Extension of Oil Well Economic Life by Simultaneous Production of Oil and Electricity

Kai Wang, Xingru Wu
{"title":"Extension of Oil Well Economic Life by Simultaneous Production of Oil and Electricity","authors":"Kai Wang, Xingru Wu","doi":"10.2118/195211-MS","DOIUrl":null,"url":null,"abstract":"\n Oil production decline and excessive water production are prevalent in mature fields and unconventional plays, which significantly impact the profitability of the wells and result in costly water treatment and disposal. To seek for a sustainable development of those wells, reducing the operation cost and extending their economic lives, this paper presents a method of synergistic production of hydrocarbon and electricity, which could harvest the unexploited geothermal energy from the produced water and transfer heat to electricity in the wellbore. Such method is cost-effective, since it does not require any surface power plant facility, and it is replicable in numerous wells including both vertical wells and horizontal wells. By simultaneous coproduction of oil and electricity, the value of existing assets could be fully developed, operation cost could be offset, and the economic life of the well could be extended.\n This recently proposed method incorporated thermoelectric power generation technology and oil production. In this method, electricity could be produced by thermoelectric generator (TEG) mounted outside of the tubing wall under temperature gradient created by produced fluid and injected fluids. The aim of this paper is to illustrate the economic practicability of oil-electricity coproduction by using thermoelectric technology in oil wells based on previously proposed design. We examined the technical data of high water-cut oil wells in North Dakota and collected required information with respect to performance thermoelectric power generations. Special emphasis was placed on the key parameters related to project economics, such as thermoelectric material, length of TEG and injection rate. Sensitive studies were carried out to characterize the impact of the key parameters on project profits. We showed that by simultaneously production of oil and electricity, $234,480 of additional value could be generated without interfering with oil production.\n The proposed method capitalizes on the unexploited value of produced water and generates additional benefits. This study could provide a workflow for oil and gas operators to evaluate an oil-electricity coproduction project and could act as a guidance to perform and commercialize such project to balance parts of the operation cost and extend the life of the existing assets.","PeriodicalId":11150,"journal":{"name":"Day 2 Wed, April 10, 2019","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, April 10, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/195211-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Oil production decline and excessive water production are prevalent in mature fields and unconventional plays, which significantly impact the profitability of the wells and result in costly water treatment and disposal. To seek for a sustainable development of those wells, reducing the operation cost and extending their economic lives, this paper presents a method of synergistic production of hydrocarbon and electricity, which could harvest the unexploited geothermal energy from the produced water and transfer heat to electricity in the wellbore. Such method is cost-effective, since it does not require any surface power plant facility, and it is replicable in numerous wells including both vertical wells and horizontal wells. By simultaneous coproduction of oil and electricity, the value of existing assets could be fully developed, operation cost could be offset, and the economic life of the well could be extended. This recently proposed method incorporated thermoelectric power generation technology and oil production. In this method, electricity could be produced by thermoelectric generator (TEG) mounted outside of the tubing wall under temperature gradient created by produced fluid and injected fluids. The aim of this paper is to illustrate the economic practicability of oil-electricity coproduction by using thermoelectric technology in oil wells based on previously proposed design. We examined the technical data of high water-cut oil wells in North Dakota and collected required information with respect to performance thermoelectric power generations. Special emphasis was placed on the key parameters related to project economics, such as thermoelectric material, length of TEG and injection rate. Sensitive studies were carried out to characterize the impact of the key parameters on project profits. We showed that by simultaneously production of oil and electricity, $234,480 of additional value could be generated without interfering with oil production. The proposed method capitalizes on the unexploited value of produced water and generates additional benefits. This study could provide a workflow for oil and gas operators to evaluate an oil-electricity coproduction project and could act as a guidance to perform and commercialize such project to balance parts of the operation cost and extend the life of the existing assets.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
油电并产延长油井经济寿命
成熟油田和非常规油田普遍存在产油量下降和产水过多的问题,这严重影响了油井的盈利能力,并导致了昂贵的水处理和处置费用。为寻求该类井的可持续发展,降低作业成本,延长其经济寿命,提出了油气电协同采出的方法,即利用采出水中未开发的地热能,在井筒内进行热电转换。这种方法具有成本效益,因为它不需要任何地面发电厂设施,并且可以在许多井中复制,包括直井和水平井。通过油电联产,可以充分开发现有资产的价值,抵消作业成本,延长油井的经济寿命。最近提出的方法结合了热电发电技术和石油生产。在这种方法中,可以通过安装在油管壁外的热电发生器(TEG)在采出流体和注入流体产生的温度梯度下发电。本文的目的是说明在先前提出的设计基础上,利用热电技术在油井中进行油电联产的经济可行性。我们研究了北达科他州高含水油井的技术数据,并收集了有关热电发电性能的必要信息。特别强调了与项目经济相关的关键参数,如热电材料、TEG长度和注入速度。进行了敏感的研究,以确定关键参数对项目利润的影响。我们表明,通过同时生产石油和电力,可以在不干扰石油生产的情况下产生234,480美元的附加价值。该方法充分利用了采出水的未开发价值,并产生了额外的效益。该研究可以为油气运营商评估油电联产项目提供一个工作流程,并可以作为该项目实施和商业化的指导,以平衡部分运营成本并延长现有资产的使用寿命。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Exploring the Capability of Temperature-Only Analysis for Zonal Flow Quantification Field Operations Strategy for Installing Beam Pumping Units at 660 Wells in Just six Months Application of Radial Jet Drilling Technique with Gyro System to Enhance Reservoir Potential in Mature Sand Stone Reservoir in Assam-Arakan Basin Candidate Selection to Execution: A Detailed Case Study A Case Study on Treating Oil Contaminants and Heavy Metal of Produced Water Through Phytoremediation Using Reed Bed Technology: A Success Story of 15 Years Operation of Heglig Oil Field of Sudan Prevent Fouling and Corrosion During Mill-Out Operations: Case Studies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1