首页 > 最新文献

Civil Engineering Design最新文献

英文 中文
Image-based quality control of fresh concrete based on semantic segmentation algorithms 基于语义分割算法的新拌混凝土图像质量控制
Pub Date : 2024-10-10 DOI: 10.1002/cend.202410011
Tobias Schack, Max Coenen, Michael Haist

In practice, various empirical methods such as the flow table test or the slump test are in use worldwide for assessing the workability of fresh concrete on the construction site. The majority of these tests has in common, that fresh concrete is subjected to some kind of defined flow process on a standardized table-like platform and that the geometrical properties of the material after the flow has ceased is determined by simple means such as measuring the flow cake diameter or its sag. The paper at hand proposes a novel image-based approach for an automatic derivation of concrete properties as part of the flow table test. The image-based method enables a digital evaluation of concrete properties. By combining digital image analysis and deep learning methods, not only the consistency but also an abundance of additional concrete properties can be derived from image data. In this way, the quality control of the fresh concrete can be expanded to include a large number of additional parameters, currently not available to the producer nor to the construction site. This data can be integrated into a digital control loop, with which communication between the concrete producer and the construction site can be automated using highly precise real-time data.

在实践中,全世界都在使用各种经验方法,如流动台试验或坍落度试验,来评估施工现场新拌混凝土的工作性。大多数这些试验的共同点是,新拌混凝土在一个标准化的台状平台上经历某种确定的流动过程,并通过测量流饼直径或其下垂度等简单方法确定材料停止流动后的几何特性。本文提出了一种基于图像的新方法,用于自动推导混凝土特性,作为流动台试验的一部分。这种基于图像的方法可以对混凝土性能进行数字化评估。通过结合数字图像分析和深度学习方法,不仅可以从图像数据中推导出混凝土的一致性,还可以推导出大量额外的混凝土特性。这样,新拌混凝土的质量控制就可以扩展到包括大量附加参数,而这些参数目前既不能提供给生产商,也不能提供给施工现场。这些数据可以集成到一个数字控制回路中,从而利用高精度的实时数据自动实现混凝土生产商和施工现场之间的通信。
{"title":"Image-based quality control of fresh concrete based on semantic segmentation algorithms","authors":"Tobias Schack,&nbsp;Max Coenen,&nbsp;Michael Haist","doi":"10.1002/cend.202410011","DOIUrl":"https://doi.org/10.1002/cend.202410011","url":null,"abstract":"<p>In practice, various empirical methods such as the flow table test or the slump test are in use worldwide for assessing the workability of fresh concrete on the construction site. The majority of these tests has in common, that fresh concrete is subjected to some kind of defined flow process on a standardized table-like platform and that the geometrical properties of the material after the flow has ceased is determined by simple means such as measuring the flow cake diameter or its sag. The paper at hand proposes a novel image-based approach for an automatic derivation of concrete properties as part of the flow table test. The image-based method enables a digital evaluation of concrete properties. By combining digital image analysis and deep learning methods, not only the consistency but also an abundance of additional concrete properties can be derived from image data. In this way, the quality control of the fresh concrete can be expanded to include a large number of additional parameters, currently not available to the producer nor to the construction site. This data can be integrated into a digital control loop, with which communication between the concrete producer and the construction site can be automated using highly precise real-time data.</p>","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 3","pages":"96-105"},"PeriodicalIF":0.0,"publicationDate":"2024-10-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202410011","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"142429804","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Blockchain and the lifecycle of components—An approach 区块链与组件生命周期--一种方法
Pub Date : 2024-09-29 DOI: 10.1002/cend.202400022
Heiko Meinen, Julian Dreyer, Katrin Kock, Roman Huebner

Buildings involve multiple participants and materials that must work together throughout their life cycle, from initial planning to decommissioning and recycling. This can create safety concerns, particularly with regard to critical components. Detailed documentation and tracking of product characteristics are necessary, as well as outlining the related obligations of the parties involved. Currently, this problem is often addressed by numerous contracts and paper-based building documentation. Blockchain technology could prove to be a future-oriented solution to such use cases. Additionally, so-called Smart Contracts, which are custom-designed applications running on the given Blockchain platform, can be an appropriate way for documentation in the construction and facility management process since they allow distribution of their execution to the entirety of the involved Blockchain participants. Based on this approach, this paper presents a platform solution that provides up-to-date product information on various components. The outcome is a system that facilitates digital documentation on a secure legal foundation, with an interface tailored to the specific terms and conditions of each partner involved in the construction and maintenance process.

从最初的规划到退役和回收利用,建筑物在整个生命周期内必须有多个参与方和多种材料共同发挥作用。这可能会造成安全问题,特别是在关键部件方面。有必要对产品特性进行详细记录和跟踪,并概述相关各方的相关义务。目前,这一问题通常通过大量合同和纸质建筑文件来解决。区块链技术可能被证明是解决此类用例的一种面向未来的方案。此外,所谓的智能合约是在特定区块链平台上运行的定制设计应用程序,可以成为建筑和设施管理过程中记录文档的适当方式,因为它们允许将其执行分配给所有相关的区块链参与者。基于这种方法,本文提出了一种平台解决方案,可提供各种组件的最新产品信息。该系统的成果是在安全的法律基础上为数字文档提供便利,其界面根据参与建设和维护过程的每个合作伙伴的具体条款和条件量身定制。
{"title":"Blockchain and the lifecycle of components—An approach","authors":"Heiko Meinen,&nbsp;Julian Dreyer,&nbsp;Katrin Kock,&nbsp;Roman Huebner","doi":"10.1002/cend.202400022","DOIUrl":"https://doi.org/10.1002/cend.202400022","url":null,"abstract":"<p>Buildings involve multiple participants and materials that must work together throughout their life cycle, from initial planning to decommissioning and recycling. This can create safety concerns, particularly with regard to critical components. Detailed documentation and tracking of product characteristics are necessary, as well as outlining the related obligations of the parties involved. Currently, this problem is often addressed by numerous contracts and paper-based building documentation. Blockchain technology could prove to be a future-oriented solution to such use cases. Additionally, so-called Smart Contracts, which are custom-designed applications running on the given Blockchain platform, can be an appropriate way for documentation in the construction and facility management process since they allow distribution of their execution to the entirety of the involved Blockchain participants. Based on this approach, this paper presents a platform solution that provides up-to-date product information on various components. The outcome is a system that facilitates digital documentation on a secure legal foundation, with an interface tailored to the specific terms and conditions of each partner involved in the construction and maintenance process.</p>","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 3","pages":"84-95"},"PeriodicalIF":0.0,"publicationDate":"2024-09-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202400022","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"142430340","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Toward machine learning based decision support for pre-grouting in hard rock 为硬岩预灌浆提供基于机器学习的决策支持
Pub Date : 2024-09-23 DOI: 10.1002/cend.202400012
Ida Rongved, Tom F. Hansen, Georg H. Erharter

Pre-grouting in hard rock tunneling is crucial for mitigating water ingress, significantly affecting project time and cost. Predicting pre-grouting requirements is challenging and relies heavily on the expertise of on-site personnel for decision-making. This paper explores using supervised machine learning (ML) to create a data-driven pre-grouting decision process, aiming to predict “grouting time” and “total grout take.” Tree-based regression models were developed using data from a Norwegian railway project, including typical tunneling data. These models showed limited predictive performance, with R2 scores of 0.40, though a significant relationship was observed. The limited performance highlights the need to identify parameters that significantly impact grouting outcomes rather than indicating the unsuitability of tree-based models. Future research should consider a larger data set and additional parameters, such as more data on rock mass quality, hydrogeological conditions ahead of the face, and human, organizational, and contractual factors. Despite initial findings, supervised ML shows promise in enhancing data-driven decision-making in pre-grouting by using appropriate input features and target variables.

硬岩隧道工程中的预灌浆对于减少进水至关重要,会对工程时间和成本产生重大影响。预测预注浆要求具有挑战性,并且在很大程度上依赖于现场人员的专业知识进行决策。本文探讨了使用有监督的机器学习(ML)来创建数据驱动的预灌浆决策流程,旨在预测 "灌浆时间 "和 "总灌浆量"。利用挪威铁路项目的数据(包括典型的隧道挖掘数据)开发了基于树的回归模型。这些模型显示出有限的预测性能,R2 分数为 0.40,尽管观察到了显著的关系。有限的性能突出了确定对灌浆结果有重大影响的参数的必要性,而不是表明基于树的模型不适合。未来的研究应该考虑更大的数据集和更多的参数,例如关于岩体质量、工作面前方水文地质条件以及人为、组织和合同因素的更多数据。尽管有了初步研究结果,但有监督的 ML 通过使用适当的输入特征和目标变量,在加强灌浆前的数据驱动决策方面还是大有可为的。
{"title":"Toward machine learning based decision support for pre-grouting in hard rock","authors":"Ida Rongved,&nbsp;Tom F. Hansen,&nbsp;Georg H. Erharter","doi":"10.1002/cend.202400012","DOIUrl":"https://doi.org/10.1002/cend.202400012","url":null,"abstract":"<p>Pre-grouting in hard rock tunneling is crucial for mitigating water ingress, significantly affecting project time and cost. Predicting pre-grouting requirements is challenging and relies heavily on the expertise of on-site personnel for decision-making. This paper explores using supervised machine learning (ML) to create a data-driven pre-grouting decision process, aiming to predict “grouting time” and “total grout take.” Tree-based regression models were developed using data from a Norwegian railway project, including typical tunneling data. These models showed limited predictive performance, with <i>R</i><sup>2</sup> scores of 0.40, though a significant relationship was observed. The limited performance highlights the need to identify parameters that significantly impact grouting outcomes rather than indicating the unsuitability of tree-based models. Future research should consider a larger data set and additional parameters, such as more data on rock mass quality, hydrogeological conditions ahead of the face, and human, organizational, and contractual factors. Despite initial findings, supervised ML shows promise in enhancing data-driven decision-making in pre-grouting by using appropriate input features and target variables.</p>","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 3","pages":"63-73"},"PeriodicalIF":0.0,"publicationDate":"2024-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202400012","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"142430230","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
From digital model to digital twin in tunnel construction 隧道施工中从数字模型到数字孪生
Pub Date : 2024-08-30 DOI: 10.1002/cend.202400020
Hannah Salzgeber, Melanie Ernst, Larissa Schneiderbauer, Matthias Flora

This article takes a further step on the digitalization path in tunneling by implementing the concept of the digital twin and examining its potential at the three levels of real-world integration: digital model, digital shadow, and digital twin (DT). It evaluates the current implementation of tunnel information modeling and its adoption in the infrastructure sector. The importance of structured and real-time data synchronization through technologies such as IoT and Big Data is emphasized. It explores advancements from tunnel model to shadow to DT, emphasizing the importance of structured and data real-time synchronization through technologies like IoT and Big Data. A comprehensive literature review highlights both technical and non-technical barriers to the implementation of DT. Continuous improvement of DT, supported by advancements in data acquisition and analytical methods, is expected to significantly enhance tunnel construction. As a main focus, this article provides a framework for a centralized and comprehensive platform for all levels of tunnel twin development, leveraging Autodesk Platform Services. It concludes with a vision for the future, discusses emerging technologies advocating for a strategic approach to digital transformation in tunneling that leverages technological innovations for sustainable development and societal benefits.

本文通过实施数字孪生的概念,并从数字模型、数字影像和数字孪生(DT)这三个现实世界集成的层面来研究其潜力,从而在隧道工程的数字化道路上迈出了新的一步。报告评估了隧道信息建模的当前实施情况及其在基础设施领域的应用。报告强调了通过物联网和大数据等技术实现结构化和实时数据同步的重要性。报告探讨了从隧道模型到阴影再到 DT 的发展,强调了通过物联网和大数据等技术实现结构化和数据实时同步的重要性。全面的文献综述强调了实施 DT 的技术和非技术障碍。在数据采集和分析方法进步的支持下,DT 的持续改进有望显著提高隧道施工水平。作为重点,本文利用欧特克平台服务,为各级隧道孪生开发提供了一个集中式综合平台框架。文章最后提出了未来愿景,讨论了新兴技术,倡导采用战略性方法实现隧道工程的数字化转型,利用技术创新促进可持续发展和社会效益。
{"title":"From digital model to digital twin in tunnel construction","authors":"Hannah Salzgeber,&nbsp;Melanie Ernst,&nbsp;Larissa Schneiderbauer,&nbsp;Matthias Flora","doi":"10.1002/cend.202400020","DOIUrl":"https://doi.org/10.1002/cend.202400020","url":null,"abstract":"<p>This article takes a further step on the digitalization path in tunneling by implementing the concept of the digital twin and examining its potential at the three levels of real-world integration: digital model, digital shadow, and digital twin (DT). It evaluates the current implementation of tunnel information modeling and its adoption in the infrastructure sector. The importance of structured and real-time data synchronization through technologies such as IoT and Big Data is emphasized. It explores advancements from tunnel model to shadow to DT, emphasizing the importance of structured and data real-time synchronization through technologies like IoT and Big Data. A comprehensive literature review highlights both technical and non-technical barriers to the implementation of DT. Continuous improvement of DT, supported by advancements in data acquisition and analytical methods, is expected to significantly enhance tunnel construction. As a main focus, this article provides a framework for a centralized and comprehensive platform for all levels of tunnel twin development, leveraging Autodesk Platform Services. It concludes with a vision for the future, discusses emerging technologies advocating for a strategic approach to digital transformation in tunneling that leverages technological innovations for sustainable development and societal benefits.</p>","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 3","pages":"74-83"},"PeriodicalIF":0.0,"publicationDate":"2024-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202400020","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"142430288","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Automating computational design with generative AI 利用生成式人工智能实现计算设计自动化
Pub Date : 2024-07-17 DOI: 10.1002/cend.202400006
Joern Ploennigs, Markus Berger

AI image generators based on diffusion models have recently garnered attention for their capability to create images from simple text prompts. However, for practical use in civil engineering they need to be able to create specific construction plans for given constraints. This paper investigates the potential of current AI generators in addressing such challenges, specifically for the creation of simple floor plans. We explain how the underlying diffusion-models work and propose novel refinement approaches to improve semantic encoding and generation quality. In several experiments we show that we can improve validity of generated floor plans from 6% to 90%. Based on these results we derive future research challenges considering building information modeling. With this we provide: (i) evaluation of current generative AIs; (ii) propose improved refinement approaches; (iii) evaluate them on various examples; (iv) derive future directions for diffusion models in civil engineering.

基于扩散模型的人工智能图像生成器最近因能够根据简单的文本提示创建图像而备受关注。然而,为了在土木工程中实际使用,它们需要能够在给定的限制条件下创建具体的施工图。本文研究了当前人工智能生成器在应对此类挑战方面的潜力,特别是在创建简单平面图方面。我们解释了底层扩散模型的工作原理,并提出了改进语义编码和生成质量的新颖完善方法。在几个实验中,我们表明可以将生成的平面图的有效性从 6% 提高到 90%。基于这些结果,我们得出了建筑信息建模方面未来的研究挑战。为此,我们提供(i) 评估当前的生成式人工智能;(ii) 提出改进的完善方法;(iii) 在各种示例中对其进行评估;(iv) 为土木工程中的扩散模型提出未来方向。
{"title":"Automating computational design with generative AI","authors":"Joern Ploennigs,&nbsp;Markus Berger","doi":"10.1002/cend.202400006","DOIUrl":"https://doi.org/10.1002/cend.202400006","url":null,"abstract":"<p>AI image generators based on diffusion models have recently garnered attention for their capability to create images from simple text prompts. However, for practical use in civil engineering they need to be able to create specific construction plans for given constraints. This paper investigates the potential of current AI generators in addressing such challenges, specifically for the creation of simple floor plans. We explain how the underlying diffusion-models work and propose novel refinement approaches to improve semantic encoding and generation quality. In several experiments we show that we can improve validity of generated floor plans from 6% to 90%. Based on these results we derive future research challenges considering building information modeling. With this we provide: (i) evaluation of current generative AIs; (ii) propose improved refinement approaches; (iii) evaluate them on various examples; (iv) derive future directions for diffusion models in civil engineering.</p>","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 2","pages":"41-52"},"PeriodicalIF":0.0,"publicationDate":"2024-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202400006","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141967361","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Realignment of Civil Engineering Design 调整土木工程设计
Pub Date : 2024-07-16 DOI: 10.1002/cend.202410000
Matthias Flora
{"title":"Realignment of Civil Engineering Design","authors":"Matthias Flora","doi":"10.1002/cend.202410000","DOIUrl":"10.1002/cend.202410000","url":null,"abstract":"","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 2","pages":"25"},"PeriodicalIF":0.0,"publicationDate":"2024-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202410000","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141832555","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A semi-automated and structured approach for creating a Geotechnical Synthesis Model 创建岩土工程综合模型的半自动化结构化方法
Pub Date : 2024-06-25 DOI: 10.1002/cend.202400007
Hannah Werkgarner, Hannah Salzgeber, Hans Exenberger, Manfred Harder, Larissa Schneiderbauer

This article presents an innovative approach to structured information exchange in ground modeling, integrating geology, geotechnics, and hydrogeology. It proposes a data framework seamlessly merging the DAUB's modeling guidelines with the University of Innsbruck research. Addressing diverse data management challenges and ensuring interoperability, the workflow offers solutions for CAD- and interpolation-based modeling, enabling semi-automated generation of Geotechnical Synthesis Models with open file format export. Overcoming obstacles, the article introduces a uniform rasterization method, defining a tunnel-specific repository voxel (Tuxel). Results showcase a streamlined, semi-automated process using Autodesk Civil 3D® and Seequent Leapfrog Works®, enhancing data uniformity and enabling cross-project information exchange. This workflow provides practical solutions for collaborative ground modeling within BIM/TIM frameworks, fostering efficient and standardized data handling.

本文提出了一种创新的方法,将地质学、岩土工程学和水文地质学整合在一起,用于地面建模的结构化信息交换。文章提出了一个数据框架,将 DAUB 的建模指南与因斯布鲁克大学的研究无缝融合。为了应对各种数据管理挑战并确保互操作性,该工作流程提供了基于 CAD 和插值建模的解决方案,可半自动生成岩土工程综合模型,并以开放文件格式导出。为了克服障碍,文章介绍了一种统一的光栅化方法,定义了隧道专用的存储体素(Tuxel)。结果展示了使用 Autodesk Civil 3D® 和 Seequent Leapfrog Works® 的简化、半自动化流程,提高了数据的统一性,实现了跨项目信息交换。该工作流程为 BIM/TIM 框架内的地面协同建模提供了实用的解决方案,促进了高效和标准化的数据处理。
{"title":"A semi-automated and structured approach for creating a Geotechnical Synthesis Model","authors":"Hannah Werkgarner,&nbsp;Hannah Salzgeber,&nbsp;Hans Exenberger,&nbsp;Manfred Harder,&nbsp;Larissa Schneiderbauer","doi":"10.1002/cend.202400007","DOIUrl":"https://doi.org/10.1002/cend.202400007","url":null,"abstract":"<p>This article presents an innovative approach to structured information exchange in ground modeling, integrating geology, geotechnics, and hydrogeology. It proposes a data framework seamlessly merging the DAUB's modeling guidelines with the University of Innsbruck research. Addressing diverse data management challenges and ensuring interoperability, the workflow offers solutions for CAD- and interpolation-based modeling, enabling semi-automated generation of Geotechnical Synthesis Models with open file format export. Overcoming obstacles, the article introduces a uniform rasterization method, defining a tunnel-specific repository voxel (Tuxel). Results showcase a streamlined, semi-automated process using Autodesk Civil 3D® and Seequent Leapfrog Works®, enhancing data uniformity and enabling cross-project information exchange. This workflow provides practical solutions for collaborative ground modeling within BIM/TIM frameworks, fostering efficient and standardized data handling.</p>","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 2","pages":"26-32"},"PeriodicalIF":0.0,"publicationDate":"2024-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202400007","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141968164","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analysis of a raise boring reamer in operation based on acceleration measurements 基于加速度测量的提升镗铰刀运行分析
Pub Date : 2024-06-24 DOI: 10.1002/cend.202400005
Matthias Rigler, Raphael Speck, Matthias Flora

The understanding of the complex dynamic phenomena occurring during the reaming operations of the raise boring process is limited. Any operational damage of the reamer is very likely to be caused by component failure due to fatigue effects from the dynamic processes. Therefore, an innovative measurement setup consisting of acceleration sensors in three axes was installed on a reamer to capture its movements and vibrations during operation. The capture of the reaming process by acceleration sensors was successful, however no operational damage on the reamer was observed during the reaming of three vertical shafts. The collected vibration data was implemented into a dynamic finite element assessment, which is intended to serve for lifetime predictions of components and predictive maintenance. A further step is investigating the potential for the implementation of the measurement data into a condition monitoring system and for optimizing the reaming operation.

人们对提升镗孔过程中铰孔操作过程中发生的复杂动态现象的了解十分有限。铰刀的任何运行损坏都很可能是由于动态过程的疲劳效应导致的部件故障造成的。因此,在铰刀上安装了由三轴加速度传感器组成的创新测量装置,以捕捉铰刀在操作过程中的运动和振动。加速度传感器成功地捕捉到了铰削过程,但在铰削三根竖井的过程中,没有观察到铰削机的运行损坏。收集到的振动数据被应用到动态有限元评估中,用于预测部件的使用寿命和预测性维护。下一步是研究将测量数据应用于状态监测系统和优化铰孔操作的可能性。
{"title":"Analysis of a raise boring reamer in operation based on acceleration measurements","authors":"Matthias Rigler,&nbsp;Raphael Speck,&nbsp;Matthias Flora","doi":"10.1002/cend.202400005","DOIUrl":"https://doi.org/10.1002/cend.202400005","url":null,"abstract":"<p>The understanding of the complex dynamic phenomena occurring during the reaming operations of the raise boring process is limited. Any operational damage of the reamer is very likely to be caused by component failure due to fatigue effects from the dynamic processes. Therefore, an innovative measurement setup consisting of acceleration sensors in three axes was installed on a reamer to capture its movements and vibrations during operation. The capture of the reaming process by acceleration sensors was successful, however no operational damage on the reamer was observed during the reaming of three vertical shafts. The collected vibration data was implemented into a dynamic finite element assessment, which is intended to serve for lifetime predictions of components and predictive maintenance. A further step is investigating the potential for the implementation of the measurement data into a condition monitoring system and for optimizing the reaming operation.</p>","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 2","pages":"53-59"},"PeriodicalIF":0.0,"publicationDate":"2024-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202400005","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141968123","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Use cases of a digital twin bridge in operation 数字孪生桥的使用案例
Pub Date : 2024-05-07 DOI: 10.1002/cend.202400010
Sonja Nieborowski, Sarah Windmann, Jennifer Bednorz, Iris Hindersmann, Tim Zinke

The digital twin bridge makes an important contribution on the way to predictive life cycle management. The potentials are many, especially in the life cycle phase “operation.” There, the digital twin bridge can serve as an efficient tool in terms of analyses, predictions, control, and monitoring. The goal is optimized maintenance, the importance of which continues to grow in view of the current challenges for civil engineering structures. It is therefore particularly important that relevant stakeholders with their needs and requirements are involved in the conception of the digital twin bridge at an early stage. This approach is being pursued by the German Federal Highway Research Institute (BASt) in various research projects that already cover partial aspects of the digital twin and is also being continued in an ongoing project to develop an overall concept for the digital twin bridge. Possible use cases were collected and assigned to the topics of “operational processes,” “maintenance planning and implementation,” and “strategic life cycle management.” In a workshop, the use cases were discussed and initially ranked by and with stakeholders. The results form an important basis for the elaboration of the modular overall concept of the digital twin bridge and the way into practice.

数字孪生桥梁在实现预测性生命周期管理的道路上做出了重要贡献。其潜力是巨大的,尤其是在生命周期的 "运行 "阶段。在这一阶段,数字孪生桥可以作为分析、预测、控制和监测的有效工具。其目标是优化维护,鉴于土木工程结构当前面临的挑战,维护的重要性与日俱增。因此,在数字孪生桥梁构想的早期阶段,让相关利益方参与进来,了解他们的需求和要求,就显得尤为重要。德国联邦公路研究所(BASt)在各种研究项目中都采用了这种方法,这些项目已经涵盖了数字孪生的部分内容,并在一个正在进行的项目中继续开发数字孪生桥梁的整体概念。我们收集了可能的使用案例,并将其分配给 "操作流程"、"维护规划和实施 "以及 "战略生命周期管理 "等主题。在一次研讨会上,利益相关者对这些用例进行了讨论和初步排序。讨论结果为数字孪生桥梁模块化整体概念的制定和实践奠定了重要基础。
{"title":"Use cases of a digital twin bridge in operation","authors":"Sonja Nieborowski,&nbsp;Sarah Windmann,&nbsp;Jennifer Bednorz,&nbsp;Iris Hindersmann,&nbsp;Tim Zinke","doi":"10.1002/cend.202400010","DOIUrl":"10.1002/cend.202400010","url":null,"abstract":"<p>The digital twin bridge makes an important contribution on the way to predictive life cycle management. The potentials are many, especially in the life cycle phase “operation.” There, the digital twin bridge can serve as an efficient tool in terms of analyses, predictions, control, and monitoring. The goal is optimized maintenance, the importance of which continues to grow in view of the current challenges for civil engineering structures. It is therefore particularly important that relevant stakeholders with their needs and requirements are involved in the conception of the digital twin bridge at an early stage. This approach is being pursued by the German Federal Highway Research Institute (BASt) in various research projects that already cover partial aspects of the digital twin and is also being continued in an ongoing project to develop an overall concept for the digital twin bridge. Possible use cases were collected and assigned to the topics of “operational processes,” “maintenance planning and implementation,” and “strategic life cycle management.” In a workshop, the use cases were discussed and initially ranked by and with stakeholders. The results form an important basis for the elaboration of the modular overall concept of the digital twin bridge and the way into practice.</p>","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 2","pages":"33-40"},"PeriodicalIF":0.0,"publicationDate":"2024-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/cend.202400010","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141002191","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Editorial note 编辑说明
Pub Date : 2024-04-15 DOI: 10.1002/cend.202400011
Ing. Dirk Jesse
{"title":"Editorial note","authors":"Ing. Dirk Jesse","doi":"10.1002/cend.202400011","DOIUrl":"https://doi.org/10.1002/cend.202400011","url":null,"abstract":"","PeriodicalId":100248,"journal":{"name":"Civil Engineering Design","volume":"6 1","pages":"3"},"PeriodicalIF":0.0,"publicationDate":"2024-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140552843","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
期刊
Civil Engineering Design
全部 Acc. Chem. Res. ACS Applied Bio Materials ACS Appl. Electron. Mater. ACS Appl. Energy Mater. ACS Appl. Mater. Interfaces ACS Appl. Nano Mater. ACS Appl. Polym. Mater. ACS BIOMATER-SCI ENG ACS Catal. ACS Cent. Sci. ACS Chem. Biol. ACS Chemical Health & Safety ACS Chem. Neurosci. ACS Comb. Sci. ACS Earth Space Chem. ACS Energy Lett. ACS Infect. Dis. ACS Macro Lett. ACS Mater. Lett. ACS Med. Chem. Lett. ACS Nano ACS Omega ACS Photonics ACS Sens. ACS Sustainable Chem. Eng. ACS Synth. Biol. Anal. Chem. BIOCHEMISTRY-US Bioconjugate Chem. BIOMACROMOLECULES Chem. Res. Toxicol. Chem. Rev. Chem. Mater. CRYST GROWTH DES ENERG FUEL Environ. Sci. Technol. Environ. Sci. Technol. Lett. Eur. J. Inorg. Chem. IND ENG CHEM RES Inorg. Chem. J. Agric. Food. Chem. J. Chem. Eng. Data J. Chem. Educ. J. Chem. Inf. Model. J. Chem. Theory Comput. J. Med. Chem. J. Nat. Prod. J PROTEOME RES J. Am. Chem. Soc. LANGMUIR MACROMOLECULES Mol. Pharmaceutics Nano Lett. Org. Lett. ORG PROCESS RES DEV ORGANOMETALLICS J. Org. Chem. J. Phys. Chem. J. Phys. Chem. A J. Phys. Chem. B J. Phys. Chem. C J. Phys. Chem. Lett. Analyst Anal. Methods Biomater. Sci. Catal. Sci. Technol. Chem. Commun. Chem. Soc. Rev. CHEM EDUC RES PRACT CRYSTENGCOMM Dalton Trans. Energy Environ. Sci. ENVIRON SCI-NANO ENVIRON SCI-PROC IMP ENVIRON SCI-WAT RES Faraday Discuss. Food Funct. Green Chem. Inorg. Chem. Front. Integr. Biol. J. Anal. At. Spectrom. J. Mater. Chem. A J. Mater. Chem. B J. Mater. Chem. C Lab Chip Mater. Chem. Front. Mater. Horiz. MEDCHEMCOMM Metallomics Mol. Biosyst. Mol. Syst. Des. Eng. Nanoscale Nanoscale Horiz. Nat. Prod. Rep. New J. Chem. Org. Biomol. Chem. Org. Chem. Front. PHOTOCH PHOTOBIO SCI PCCP Polym. Chem.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1