Nonmetallic reinforcement at the cap widening of Carola Bridge in Dresden

Harald Michler, Silke Scheerer, Stefan Burgard, Holger Kalbe, Manfred Curbach
{"title":"Nonmetallic reinforcement at the cap widening of Carola Bridge in Dresden","authors":"Harald Michler,&nbsp;Silke Scheerer,&nbsp;Stefan Burgard,&nbsp;Holger Kalbe,&nbsp;Manfred Curbach","doi":"10.1002/cend.202100046","DOIUrl":null,"url":null,"abstract":"<p>The Carola Bridge (Carolabrücke), built in 1971, has a length of approximately 375 m and takes the tram and the B 170 federal road in Dresden across the river Elbe. The intensive use of the bridge and deficits in user-friendliness made building measures inevitable. One part was the widening of the upstream bridge cap. Here, the application of a new nonmetallic reinforcement within the concrete cover was planned to improve the service life of the cap, a so far unique method. Based on an installation test and an investigation of the cracking behavior, both described in the paper, two reinforcement configurations were selected for practical application. The project provides an ideal opportunity to bring carbon and basalt reinforcements closer to the public and to demonstrate their cast in during normal operation on a concrete construction site.</p>","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"4 4","pages":"131-140"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202100046","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering Design","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/cend.202100046","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The Carola Bridge (Carolabrücke), built in 1971, has a length of approximately 375 m and takes the tram and the B 170 federal road in Dresden across the river Elbe. The intensive use of the bridge and deficits in user-friendliness made building measures inevitable. One part was the widening of the upstream bridge cap. Here, the application of a new nonmetallic reinforcement within the concrete cover was planned to improve the service life of the cap, a so far unique method. Based on an installation test and an investigation of the cracking behavior, both described in the paper, two reinforcement configurations were selected for practical application. The project provides an ideal opportunity to bring carbon and basalt reinforcements closer to the public and to demonstrate their cast in during normal operation on a concrete construction site.

Abstract Image

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
德累斯顿卡罗拉大桥桥头加宽处的非金属加固
卡罗拉桥(carolabr cke)建于1971年,全长约375米,将有轨电车和德累斯顿的b170联邦公路跨越易北河。桥梁的密集使用和用户友好性的缺陷使得建筑措施不可避免。其中一部分是上游桥帽的加宽。在这里,计划在混凝土覆盖层内应用新的非金属钢筋,以提高桥帽的使用寿命,这是迄今为止唯一的方法。根据本文所述的安装试验和开裂行为研究,选择了两种加固配置进行实际应用。该项目提供了一个理想的机会,使碳和玄武岩增强材料更接近公众,并在混凝土施工现场的正常操作中展示它们的浇筑效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Issue Information Image-based quality control of fresh concrete based on semantic segmentation algorithms Blockchain and the lifecycle of components—An approach Toward machine learning based decision support for pre-grouting in hard rock From digital model to digital twin in tunnel construction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1