Using multiple time-series analysis, of assembly-line production of automobile engines — a case study

Toni M. Somers, Yash P. Gupta
{"title":"Using multiple time-series analysis, of assembly-line production of automobile engines — a case study","authors":"Toni M. Somers,&nbsp;Yash P. Gupta","doi":"10.1016/0167-188X(91)90005-M","DOIUrl":null,"url":null,"abstract":"<div><p>In recent years researchers have dealt with multiple time series problems in practically meaningful ways. In this paper, the assembly-line data of a major producer of automobile engines is analyzed and multivariate models are constructed and estimated to investigate the relationship among weekly engine production, downtime and the man-hours worked. The assembly line is operated on a Just-In-Time basis for normally two shifts per five day week. Such an analysis could help them in developing contingency plans consistent with their obligations to the automobile manufacturer they supplied.</p></div>","PeriodicalId":100476,"journal":{"name":"Engineering Costs and Production Economics","volume":"21 3","pages":"Pages 243-258"},"PeriodicalIF":0.0000,"publicationDate":"1991-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-188X(91)90005-M","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Costs and Production Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167188X9190005M","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

In recent years researchers have dealt with multiple time series problems in practically meaningful ways. In this paper, the assembly-line data of a major producer of automobile engines is analyzed and multivariate models are constructed and estimated to investigate the relationship among weekly engine production, downtime and the man-hours worked. The assembly line is operated on a Just-In-Time basis for normally two shifts per five day week. Such an analysis could help them in developing contingency plans consistent with their obligations to the automobile manufacturer they supplied.

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
运用多时间序列分析,对汽车发动机装配线生产进行了案例分析
近年来,研究人员以具有实际意义的方法处理了多个时间序列问题。本文对某大型汽车发动机生产企业的装配线数据进行了分析,建立并估计了多变量模型,探讨了发动机周产量、停机时间和工时之间的关系。装配线在准时制的基础上运行,通常是每周五天两班倒。这种分析可以帮助他们制定符合其对所供应汽车制造商义务的应急计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Author index Bicriterion jobshop scheduling with total flowtime and sum of squared lateness Investment justification in flexible manufacturing systems Using multiple time-series analysis, of assembly-line production of automobile engines — a case study Systematic machine-condition monitoring — a case study from Parenco paper mill in Holland
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1