Bi-objective optimization of identical parallel machine scheduling with flexible maintenance and job release times

IF 1.6 3区 工程技术 Q4 ENGINEERING, INDUSTRIAL International Journal of Industrial Engineering Computations Pub Date : 2022-01-01 DOI:10.5267/j.ijiec.2022.8.003
Yarong Chen, Z. Guan, Chen Wang, F. Chou, L. Yue
{"title":"Bi-objective optimization of identical parallel machine scheduling with flexible maintenance and job release times","authors":"Yarong Chen, Z. Guan, Chen Wang, F. Chou, L. Yue","doi":"10.5267/j.ijiec.2022.8.003","DOIUrl":null,"url":null,"abstract":"This paper investigates an identical parallel machine scheduling problem with flexible maintenance and job release times and attempts to optimize two objectives: the minimization of the makespan and total tardiness simultaneously. A mixed-integer programming (MIP) model for solving small-scale instances is presented first, and then a modified NSGA-Ⅱ (M-NSGA-Ⅱ) algorithm is constructed for solving medium- and large-scale instances by incorporating several strategies. These strategies include: (ⅰ) the proposal of a decoding method based on dynamic programming, (ⅱ) the design of dynamic probability crossover and mutation operators, and (ⅲ) the presentation of neighborhood search method. The parameters of the proposed algorithm are optimized by the Taguchi method. Three scales of problems, including 52 instances, are generated to compare the performance of different optimization methods. The computational results demonstrate that the M-NSGA-Ⅱ algorithm obviously outperforms the original NSGA-II algorithm when solving medium- and large-scale instances, although the time taken to solve the instances is slightly longer.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"6 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2022.8.003","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 2

Abstract

This paper investigates an identical parallel machine scheduling problem with flexible maintenance and job release times and attempts to optimize two objectives: the minimization of the makespan and total tardiness simultaneously. A mixed-integer programming (MIP) model for solving small-scale instances is presented first, and then a modified NSGA-Ⅱ (M-NSGA-Ⅱ) algorithm is constructed for solving medium- and large-scale instances by incorporating several strategies. These strategies include: (ⅰ) the proposal of a decoding method based on dynamic programming, (ⅱ) the design of dynamic probability crossover and mutation operators, and (ⅲ) the presentation of neighborhood search method. The parameters of the proposed algorithm are optimized by the Taguchi method. Three scales of problems, including 52 instances, are generated to compare the performance of different optimization methods. The computational results demonstrate that the M-NSGA-Ⅱ algorithm obviously outperforms the original NSGA-II algorithm when solving medium- and large-scale instances, although the time taken to solve the instances is slightly longer.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
具有灵活维护和作业释放时间的同一并行机器调度双目标优化
本文研究了一类具有灵活维护时间和作业释放时间的同一并行机器调度问题,并试图同时优化最大完工时间和总延迟时间两个目标。首先提出了求解小尺度实例的混合整数规划(MIP)模型,然后结合多种策略构造了求解中、大规模实例的改进NSGA-Ⅱ(M-NSGA-Ⅱ)算法。这些策略包括:(ⅰ)提出了一种基于动态规划的解码方法;(ⅱ)设计了动态概率交叉和变异算子;(ⅲ)提出了邻域搜索方法。采用田口法对算法参数进行了优化。生成了包含52个实例的三个问题尺度,以比较不同优化方法的性能。计算结果表明,M-NSGA-Ⅱ算法在求解大中型实例时明显优于原NSGA-II算法,尽管求解实例的时间稍长。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
5.70
自引率
9.10%
发文量
35
审稿时长
20 weeks
期刊最新文献
A unifying framework and a mathematical model for the Slab Stack Shuffling Problem Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints Minimizing operating expenditures for a manufacturing system featuring quality reassurances, probabilistic failures, overtime, and outsourcing Composite heuristics and water wave optimality algorithms for tri-criteria multiple job classes and customer order scheduling on a single machine Investigating the collective impact of postponement, scrap, and external suppliers on multiproduct replenishing decision
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1