Aasta Hansteen Spar Inshore Pre-Service Operations

D. Edelson, Manoj Jegannathan, T. Harris, Basil Theckumpurath, Henning Selstad, Bjørn Krokeide, Morten Person
{"title":"Aasta Hansteen Spar Inshore Pre-Service Operations","authors":"D. Edelson, Manoj Jegannathan, T. Harris, Basil Theckumpurath, Henning Selstad, Bjørn Krokeide, Morten Person","doi":"10.4043/29539-MS","DOIUrl":null,"url":null,"abstract":"\n This paper presents the overview of the Pre-Service operations for the Aasta Hansteen field development. The paper also covers the execution challenges, supporting engineering and procedures followed for the various activities.\n The Aasta Hansteen Field development at a water depth of 1300m is the deepest field on the Norwegian Continental Shelf (NCS). The field is remotely located north of the Arctic Circle, in a particularly harsh environment 300km off the coast of Northern Norway, with 140km to the closest offshore installation.\n In the past, the pre-service marine operations for Spar platforms were completed at the offshore field locations. The Aasta Hansteen development presented the opportunity to complete the entire pre-service operations in the sheltered waters of the deep Norwegian fjords, making it a unique, first-of-a-kind inshore pre-service operations for a Spar platform ever executed. This advantage also helped to significantly reduce the cost and complexity of the pre-service operations effort for the project.\n There were several firsts in the industry for the Aasta Hansteen Spar platform, namely; Largest and heaviest Spar delivered, First Spar in Norwegian waters and subject to Norwegian rules, first full pre-service scope inshore in a fjord, first requirement for Structural Tank Inspection on a Spar Hull, first requirement for a Submergence Test, largest topside catamaran mating at 22,500 Te. Many of these firsts heavily influenced the planning and execution of the Pre-Service Operations for this project. The significance of these are also highlighted in this paper.","PeriodicalId":10948,"journal":{"name":"Day 2 Tue, May 07, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, May 07, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/29539-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper presents the overview of the Pre-Service operations for the Aasta Hansteen field development. The paper also covers the execution challenges, supporting engineering and procedures followed for the various activities. The Aasta Hansteen Field development at a water depth of 1300m is the deepest field on the Norwegian Continental Shelf (NCS). The field is remotely located north of the Arctic Circle, in a particularly harsh environment 300km off the coast of Northern Norway, with 140km to the closest offshore installation. In the past, the pre-service marine operations for Spar platforms were completed at the offshore field locations. The Aasta Hansteen development presented the opportunity to complete the entire pre-service operations in the sheltered waters of the deep Norwegian fjords, making it a unique, first-of-a-kind inshore pre-service operations for a Spar platform ever executed. This advantage also helped to significantly reduce the cost and complexity of the pre-service operations effort for the project. There were several firsts in the industry for the Aasta Hansteen Spar platform, namely; Largest and heaviest Spar delivered, First Spar in Norwegian waters and subject to Norwegian rules, first full pre-service scope inshore in a fjord, first requirement for Structural Tank Inspection on a Spar Hull, first requirement for a Submergence Test, largest topside catamaran mating at 22,500 Te. Many of these firsts heavily influenced the planning and execution of the Pre-Service Operations for this project. The significance of these are also highlighted in this paper.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Aasta Hansteen Spar近海服务前操作
本文概述了Aasta Hansteen油田开发的服务前操作。本文还涵盖了执行挑战、支持工程和各种活动所遵循的程序。Aasta Hansteen油田开发水深1300米,是挪威大陆架(NCS)上最深的油田。该油田位于北极圈以北的偏远地区,环境特别恶劣,距离挪威北部海岸300公里,距离最近的海上设施140公里。过去,Spar平台的服务前海上作业都是在海上油田完成的。Aasta Hansteen的开发提供了在挪威深峡湾的庇护水域完成整个服务前作业的机会,使其成为Spar平台有史以来独一无二的海上服务前作业。这一优势还有助于显著降低项目服务前操作的成本和复杂性。Aasta Hansteen Spar平台在业内有几个第一,即;交付最大和最重的Spar,挪威水域的第一艘Spar,符合挪威规则,第一个完整的海湾近海服役前范围,第一个要求对Spar船体进行结构储罐检查,第一个要求进行潜水测试,最大的上层双体船在22500海里配合。其中许多第一次严重影响了该项目服务前操作的计划和执行。本文还强调了这些研究的意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Implementing the New INCOSE Systems Engineering Competency Framework Using an Evidence Based Approach for Oil and Gas Companies A Machine Learning Application for Field Planning Optimization of Well Start-Up Using Integrated Well and Electrical Submersible Pump Modeling The Subsea Sand Management Challenge – What to Do with the Sand? Systems Engineering Principles to Enable Supplier-Led Solutions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1