{"title":"Optimization Pressure of Water Distribution Network System of the Banjarsari Water Treatment Plant, PDAM Bojonegoro","authors":"Teguh Taruna Utama, Amelia Zumrotin","doi":"10.25077/aijaset.v2i1.31","DOIUrl":null,"url":null,"abstract":"The distribution network of the Banjarsari water treatment plant uses a gravity system. The system serves the drinking water in Banjarsari Villages. This study aims to optimize the pressure of the water distribution network in the Banjarsari Villages. This system supplies water from the Banjarsari water treatment plant. The water distribution network uses the gravity method to deliver water to customers. The drinking water distribution network was obtained from PDAM Bojonegoro. Meanwhile, the elevation and node of pipe were obtained by using Google Earth. Before optimization, the water distribution network has negative pressure at 07.00 AM and 05.00 PM. The negative pressure zone is at the end of the distribution network. The negative pressure values obtained using EPANET is range from -0,67 meters to -6,34 meters. The water distribution network is optimized by replacing diameter pipe in some areas, the water pressure increases significantly and makes the water distribution has positive pressure values. The pressure values are range from 2,70 meters to 13,65 meters. Replacing diameters of pipe is a solution to remove negative pressure, so that water from the reservoir can deliver to the end of a pipe. The distribution network pipe diameter is chosen which is close to the calculated pipe diameter.","PeriodicalId":7884,"journal":{"name":"Andalasian International Journal of Applied Science, Engineering and Technology","volume":"81 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Andalasian International Journal of Applied Science, Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25077/aijaset.v2i1.31","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The distribution network of the Banjarsari water treatment plant uses a gravity system. The system serves the drinking water in Banjarsari Villages. This study aims to optimize the pressure of the water distribution network in the Banjarsari Villages. This system supplies water from the Banjarsari water treatment plant. The water distribution network uses the gravity method to deliver water to customers. The drinking water distribution network was obtained from PDAM Bojonegoro. Meanwhile, the elevation and node of pipe were obtained by using Google Earth. Before optimization, the water distribution network has negative pressure at 07.00 AM and 05.00 PM. The negative pressure zone is at the end of the distribution network. The negative pressure values obtained using EPANET is range from -0,67 meters to -6,34 meters. The water distribution network is optimized by replacing diameter pipe in some areas, the water pressure increases significantly and makes the water distribution has positive pressure values. The pressure values are range from 2,70 meters to 13,65 meters. Replacing diameters of pipe is a solution to remove negative pressure, so that water from the reservoir can deliver to the end of a pipe. The distribution network pipe diameter is chosen which is close to the calculated pipe diameter.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Banjarsari水处理厂配水网络系统压力优化
Banjarsari水处理厂的分配网络使用重力系统。该系统为Banjarsari村庄提供饮用水。本研究旨在优化Banjarsari村庄的配水网络压力。这个系统从Banjarsari水处理厂供水。配水网络采用重力方式向用户供水。饮用水分配网络从PDAM Bojonegoro获得。同时利用Google Earth获取管道的高程和节点。优化前,配水网络在上午7点和下午5点处于负压状态。负压区位于配电网的末端。使用EPANET获得的负压值范围为- 0.67米至- 6.34米。优化配水网络,部分地区更换管径,水压明显增加,使配水出现正压力值。压力值范围从2,70米到13,65米。更换管道直径是消除负压的一种解决方案,这样储层中的水就可以输送到管道的末端。配电网管径选择与计算管径相近。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Determination of Resultant Forces for 2D Hyperstatic Frames using Android-Based Frame Design Application and Finite Element Analysis Enhancing Current Density and Specific Capacitance of Nata de Coco, TEMPO, and MXene Composites through Boiling Time Variations Integration of Photovoltaic Distributed Generation in Grid Distribution Network: A Literature Review Overcurrent and Directional Overcurrent Protection for Microgrid Study of Laccase Activity as a Biosensor for Peatland Degradation in Oil Palm Plantations in Pesisir Selatan of West Sumatra
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1