ANALISA ALIRAN DAYA SISTEM 20KV PADA PROYEK TUJUH BUKIT POWER SYSTEM MENGGUNAKAN SOFTWARE ETAP 12.6

Iriandi Ilyas, B. Apriansyah, Edy Supriyadi, Abdul Multi
{"title":"ANALISA ALIRAN DAYA SISTEM 20KV PADA PROYEK TUJUH BUKIT POWER SYSTEM MENGGUNAKAN SOFTWARE ETAP 12.6","authors":"Iriandi Ilyas, B. Apriansyah, Edy Supriyadi, Abdul Multi","doi":"10.37277/stch.v32i3.1345","DOIUrl":null,"url":null,"abstract":"ABSTRACT \nPower flow analysis is important in planning in order to get a good electric power system. In planning the electrical system for the Tujuh Bukit Power System project with a 20kV system network located in Banyuwangi, East Java, a power flow simulation for a single line diagram will be carried out using the ETAP 12.6 software with the Newton Raphson method. The simulation results which consist of 22 buses show a voltage drop on the 0.4kV_ADR MCC Busbar2 bus and 0.4kV_50-MCC-01 Busbar2 bus. As a system improvement, the 0.4kV_ADR MCC Busbar2 bus will be installed with a 500 kVar capacitor bank to raise the voltage profile from 376.3 V to 385.56 V. While on the 0.4kV_50-MCC-01 Busbar2 bus, a 100 kVar capacitor bank is required to increase the voltage from 382.2 V to 384.16 V. After the repair, the power supplied to the system is 3589.6 kVA with a power factor of 90.5% lagging. As well as the reduction in the total value of system power losses from 58.1 kW + 242.2 kVar to 49.3 kW + 200.8 kVar. \n  \nKeywords: Power flow, Netwon Rapshon, Simulation, Software ETAP 12.6","PeriodicalId":31905,"journal":{"name":"Sainstek Jurnal Sains dan Teknologi","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sainstek Jurnal Sains dan Teknologi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37277/stch.v32i3.1345","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

ABSTRACT Power flow analysis is important in planning in order to get a good electric power system. In planning the electrical system for the Tujuh Bukit Power System project with a 20kV system network located in Banyuwangi, East Java, a power flow simulation for a single line diagram will be carried out using the ETAP 12.6 software with the Newton Raphson method. The simulation results which consist of 22 buses show a voltage drop on the 0.4kV_ADR MCC Busbar2 bus and 0.4kV_50-MCC-01 Busbar2 bus. As a system improvement, the 0.4kV_ADR MCC Busbar2 bus will be installed with a 500 kVar capacitor bank to raise the voltage profile from 376.3 V to 385.56 V. While on the 0.4kV_50-MCC-01 Busbar2 bus, a 100 kVar capacitor bank is required to increase the voltage from 382.2 V to 384.16 V. After the repair, the power supplied to the system is 3589.6 kVA with a power factor of 90.5% lagging. As well as the reduction in the total value of system power losses from 58.1 kW + 242.2 kVar to 49.3 kW + 200.8 kVar.   Keywords: Power flow, Netwon Rapshon, Simulation, Software ETAP 12.6
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
摘要:潮流分析在规划电力系统时具有重要的意义。在规划位于东爪哇Banyuwangi的20kV系统网络的Tujuh Bukit电力系统项目的电力系统时,将使用ETAP 12.6软件和Newton Raphson方法进行单线图的潮流模拟。由22根母线组成的仿真结果显示,0.4kV_ADR MCC Busbar2母线和0.4kV_50-MCC-01 Busbar2母线上存在电压降。作为系统改进,0.4kV_ADR MCC Busbar2总线将安装一个500 kVar电容器组,将电压分布从376.3 V提高到385.56 V。而在0.4kV_50-MCC-01 Busbar2总线上,需要一个100 kVar的电容器组来将电压从382.2 V增加到384.16 V。修复后系统供电3589.6 kVA,功率因数滞后90.5%。同时将系统总损耗从58.1 kW + 242.2 kVar降低到49.3 kW + 200.8 kVar。关键词:潮流,网络Rapshon,仿真,软件ETAP 12.6
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
8
审稿时长
8 weeks
期刊最新文献
Makna Modal Usaha Dan Budaya Pada Pengusaha Kerupuk Ikan Di Desa Klangonan Kabupaten Gresik Pengaruh Literasi Keuangan, Pendidikan dan Pendapatan Terhadap Perilaku Keuangan Usaha Mikro Kecil (UMK) di Kabupaten Gresik UPAYA RECOVERY KADAR SN DAN MINERAL CASSITERITE PADA TAILING BIJIH TIMAH MENGGUNAKAN PAN AMERICAN JIG Enhancing Conceptual Understanding and Concept Acquisition of Gravitational Force through Guided Inquiry Utilizing PhET Simulation TEKNOLOGI PLASMA DIELECTRIC BARRIER DISCHARGE DALAM MENGURANGI BOD, COD LIMBAH CAIR INDUSTRI KELAPA SAWIT
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1