Assessing and Comparing Environmental Assessment Pathways in Nepal

M. Aryal
{"title":"Assessing and Comparing Environmental Assessment Pathways in Nepal","authors":"M. Aryal","doi":"10.3126/jes.v9i1.56486","DOIUrl":null,"url":null,"abstract":"National Environmental Impact Assessment Guideline (NEIAG), 1993, is the major guiding legal document for the project level environmental assessment in Nepal which has provided the concrete methods for impact identification, prediction and evaluation for the proposals to be implemented. Environment Protection Act, 1997 (EPA-1997) and Environmental Protection Regulations, 1997 (EPR-1997) highlighted the categories and thresholds of the proposals requiring Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA), requirements of public hearing particularly for EIA, environmental monitoring by concerned ministries for IEE and Ministry of Environment (MoE) for EIA, Environmental Audit for EIA, punishments of five to twenty-fifty lakhs for implementing proposals without the approval of Environmental Assessment (EA) reports, timeline of fifteen days public notice, approval of IEE report within twenty-one days and sixty days for EIA report, provisions for Supplementary Environmental Impact Assessment (SEIA) and brief formats of the reports. Environment Protection Act, 2019 (EPA-2019) and Environment Protection Regulations, 2020 (EPR-2020) has advanced the existing provisions of EPA-1997 and EPR-1997. Brief Environmental Study (BES) has been added as a new project level environmental assessment required for the particular projects. EPA-2019 and EPR-2020 has empowered the provincial and local governments for conducting and approving the proposals to be executed in respective level of governments. Public hearing is made mandatory for all levels of environmental assessments. Proposals implemented without the approval and/or violating the provisions of approved reports are charged with the amount of fine up to five lakhs for BES, up to ten lakhs for IEE, and up to fifty lakhs for EIA. Requirement of Strategic Environmental Analysis (SEA) for plans, policies and programs is a new legal concept of environmental assessment at strategic level. The timeline for approval of Scoping Document (SD), Terms of Reference (ToR), BES and IEE report is within fifteen days of report submission, within sixty days of report submission for EIA report, submission of final BES, IEE and EIA report is mandatory within two years of SD and ToR approval and initiation of proposal implementation is within three years of EA report approval. The recent legal provisions also have provided room for updating of BES report, IEE report and Environmental Management Plan (EMP) as per the requirement of the proposal implementation. Blacklisting the consultants for not assuring the standards of reports as required by the government, detail formats of reports, language of the reports to be in Nepali language and alternative analysis of the mitigation measures for particular impact and suggestion of the best mitigation measures are some additional provisions in the newer legal provisions.","PeriodicalId":87298,"journal":{"name":"Journal of environment and health sciences","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-07-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of environment and health sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/jes.v9i1.56486","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

National Environmental Impact Assessment Guideline (NEIAG), 1993, is the major guiding legal document for the project level environmental assessment in Nepal which has provided the concrete methods for impact identification, prediction and evaluation for the proposals to be implemented. Environment Protection Act, 1997 (EPA-1997) and Environmental Protection Regulations, 1997 (EPR-1997) highlighted the categories and thresholds of the proposals requiring Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA), requirements of public hearing particularly for EIA, environmental monitoring by concerned ministries for IEE and Ministry of Environment (MoE) for EIA, Environmental Audit for EIA, punishments of five to twenty-fifty lakhs for implementing proposals without the approval of Environmental Assessment (EA) reports, timeline of fifteen days public notice, approval of IEE report within twenty-one days and sixty days for EIA report, provisions for Supplementary Environmental Impact Assessment (SEIA) and brief formats of the reports. Environment Protection Act, 2019 (EPA-2019) and Environment Protection Regulations, 2020 (EPR-2020) has advanced the existing provisions of EPA-1997 and EPR-1997. Brief Environmental Study (BES) has been added as a new project level environmental assessment required for the particular projects. EPA-2019 and EPR-2020 has empowered the provincial and local governments for conducting and approving the proposals to be executed in respective level of governments. Public hearing is made mandatory for all levels of environmental assessments. Proposals implemented without the approval and/or violating the provisions of approved reports are charged with the amount of fine up to five lakhs for BES, up to ten lakhs for IEE, and up to fifty lakhs for EIA. Requirement of Strategic Environmental Analysis (SEA) for plans, policies and programs is a new legal concept of environmental assessment at strategic level. The timeline for approval of Scoping Document (SD), Terms of Reference (ToR), BES and IEE report is within fifteen days of report submission, within sixty days of report submission for EIA report, submission of final BES, IEE and EIA report is mandatory within two years of SD and ToR approval and initiation of proposal implementation is within three years of EA report approval. The recent legal provisions also have provided room for updating of BES report, IEE report and Environmental Management Plan (EMP) as per the requirement of the proposal implementation. Blacklisting the consultants for not assuring the standards of reports as required by the government, detail formats of reports, language of the reports to be in Nepali language and alternative analysis of the mitigation measures for particular impact and suggestion of the best mitigation measures are some additional provisions in the newer legal provisions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
评估和比较尼泊尔的环境评估途径
1993年《国家环境影响评价准则》是尼泊尔项目一级环境评价的主要指导性法律文件,为将要实施的建议提供了确定、预测和评价影响的具体方法。《1997年环境保护法》(EPA-1997)和《1997年环境保护条例》(EPR-1997)强调了需要进行初步环境审查(IEE)和环境影响评价(EIA)的提案的类别和门槛,要求对环境影响评价(EIA)进行公开听证,有关部门对IEE和环境部(MoE)进行环境监测,对环境影响评价进行环境审计,未批准环境评估(EA)报告而实施建议的处罚为50至250万卢比,15天的公示时间,21天内批准环境评估报告,60天内批准环境影响评估报告,补充环境影响评估(SEIA)的规定和报告的简要格式。《2019年环境保护法》(EPA-2019)和《2020年环境保护条例》(EPR-2020)对EPA-1997和EPR-1997的现有规定进行了改进。已增加“简要环境研究”,作为个别工程项目所需的新工程级环境评估。《环境保护条例(2019)》和《环境保护条例(2020)》赋予了省和地方政府组织和批准本级政府实施方案的权力。各级环境评估都必须举行公开听证会。未经批准实施的建议和/或违反批准报告的规定,将被处以环境污染评估最高50万卢比、环境影响评估最高100万卢比、环境影响评估最高500万卢比的罚款。战略环境分析(Strategic Environmental Analysis, SEA)对规划、政策和方案的要求是一种新的战略层面的环境评价法律概念。范围界定文件(SD)、职权范围(ToR)、环境评估和环境影响评估报告的批准时间为报告提交后15天内,环境影响评估报告提交后60天内,环境评估和环境影响评估报告的最终报告必须在SD和环境影响评估报告批准后两年内提交,建议的实施则在环境影响评估报告批准后三年内开始。最近的法律规定也为根据提案实施的要求更新BES报告、IEE报告和环境管理计划(EMP)提供了空间。将未确保报告达到政府要求的标准的顾问列入黑名单、报告的详细格式、报告的语言应为尼泊尔语、针对特定影响的缓解措施的替代分析以及建议最佳缓解措施是新法律条款中的一些附加条款。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Identification of mammalian indicators of climate in Chitwan Annapurna Landscape (CHAL) to assess climate change Relation between Modis-based Aerosol Optical Depth and Particulate Matter in Kathmandu using Regression Model Impacts of Earthquake and Earthquake-induced Disasters on Community Forests in Nepal Assessing and Comparing Environmental Assessment Pathways in Nepal Flood Loss Assessment - A Case Study of Dordi Basin, Gandaki, Province
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1