FRICTION TEST AND PARAMETER ANALYSIS OF PRESTRESSED CONCRETE CONTINUOUS BEAM BRIDGE

Qingxin Yu, Quansheng Sun, Junyun Liu
{"title":"FRICTION TEST AND PARAMETER ANALYSIS OF PRESTRESSED CONCRETE CONTINUOUS BEAM BRIDGE","authors":"Qingxin Yu, Quansheng Sun, Junyun Liu","doi":"10.14311/cej.2023.01.0005","DOIUrl":null,"url":null,"abstract":"The prestressed ducts of prestressed concrete continuous girder bridges are usually three-dimensionally distributed and long in length. The control of prestress loss during construction is very important. In order to ensure the effect of prestress tensioning, the test and analysis of friction parameters of prestressed ducts are particularly important. Based on the tension process of a prestressed concrete continuous beam bridge, the initial tension stress, loading time and channel friction parameters of the prestressed concrete continuous beam bridge are tested by field tests. Combined with the measured friction parameters, the finite element software Midas / Civil is used to analyse the influence of friction parameters on the mechanical properties of prestressed concrete continuous beam bridge. The results show that when the prestressed steel with bending angle not more than 40° and length not more than 70 m is stretched, the initial tension stress is suggested to be set as 20 % of the tension control force and the loading time is 5 min. The measured tunnel friction parameters are larger than the standard value, and the tension control force should be adjusted during the formal tension construction;The deflection of the key section of the main beam increases with the increase of the friction parameters, and the roof stress decreases with the increase of the friction parameters. The change of channel deviation coefficient has a greater impact on the deflection and roof stress than the change of friction coefficient.","PeriodicalId":21974,"journal":{"name":"Stavební obzor - Civil Engineering Journal","volume":"26 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Stavební obzor - Civil Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14311/cej.2023.01.0005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The prestressed ducts of prestressed concrete continuous girder bridges are usually three-dimensionally distributed and long in length. The control of prestress loss during construction is very important. In order to ensure the effect of prestress tensioning, the test and analysis of friction parameters of prestressed ducts are particularly important. Based on the tension process of a prestressed concrete continuous beam bridge, the initial tension stress, loading time and channel friction parameters of the prestressed concrete continuous beam bridge are tested by field tests. Combined with the measured friction parameters, the finite element software Midas / Civil is used to analyse the influence of friction parameters on the mechanical properties of prestressed concrete continuous beam bridge. The results show that when the prestressed steel with bending angle not more than 40° and length not more than 70 m is stretched, the initial tension stress is suggested to be set as 20 % of the tension control force and the loading time is 5 min. The measured tunnel friction parameters are larger than the standard value, and the tension control force should be adjusted during the formal tension construction;The deflection of the key section of the main beam increases with the increase of the friction parameters, and the roof stress decreases with the increase of the friction parameters. The change of channel deviation coefficient has a greater impact on the deflection and roof stress than the change of friction coefficient.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
预应力混凝土连续梁桥摩擦试验及参数分析
预应力混凝土连续梁桥的预应力管道通常呈三维分布,且长度较长。施工过程中预应力损失的控制十分重要。为了保证预应力张拉效果,对预应力管道的摩擦参数进行测试和分析显得尤为重要。基于某预应力混凝土连续梁桥的张拉过程,通过现场试验对预应力混凝土连续梁桥的初始张拉应力、加载时间和通道摩擦参数进行了测试。结合实测摩擦参数,利用有限元软件Midas / Civil分析了摩擦参数对预应力混凝土连续梁桥力学性能的影响。结果表明:当弯曲角度不大于40°、长度不大于70 m的预应力钢进行拉伸时,建议将初始拉应力设为张力控制力的20%,加载时间为5 min。实测隧道摩擦参数大于标准值;形式张拉施工时应调整张拉控制力;主梁关键截面挠度随摩擦参数的增大而增大,顶板应力随摩擦参数的增大而减小。沟道偏差系数的变化对挠度和顶板应力的影响大于摩擦系数的变化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Experimental study on real bridge before and after simple-supporting to continuous reinforced concrete hollow slab STRESS AND DEFORMATION ANALYSIS OF A U-SHAPED THIN AQUEDUCT BASED ON SHELL ELEMENT Study on the reasonable RSR of arch and its influencing factors in PBA method Design of Autonomous Position and Secondary Estimation of Atmospheric Parameters Sensor Using Low-cost GNSS STUDY ON EARTHQUAKE DESTRUCTION MODE OF THE LARGEST CANAL CROSSING HIGHWAY BRIDGE BASED ON IEM BOUNDARY IN SOUTH-TO-NORTH WATER DIVERSION
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1