Design on Rehabilitation of Landslide and Intake Waterproof Barrier of SHPP Nakra

Teodor Dimitrievski
{"title":"Design on Rehabilitation of Landslide and Intake Waterproof Barrier of SHPP Nakra","authors":"Teodor Dimitrievski","doi":"10.19080/CERJ.2019.07.555706","DOIUrl":null,"url":null,"abstract":"During the construction of small hydro power plant (SHPP) Nakra it was concluded that there is a need for developing of additional designs. The additional designs are related to the rehabilitation of landslide affecting the cut slopes near the future penstock and construction of waterproof barrier in front of the intake structure of the hydro power plant. This paper deals with some aspects related to the additional designs which are out of the original scope of the design works.","PeriodicalId":30320,"journal":{"name":"Constructii Journal of Civil Engineering Research","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-01-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Constructii Journal of Civil Engineering Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19080/CERJ.2019.07.555706","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

During the construction of small hydro power plant (SHPP) Nakra it was concluded that there is a need for developing of additional designs. The additional designs are related to the rehabilitation of landslide affecting the cut slopes near the future penstock and construction of waterproof barrier in front of the intake structure of the hydro power plant. This paper deals with some aspects related to the additional designs which are out of the original scope of the design works.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
中村SHPP滑坡修复及进水口防水屏障设计
在Nakra小型水力发电厂(SHPP)建设期间,得出的结论是需要开发额外的设计。增加的设计涉及到影响未来压力库附近的切坡滑坡的修复和水电站进水口结构前防水屏障的建设。本文论述了超出原设计作品范围的附加设计的有关问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
4
审稿时长
16 weeks
期刊最新文献
The Abductive Method to Generate Polymath Knowledge in Technical-Scientific Production Trends in the Addition of PET and Natural Fibers to the Concrete- Steel Reinforcement System Psychometric Properties of the Alcohol Use Disorders Identification Test (AUDIT) and Prevalence of Alcohol use Among SA Site-based Construction Workers Security & Happiness by Design for Happiness Initiated Behavioural Lead Intelligence Security System (HIBLISS) Groundwater Level Estimation for Slope Stability Analysis of a Coal Open Pit Mine
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1