F. Clermidy, C. Bernard, R. Lemaire, Jérôme Martin, I. Panades, Y. Thonnart, P. Vivet, N. Wehn
{"title":"A 477mW NoC-based digital baseband for MIMO 4G SDR","authors":"F. Clermidy, C. Bernard, R. Lemaire, Jérôme Martin, I. Panades, Y. Thonnart, P. Vivet, N. Wehn","doi":"10.1109/ISSCC.2010.5433920","DOIUrl":null,"url":null,"abstract":"Baseband processing for advanced Telecom applications have to face two contradictory issues [1]. The first one is the flexibility required, with the exploding number of modes for a single protocol (e.g. 63 for 3GPP-LTE), the number of protocols to be supported by a single chip (≫10 in 2010) and new applications requiring a handover between protocols. The second concern is related to performance and power consumption: performance demands are exploding (up to 100GOPS are now required) with decreasing power consumption constraints (roughly 500mW).","PeriodicalId":6418,"journal":{"name":"2010 IEEE International Solid-State Circuits Conference - (ISSCC)","volume":"628 1","pages":"278-279"},"PeriodicalIF":0.0000,"publicationDate":"2010-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"107","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE International Solid-State Circuits Conference - (ISSCC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSCC.2010.5433920","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 107
Abstract
Baseband processing for advanced Telecom applications have to face two contradictory issues [1]. The first one is the flexibility required, with the exploding number of modes for a single protocol (e.g. 63 for 3GPP-LTE), the number of protocols to be supported by a single chip (≫10 in 2010) and new applications requiring a handover between protocols. The second concern is related to performance and power consumption: performance demands are exploding (up to 100GOPS are now required) with decreasing power consumption constraints (roughly 500mW).