Gray relational analysis between the maglev-structural deformation and construction parameters of the shield tunnel crossing the shanghai maglev protected area

Guo-Qiang Wang, Song-Tao Hu, Guofeng Zeng, F. Ye, Wenhong Zu
{"title":"Gray relational analysis between the maglev-structural deformation and construction parameters of the shield tunnel crossing the shanghai maglev protected area","authors":"Guo-Qiang Wang, Song-Tao Hu, Guofeng Zeng, F. Ye, Wenhong Zu","doi":"10.17816/TRANSSYST201844146-156","DOIUrl":null,"url":null,"abstract":"Background: Shanghai Maglev Demonstration Line is the only commercial high-speed maglev train line in the world, which has multiple functions such as transportation, exhibition, tourism and sightseeing. Besides, Shanghai Maglev Demonstration Line has been in operation for 15 years, and has been operating safely and punctually. Maglev protected area are located within 30 meters of the left and right sides of the Shanghai Maglev Demonstration Line and unrelated persons are not allowed to enter the area. When there were external construction invading the protected area, it is neccessary to do the comprehensive technical monitoring and protection. Without similar project to refer to, Metro Line 13 traversing Shanghai Maglev Line was a big challenge. Therefore, effective measures should be taken to do the comprehensive technical monitoring. Finding the relation between the maglev deformation and shield construction parameters was an important part of the monitoring. \nAim: This thesis aimed at finding the relation between the maglev deformation and shield construction parameters and controlling the maglev deformation in the crossing of Metro Line 13, thus guiding the shield construction. \nMethods: This thesis calculated the gray relation between the maglev deformation and shield construction parameters from the cause of deformation of the maglev by the gray relation analysis. \nResults: The construction parameters optimization and the sensitivity control are carried out. Meanwhile, combined with the measured results of deformation monitoring, the multi means parallel monitoring data are analyzed synthetically and the data are checked, and the construction parameters are adjusted reasonably to make the pier column deformation in the controllable permissible range, having ensured the safe operation of the maglev. \nConclusion: The calculation results has provided a reference for realizing active control on the influence of shield construction on the maglev and has remedied the defect that could only use deformation monitoring but could not control the deformation actively in the past work. The gray relational analysis has a certain effect on controlling the influence of shield construction on surrounding structures and has certain reference significance for subsequent similar projects.","PeriodicalId":100849,"journal":{"name":"Journal of Transportation Systems Engineering and Information Technology","volume":"82 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Transportation Systems Engineering and Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17816/TRANSSYST201844146-156","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Background: Shanghai Maglev Demonstration Line is the only commercial high-speed maglev train line in the world, which has multiple functions such as transportation, exhibition, tourism and sightseeing. Besides, Shanghai Maglev Demonstration Line has been in operation for 15 years, and has been operating safely and punctually. Maglev protected area are located within 30 meters of the left and right sides of the Shanghai Maglev Demonstration Line and unrelated persons are not allowed to enter the area. When there were external construction invading the protected area, it is neccessary to do the comprehensive technical monitoring and protection. Without similar project to refer to, Metro Line 13 traversing Shanghai Maglev Line was a big challenge. Therefore, effective measures should be taken to do the comprehensive technical monitoring. Finding the relation between the maglev deformation and shield construction parameters was an important part of the monitoring. Aim: This thesis aimed at finding the relation between the maglev deformation and shield construction parameters and controlling the maglev deformation in the crossing of Metro Line 13, thus guiding the shield construction. Methods: This thesis calculated the gray relation between the maglev deformation and shield construction parameters from the cause of deformation of the maglev by the gray relation analysis. Results: The construction parameters optimization and the sensitivity control are carried out. Meanwhile, combined with the measured results of deformation monitoring, the multi means parallel monitoring data are analyzed synthetically and the data are checked, and the construction parameters are adjusted reasonably to make the pier column deformation in the controllable permissible range, having ensured the safe operation of the maglev. Conclusion: The calculation results has provided a reference for realizing active control on the influence of shield construction on the maglev and has remedied the defect that could only use deformation monitoring but could not control the deformation actively in the past work. The gray relational analysis has a certain effect on controlling the influence of shield construction on surrounding structures and has certain reference significance for subsequent similar projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
横贯上海磁悬浮保护区盾构隧道磁结构变形与施工参数的灰色关联分析
背景:上海磁悬浮示范线是世界上唯一一条商用高速磁悬浮列车线路,集交通、展览、旅游、观光等多种功能于一体。此外,上海磁悬浮示范线已经运行了15年,一直安全、准时地运行。磁浮保护区位于上海磁浮示范线左右两侧30米范围内,非相关人员不得进入。当有外部建筑侵入保护区时,有必要做好全面的技术监测和防护。没有类似的项目可参考,地铁13号线穿越上海磁悬浮线是一个巨大的挑战。因此,应采取有效措施,做好全面的技术监测。寻找磁悬浮变形与盾构施工参数之间的关系是监测的重要组成部分。目的:本文旨在找出地铁13号线交叉口磁悬浮变形与盾构施工参数之间的关系,控制地铁13号线交叉口的磁悬浮变形,从而指导盾构施工。方法:从磁浮变形的原因出发,运用灰色关联分析法,计算出磁浮变形与盾构施工参数之间的灰色关系。结果:进行了施工参数优化和灵敏度控制。同时,结合变形监测的实测结果,对多手段并行监测数据进行综合分析和校核,合理调整施工参数,使桥墩柱变形处于可控的允许范围内,保证了磁悬浮列车的安全运行。结论:计算结果为实现屏蔽施工对磁悬浮列车影响的主动控制提供了参考,弥补了以往工作中只能利用变形监测而不能主动控制变形的缺陷。灰色关联分析对控制盾构施工对周围结构的影响有一定的效果,对后续类似工程具有一定的参考意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Impact of Roundabout Metering on the Operational Performance of Roundabout: A Case Study of Jawalakhel, Nepal Optimizing Performance at Signalized Intersections through Signal Coordination in Two Intersections of Nepal A Review on the Development and Need of Bicycle Level of Service A Feasibility Study of Public Transport of Panna City Madhya Pradesh A Review on Problems Faced Due to Poor Transportation Facilities in Small Urban Cities in India
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1