Improving the efficiency of relay protection at a mining and processing plant

IF 2.4 Q2 MINING & MINERAL PROCESSING Journal of Mining Institute Pub Date : 2021-05-25 DOI:10.31897/pmi.2021.2.14
R. Klyuev, I. Bosikov, O. Gavrina
{"title":"Improving the efficiency of relay protection at a mining and processing plant","authors":"R. Klyuev, I. Bosikov, O. Gavrina","doi":"10.31897/pmi.2021.2.14","DOIUrl":null,"url":null,"abstract":"The paper presents the results of constructing effective relay protection in the power supply system of a mining and processing plant (MPP). A brief description of the MPP is given, the power supply and substitution circuits used to calculate the short-circuit currents are given. A statistical analysis of failures in the electric network of the MPP has been carried out, which makes it possible to draw conclusions about the nature of failures ranges. Analysis of the registered faults shows that a significant part of them are line-to-earth faults, which in most cases turn into multiphase short circuits, which are interrupted by overcurrent protection. In order to improve the efficiency and reliability of the relay protection, the power supply scheme of the MPP was refined and analyzed. The calculation of the short-circuit currents was made, which made it possible to calculate the settings of the relay protection and give recommendations on the place of its installation and adjustment in order to ensure the normal operation of electricity consumers. To reduce the number of failures to the cable insert on the line leaving the administrative and household complex (AHC), and to increase the reliability of power supply to consumers, it is advisable to divide the capacities of the existing 10 kV line into two parallel ones by laying a second line. It is recommended to install a current cut-off on the line outgoing to the AHC, the feasibility of the installation of which was shown by calculations. This will reduce the chance of failures to the cable gland. Data on the setting currents of overcurrent protection and current cut-off are given on the selectivity card. \n  \n ","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":null,"pages":null},"PeriodicalIF":2.4000,"publicationDate":"2021-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mining Institute","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31897/pmi.2021.2.14","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 2

Abstract

The paper presents the results of constructing effective relay protection in the power supply system of a mining and processing plant (MPP). A brief description of the MPP is given, the power supply and substitution circuits used to calculate the short-circuit currents are given. A statistical analysis of failures in the electric network of the MPP has been carried out, which makes it possible to draw conclusions about the nature of failures ranges. Analysis of the registered faults shows that a significant part of them are line-to-earth faults, which in most cases turn into multiphase short circuits, which are interrupted by overcurrent protection. In order to improve the efficiency and reliability of the relay protection, the power supply scheme of the MPP was refined and analyzed. The calculation of the short-circuit currents was made, which made it possible to calculate the settings of the relay protection and give recommendations on the place of its installation and adjustment in order to ensure the normal operation of electricity consumers. To reduce the number of failures to the cable insert on the line leaving the administrative and household complex (AHC), and to increase the reliability of power supply to consumers, it is advisable to divide the capacities of the existing 10 kV line into two parallel ones by laying a second line. It is recommended to install a current cut-off on the line outgoing to the AHC, the feasibility of the installation of which was shown by calculations. This will reduce the chance of failures to the cable gland. Data on the setting currents of overcurrent protection and current cut-off are given on the selectivity card.    
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
提高矿山和加工厂继电保护的效率
本文介绍了在某矿山选矿厂供电系统中构建有效继电保护的效果。简要介绍了MPP,给出了计算短路电流的电源和替代电路。对MPP电网的故障进行了统计分析,从而得出故障范围的性质。对已登记故障的分析表明,其中相当一部分是线路对地故障,这些故障大多转化为多相短路,并通过过流保护进行过断。为了提高继电保护的效率和可靠性,对MPP的供电方案进行了改进和分析。对短路电流进行了计算,从而可以计算出继电保护的整定值,并对继电保护的安装位置和调整提出建议,以保证电力用户的正常运行。为了减少离开行政和家庭综合体(AHC)的线路上插入的电缆的故障次数,并提高对消费者供电的可靠性,建议通过铺设第二条线路将现有10kv线路的容量分成两条并联线路。建议在输往AHC的线路上安装一个电流截止装置,计算表明了安装的可行性。这将减少电缆压盖故障的机会。过流保护和电流截止的设定电流数据在选择性卡上给出。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Mining Institute
Journal of Mining Institute MINING & MINERAL PROCESSING-
CiteScore
7.50
自引率
25.00%
发文量
62
审稿时长
8 weeks
期刊最新文献
Laboratory, numerical and field assessment of the effectiveness of cyclic geomechanical treatment on a tournaisian carbonate reservoir Determination of the grid impedance in power consumption modes with harmonics Sorption purification of acid storage facility water from iron and titanium on organic polymeric materials Wodginite as an indicator mineral of tantalum-bearing pegmatites and granites Оценка сдвиговой прочности горных пород по трещинам на основе результатов испытаний образцов сферическими инденторами
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1