{"title":"Monitoring rock movement and—controlling ore loss and dilution associated with blasting at Geita and North Mara Gold mines, Tanzania","authors":"Stephen P. Magohe, Nice Shoo, Emilia Mapogha, C. Kinabo, Conrad Chambulikazi","doi":"10.1080/25726668.2022.2046684","DOIUrl":null,"url":null,"abstract":"ABSTRACT\n We present findings from a blast movement monitoring research conducted as a part of mine to mill campaign at the Geita Gold Mine—and additional data from blast monitoring practices at North Mara Gold Mine. These include measurement of the blast-induced rock movement and perimeter translation after blast derived from a blast shot at Nyankanga pit (Geita Gold Mine) and three other shots at the Nyabirama pit (North Mara Gold Mine). Using Blast Movement Technology, 34 movement-monitoring balls installed in 13 blast-monitoring boreholes made possible estimation of the average vertical and horizontal ore movements in the studied blast shots. Recorded ore movement estimates average horizontal and vertical movements of 3.69 and 1.56 m, respectively, at the Nyabirama pit and average horizontal and vertical movements of 4.5 and 2.48 m, respectively, at the Nyankanga pit. Based on the estimated material movements, zones of ore losses and dilution are established and new dig lines are proposed from successful ore block translation in all blast shots.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"49 1","pages":"90 - 103"},"PeriodicalIF":1.8000,"publicationDate":"2022-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2022.2046684","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 0

Abstract

ABSTRACT We present findings from a blast movement monitoring research conducted as a part of mine to mill campaign at the Geita Gold Mine—and additional data from blast monitoring practices at North Mara Gold Mine. These include measurement of the blast-induced rock movement and perimeter translation after blast derived from a blast shot at Nyankanga pit (Geita Gold Mine) and three other shots at the Nyabirama pit (North Mara Gold Mine). Using Blast Movement Technology, 34 movement-monitoring balls installed in 13 blast-monitoring boreholes made possible estimation of the average vertical and horizontal ore movements in the studied blast shots. Recorded ore movement estimates average horizontal and vertical movements of 3.69 and 1.56 m, respectively, at the Nyabirama pit and average horizontal and vertical movements of 4.5 and 2.48 m, respectively, at the Nyankanga pit. Based on the estimated material movements, zones of ore losses and dilution are established and new dig lines are proposed from successful ore block translation in all blast shots.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
监测岩石运动,控制与爆破有关的Geita和North Mara金矿的矿石损失和稀释
本文介绍了Geita金矿从矿山到矿山的爆破运动监测研究结果,以及北玛拉金矿爆破监测实践的额外数据。这些测量包括在Nyankanga矿(Geita金矿)和Nyabirama矿(North Mara金矿)的另外三次爆炸中测量爆炸引起的岩石运动和爆炸后的周长平移。利用爆破移动技术,在13个爆破监测钻孔中安装了34个移动监测球,可以估计所研究爆破中矿石的平均垂直和水平移动。记录的矿石移动估计,Nyabirama矿平均水平和垂直移动分别为3.69米和1.56米,Nyankanga矿平均水平和垂直移动分别为4.5米和2.48米。根据估计的物质移动,建立了矿石损失贫化带,并根据所有爆破中成功的矿块平移提出了新的掘进线。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.20
自引率
9.10%
发文量
5
期刊最新文献
Digital twins in the minerals industry – a comprehensive review Mining Metaverse – a future collaborative tool for best practice mining Reliability evaluation of CAN-bus connectors with tailored testing Sustainable open pit fleet management system: integrating economic and environmental objectives into truck allocation A Genetic algorithm scheme for large scale open-pit mine production scheduling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1