the one phase ground fault current did not over than GFR setting, that is 30 amperes.","PeriodicalId":31964,"journal":{"name":"Matrix Jurnal Manajemen Teknologi dan Informatika","volume":"27 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Matrix Jurnal Manajemen Teknologi dan Informatika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31940/matrix.v10i2.1892","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

: Reliability is the key to minimize SAIDI and SAIFI. The remote power station generated electrical energy, and distributed to customers trought the transmision and distribution system. So many disturbance in the distribution electrical energy process. PT. PLN ULP Kuta was noted 107 animal disturbances in 2018. Ground fault disturbance interrupted the GFR and the impact is distribution systems black out. Tekep Isolator is the trade mark of cover insulator for subdistribution station protection agains animal disturbance, that are made in PT. Adi Putra. This study is quantitative research. This study was to determine the ground fault current, after the substation insulator cover installation and to minimize the ground fault relay (GFR) interuption. The findings of this study are (1) The value of one phase ground fault by to squirrels after the installation of the insulator cover, type YS-FCO-AP on the fuse cut out while dry and wet squirrel body conditions, namely: 46.14206371 micro amperes and 46.14208458 micro amperes. The value of one phase ground fault by to squirrels after the installation insulator cover type: YS-BUS-ARR-AP on the transformer bushing and arrester while squirrels are dry and wet is: 16.83937183 micro amperes and 16.83937461 micro amperes; (2) When one phase ground fault at fuse cut out, transformer bushing and arrester by squirrels did not cause the distribution black out, because the one phase ground fault current did not over than GFR setting, that is 30 amperes.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
灭虫器,对付松鼠入侵
可靠性是减少SAIDI和SAIFI的关键。远程电站产生电能,并通过输配电系统分配给用户。配电过程中存在诸多干扰。PT. PLN ULP库塔在2018年发生了107起动物骚乱。接地故障干扰中断了GFR,影响的是配电系统的停电。Tekep Isolator是分配站防护动物干扰用覆盖绝缘子的商标,由PT. Adi Putra制造。这项研究是定量研究。本研究旨在确定变电站绝缘子罩安装后的接地故障电流,并尽量减少接地故障继电器(GFR)的中断。本研究发现:(1)一相接地故障值由安装绝缘子盖后,YS-FCO-AP型保险丝切断时松鼠体干、湿两种情况下分别为:46.14206371微安和46.14208458微安。在松鼠干、湿状态下,在变压器套管和避雷器上安装YS-BUS-ARR-AP型绝缘子罩后,松鼠的单相接地故障值分别为:16.83937183微安和16.83937461微安;(2)在熔断器切断时,变压器套管和避雷器发生单相接地故障时,由于单相接地故障电流未超过GFR整定值,即30安培,故未造成配电停电。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
13
审稿时长
24 weeks
期刊最新文献
Optimizing transaction data performance in database management systems Library apps to improve the digitization of Sekolah Penggerak Program Literature review: visible light communication system business model scheme for telecommunication business in Indonesia Determination of the best rule-based analysis results from the comparison of the Fp-Growth, Apriori, and TPQ-Apriori Algorithms for recommendation systems The empirical study of Joomla CMS map extension and location performance
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1