{"title":"Rectification of Ground Water Leakage During Metro Tunnel Operation","authors":"Wen-Jen Chang, C. H. Chan, H. M. Shang","doi":"10.1680/jfoen.21.00017","DOIUrl":null,"url":null,"abstract":"It has been more than 20 years since the Metro Danshui Line of Taipei City was put into commercial operation and, the tunnels and underground metro stations experience structural aging along with p...","PeriodicalId":42902,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Forensic Engineering","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2021-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Forensic Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jfoen.21.00017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0
Abstract
It has been more than 20 years since the Metro Danshui Line of Taipei City was put into commercial operation and, the tunnels and underground metro stations experience structural aging along with p...