Common cycle scheduling in a multistage production process

John I.S. Hsu, M. EI-Najdawi
{"title":"Common cycle scheduling in a multistage production process","authors":"John I.S. Hsu,&nbsp;M. EI-Najdawi","doi":"10.1016/0167-188X(90)90011-6","DOIUrl":null,"url":null,"abstract":"<div><p>The conventional approach to the common cycle problem assumes a single production stage and takes into account only the setup costs and the carrying costs of finished inventories. This approach is limited to a single stage production process because the carrying costs of in-process inventories which are inherent in any multistage production process are not included.</p><p>This paper presents a multiproduct, multistage common cycle model. It differs from the conventional common cycle model in that it includes hidden in-process inventory carrying costs. The optimal common cycle is determined to minimize the setup, in-process and finished inventories carrying costs for a predetermined production sequence. A numerical example is then presented to compare the cost savings in using the revised model with the use of the conventional model.</p><p>The revised model provides insights of in-process inventory measurement and improves the current management thought and practice in common cycle decision making for a multistage production process. The ideas and findings of this paper are of managerial significance. The users of the revised model will be able to correctly calculate the optimal common cycle which results in cost savings due to greatly reduced lot sizes. The smaller lot sizes affect investment in inventories, production lead times, product quality and many other related operations management issues.</p></div>","PeriodicalId":100476,"journal":{"name":"Engineering Costs and Production Economics","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1990-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-188X(90)90011-6","citationCount":"28","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Costs and Production Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167188X90900116","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 28

Abstract

The conventional approach to the common cycle problem assumes a single production stage and takes into account only the setup costs and the carrying costs of finished inventories. This approach is limited to a single stage production process because the carrying costs of in-process inventories which are inherent in any multistage production process are not included.

This paper presents a multiproduct, multistage common cycle model. It differs from the conventional common cycle model in that it includes hidden in-process inventory carrying costs. The optimal common cycle is determined to minimize the setup, in-process and finished inventories carrying costs for a predetermined production sequence. A numerical example is then presented to compare the cost savings in using the revised model with the use of the conventional model.

The revised model provides insights of in-process inventory measurement and improves the current management thought and practice in common cycle decision making for a multistage production process. The ideas and findings of this paper are of managerial significance. The users of the revised model will be able to correctly calculate the optimal common cycle which results in cost savings due to greatly reduced lot sizes. The smaller lot sizes affect investment in inventories, production lead times, product quality and many other related operations management issues.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
多阶段生产过程中常见的周期调度
解决共同周期问题的传统方法假设一个单一的生产阶段,并且只考虑建立成本和成品库存的持有成本。这种方法仅限于单阶段生产过程,因为不包括任何多阶段生产过程中固有的在制品库存的持有成本。提出了一个多产品、多阶段的共循环模型。它与传统的通用周期模型的不同之处在于它包含了隐藏的过程中库存持有成本。确定了最优公共周期,以最小化预先确定的生产顺序的设置,在制品和成品库存持有成本。通过数值算例比较了修正模型与传统模型的成本节约效果。修正后的模型提供了对在制品库存计量的见解,改进了当前多阶段生产过程共同周期决策的管理思想和实践。本文的观点和发现具有一定的管理意义。修正后的模型的用户将能够正确地计算出最佳的共同周期,由于大大减少了批量,从而节省了成本。较小的批量会影响库存投资、生产交货期、产品质量和许多其他相关的运营管理问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Author index Bicriterion jobshop scheduling with total flowtime and sum of squared lateness Investment justification in flexible manufacturing systems Using multiple time-series analysis, of assembly-line production of automobile engines — a case study Systematic machine-condition monitoring — a case study from Parenco paper mill in Holland
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1