{"title":"Empirical regularities investigation of rock mass discharge by explosion on the free surface of a pit bench","authors":"I. Alenichev, R. Rakhmanov","doi":"10.31897/pmi.2021.3.2","DOIUrl":null,"url":null,"abstract":"Minimizing the discharge of blasted rock mass into the developed space of the pit is a very relevant area for study, as it allows to increase the processability of work and reduce the cost of mining. The article presents the results of experimental industrial explosions, during which the study of this issue was conducted. The main purpose of the work was to establish the key factors affecting the volume of rock mass discharge to the pit haulage berm. During the analysis of the world experience of research on this topic, the key factors affecting the formation of collapse and discharge – natural and technological – are identified. The method of conducting experiments and collecting data for analyzing the influence of technological parameters of location, charging and initiation of wells on the volume of rock mass discharge is described. It is established that the main discharge to the pit haulage berm is formed by the volume of rock mass limited by the prism of the slope angle. With a sufficient rock mass displacement from the edge of the bench crest towards the center of the block, only the wells of the 1st and 2nd rows participate in the discharge formation. Empirical dependences of the total volume of rock mass discharge on the length of the block along the bench crest, the specific consumption of explosives, the size of a rock piece P50 and the rate of rock breaking are obtained. The obtained results can be used to design the parameters of the drilling and blasting operations (DBO), as well as to predict and evaluate the possible consequences of a mass explosion in similar mining and geological conditions.","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":null,"pages":null},"PeriodicalIF":2.4000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mining Institute","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31897/pmi.2021.3.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 1

Abstract

Minimizing the discharge of blasted rock mass into the developed space of the pit is a very relevant area for study, as it allows to increase the processability of work and reduce the cost of mining. The article presents the results of experimental industrial explosions, during which the study of this issue was conducted. The main purpose of the work was to establish the key factors affecting the volume of rock mass discharge to the pit haulage berm. During the analysis of the world experience of research on this topic, the key factors affecting the formation of collapse and discharge – natural and technological – are identified. The method of conducting experiments and collecting data for analyzing the influence of technological parameters of location, charging and initiation of wells on the volume of rock mass discharge is described. It is established that the main discharge to the pit haulage berm is formed by the volume of rock mass limited by the prism of the slope angle. With a sufficient rock mass displacement from the edge of the bench crest towards the center of the block, only the wells of the 1st and 2nd rows participate in the discharge formation. Empirical dependences of the total volume of rock mass discharge on the length of the block along the bench crest, the specific consumption of explosives, the size of a rock piece P50 and the rate of rock breaking are obtained. The obtained results can be used to design the parameters of the drilling and blasting operations (DBO), as well as to predict and evaluate the possible consequences of a mass explosion in similar mining and geological conditions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
坑道自由面岩体爆炸泄放的经验规律研究
最大限度地减少爆破岩体向矿坑发育空间的排放是一个非常相关的研究领域,因为它可以提高工作的可加工性,降低开采成本。本文介绍了工业爆炸实验的结果,并对这一问题进行了研究。本文的主要目的是确定影响矿坑运输护堤排土量的关键因素。在分析国内外研究经验的基础上,确定了影响塌方和泄放形成的关键因素——自然因素和技术因素。介绍了为分析井位、装药、起爆等工艺参数对岩体泄放体积的影响而进行试验和数据收集的方法。确定了矿坑运输护堤的主流量是由受坡角棱柱限制的岩体体积形成的。在从台峰边缘向区块中心位移足够的情况下,只有第1排和第2排井参与排液地层。得到了沿台阶顶块体长度、炸药比耗量、岩块尺寸P50和破岩速率与岩体泄放总量的经验依赖关系。所得结果可用于钻爆作业(DBO)参数的设计,以及预测和评价类似采矿和地质条件下集体爆炸可能产生的后果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Mining Institute
Journal of Mining Institute MINING & MINERAL PROCESSING-
CiteScore
7.50
自引率
25.00%
发文量
62
审稿时长
8 weeks
期刊最新文献
Laboratory, numerical and field assessment of the effectiveness of cyclic geomechanical treatment on a tournaisian carbonate reservoir Determination of the grid impedance in power consumption modes with harmonics Sorption purification of acid storage facility water from iron and titanium on organic polymeric materials Wodginite as an indicator mineral of tantalum-bearing pegmatites and granites Оценка сдвиговой прочности горных пород по трещинам на основе результатов испытаний образцов сферическими инденторами
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1