{"title":"Delay Study in the Construction Project: An Overview","authors":"Shubham Sharma, M. Pandey, S. Agrawal","doi":"10.9790/9622-0707012123","DOIUrl":null,"url":null,"abstract":"Scheduling” is the word when it came in our mind it means the time table and most important thing is that, works should be done in time, but even if we try everything to keep our time table in schedule some of the factors that cause us late by increasing our time, they are called “DELAY FACTOR” and the time increase by them, known as “DELAY”. DELAY is the factor which is responsible for every other factors which cause lose of time, money etc. especially the most prominent loss of time and money causes by delay factors is in construction. Today construction growth in the world is increasing day by day. In every part of the world an ongoing construction can be seen, so it is very important to keep every construction on time, but quite often it is not possible because many sub-factors from different main factors cause delay and keep the construction behind the time in comparison of schedule time. The main focus of this paper is to determine the current and most responsible Delay factors by methods of MCDM and by arranging and listing them, with the recommendation to minimizing them.","PeriodicalId":13972,"journal":{"name":"International Journal of Engineering Research and Applications","volume":"47 1","pages":"21-23"},"PeriodicalIF":0.0000,"publicationDate":"2017-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Research and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9790/9622-0707012123","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Scheduling” is the word when it came in our mind it means the time table and most important thing is that, works should be done in time, but even if we try everything to keep our time table in schedule some of the factors that cause us late by increasing our time, they are called “DELAY FACTOR” and the time increase by them, known as “DELAY”. DELAY is the factor which is responsible for every other factors which cause lose of time, money etc. especially the most prominent loss of time and money causes by delay factors is in construction. Today construction growth in the world is increasing day by day. In every part of the world an ongoing construction can be seen, so it is very important to keep every construction on time, but quite often it is not possible because many sub-factors from different main factors cause delay and keep the construction behind the time in comparison of schedule time. The main focus of this paper is to determine the current and most responsible Delay factors by methods of MCDM and by arranging and listing them, with the recommendation to minimizing them.