Connection of system for changing track gauge of freight wagons test stand

Peter Strážovec, Andrej Suchánek, P. Šťastniak
{"title":"Connection of system for changing track gauge of freight wagons test stand","authors":"Peter Strážovec, Andrej Suchánek, P. Šťastniak","doi":"10.1063/1.5140875","DOIUrl":null,"url":null,"abstract":"The test stand for proper operation shall have a equipped of auxiliary systems. One of them is the track gauge adjustment system. The original gauge adjustment mechanism revealed shortcomings caused by the wear in operation. The new solution of track gauge setup on the test stand consists of hydraulic circuit design, construction, control and subsequent verification of reliability and proper operation. For proper operation and accurate results, the test bench was fitted with an apparatus for centering the rotating rail. The measuring apparatus shows what gauge is set on the rotating rails and in which position the individual rail are located. Measurements have been made to verify the functionality of the system and to help set the correct function of the hydraulic cylinders. By examining the transverse forces at unloaded rotating rails, the proper function of the hydraulic system has been verified. After load of the rotating rails with wheelset was monitored by the process of the guiding (transverse), longitudinal and wheeled (vertical) forces.The test stand for proper operation shall have a equipped of auxiliary systems. One of them is the track gauge adjustment system. The original gauge adjustment mechanism revealed shortcomings caused by the wear in operation. The new solution of track gauge setup on the test stand consists of hydraulic circuit design, construction, control and subsequent verification of reliability and proper operation. For proper operation and accurate results, the test bench was fitted with an apparatus for centering the rotating rail. The measuring apparatus shows what gauge is set on the rotating rails and in which position the individual rail are located. Measurements have been made to verify the functionality of the system and to help set the correct function of the hydraulic cylinders. By examining the transverse forces at unloaded rotating rails, the proper function of the hydraulic system has been verified. After load of the rotating rails with wheelset was monitored by the process of the guiding (transverse), lon...","PeriodicalId":20577,"journal":{"name":"PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON BIOSCIENCE, BIOTECHNOLOGY, AND BIOMETRICS 2019","volume":"95 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-12-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON BIOSCIENCE, BIOTECHNOLOGY, AND BIOMETRICS 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1063/1.5140875","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The test stand for proper operation shall have a equipped of auxiliary systems. One of them is the track gauge adjustment system. The original gauge adjustment mechanism revealed shortcomings caused by the wear in operation. The new solution of track gauge setup on the test stand consists of hydraulic circuit design, construction, control and subsequent verification of reliability and proper operation. For proper operation and accurate results, the test bench was fitted with an apparatus for centering the rotating rail. The measuring apparatus shows what gauge is set on the rotating rails and in which position the individual rail are located. Measurements have been made to verify the functionality of the system and to help set the correct function of the hydraulic cylinders. By examining the transverse forces at unloaded rotating rails, the proper function of the hydraulic system has been verified. After load of the rotating rails with wheelset was monitored by the process of the guiding (transverse), longitudinal and wheeled (vertical) forces.The test stand for proper operation shall have a equipped of auxiliary systems. One of them is the track gauge adjustment system. The original gauge adjustment mechanism revealed shortcomings caused by the wear in operation. The new solution of track gauge setup on the test stand consists of hydraulic circuit design, construction, control and subsequent verification of reliability and proper operation. For proper operation and accurate results, the test bench was fitted with an apparatus for centering the rotating rail. The measuring apparatus shows what gauge is set on the rotating rails and in which position the individual rail are located. Measurements have been made to verify the functionality of the system and to help set the correct function of the hydraulic cylinders. By examining the transverse forces at unloaded rotating rails, the proper function of the hydraulic system has been verified. After load of the rotating rails with wheelset was monitored by the process of the guiding (transverse), lon...
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
货车试验台轨距更换系统的连接
为使试验台正常工作,应配备辅助系统。其中之一是轨距调整系统。原来的量规调整机构在使用中由于磨损而暴露出缺点。新方案包括液压回路的设计、施工、控制以及后续的可靠性和正常运行验证。为了保证操作的正确性和实验结果的准确性,试验台安装了旋转导轨定心装置。测量装置显示在旋转轨道上设置的量规以及各个轨道位于哪个位置。测量是为了验证系统的功能,并帮助设置液压缸的正确功能。通过对卸载旋转导轨横向力的检测,验证了液压系统的正常工作。利用导向力(横向)、纵向力和轮对力(垂直)的变化过程监测带轮对旋转导轨的受力情况。为使试验台正常工作,应配备辅助系统。其中之一是轨距调整系统。原来的量规调整机构在使用中由于磨损而暴露出缺点。新方案包括液压回路的设计、施工、控制以及后续的可靠性和正常运行验证。为了保证操作的正确性和实验结果的准确性,试验台安装了旋转导轨定心装置。测量装置显示在旋转轨道上设置的量规以及各个轨道位于哪个位置。测量是为了验证系统的功能,并帮助设置液压缸的正确功能。通过对卸载旋转导轨横向力的检测,验证了液压系统的正常工作。采用导向(横向)过程监测带轮对转轨的载荷后,对其进行了分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Effect of impulse loading on cracked beam with L-shaped cross section Growth and yield of rice plants sprayed with Sargassum polycystum extracted with different of concentration Conventional and unconventional methods for purifying process gas generated by a gasification plant Genetically engineered food products threaten human health: A comprehensive research needed The effects of temperature and roasting time on the quality of ground Robusta coffee (Coffea rabusta) using Gene Café roaster
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1