Listen: Cost and Design

T. Yarrow
{"title":"Listen: Cost and Design","authors":"T. Yarrow","doi":"10.7591/cornell/9781501738494.003.0039","DOIUrl":null,"url":null,"abstract":"How is cost linked to design? Megan, Phil, and Rob wonder together.\n MEGAN:\n Often you’re in a hurry. You’ve got six days to do that work, so you’re getting your costs for your materials straightaway, and you’re like, “oh, that’s ridiculous, it’s not going to work!” [her voice rises in exasperation] and then you just go back to the drawing board before you go any further. Cost is part of your design straightaway. I mean, yes, we might have a quantity surveyor [QS] involved, but the QS is another abstract entity. So you sort of do your detailing up to a certain point, then you go to a QS, and then it comes back and they will say, “Well, it’s over budget.” We say, “Well, we’ve done our work.” Are we going to redo it? And then there’s an ambiguity there....","PeriodicalId":79772,"journal":{"name":"AIA journal. American Institute of Architects","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AIA journal. American Institute of Architects","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7591/cornell/9781501738494.003.0039","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

How is cost linked to design? Megan, Phil, and Rob wonder together. MEGAN: Often you’re in a hurry. You’ve got six days to do that work, so you’re getting your costs for your materials straightaway, and you’re like, “oh, that’s ridiculous, it’s not going to work!” [her voice rises in exasperation] and then you just go back to the drawing board before you go any further. Cost is part of your design straightaway. I mean, yes, we might have a quantity surveyor [QS] involved, but the QS is another abstract entity. So you sort of do your detailing up to a certain point, then you go to a QS, and then it comes back and they will say, “Well, it’s over budget.” We say, “Well, we’ve done our work.” Are we going to redo it? And then there’s an ambiguity there....
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
听:成本和设计
成本是如何与设计联系起来的?梅根、菲尔和罗布一起好奇。梅根:你经常很匆忙。你有六天的时间来完成这项工作,所以你马上就会得到你的材料成本,你会想,“哦,这太荒谬了,这行不通!”(她的声音因恼怒而提高)然后你就得回到绘图板上再走一步。成本是设计的一部分。我的意思是,是的,我们可能会有一个工料测量师,但QS是另一个抽象的实体。所以你在一定程度上做了你的细节,然后你去问一个问题,然后他们会说,“嗯,它超出预算了。”我们说,“好吧,我们已经完成了我们的工作。”我们要重做吗?这里有一个模糊的地方....
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Questions of Vocation Magic Moments At the Limits of the Contract Professionalism Part 2. LIVES
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1