TOWARDS AN EFFICIENT APPROACH FOR IDENTIFICATION AND SELECTION OF STAKEHOLDER ENGAGEMENT STRATEGIES: A CASE STUDY

IF 1.4 4区 经济学 Q3 ECONOMICS E & M Ekonomie a Management Pub Date : 2021-12-01 DOI:10.15240/tul/001/2021-4-004
M. Khalilzadeh, Omid Kebriyaii, Jonas Šaparauskas, N. Lepkova
{"title":"TOWARDS AN EFFICIENT APPROACH FOR IDENTIFICATION AND SELECTION OF STAKEHOLDER ENGAGEMENT STRATEGIES: A CASE STUDY","authors":"M. Khalilzadeh, Omid Kebriyaii, Jonas Šaparauskas, N. Lepkova","doi":"10.15240/tul/001/2021-4-004","DOIUrl":null,"url":null,"abstract":"The goals and objectives of a project as well as the needs, requirements and expectations of the project stakeholders may contradict or non-fulfillment of them may have different detrimental and negative consequences for the project. Therefore, project stakeholders should be effectively managed, but it is not possible to satisfy all project stakeholders and meet all of their expectations and requirements. As a result, project team must strike a balance between the project goals and objectives and the needs, requirements and expectations of the project stakeholders in order to complete the project successfully. Despite highlighting the significant importance of project stakeholder management, there exists a notable gap in exerting an effective decision support system to adopt stakeholder engagement strategies particularly in oil and gas construction projects. This study proposes a comprehensive framework for the identification, prioritization and selection of the stakeholder engagement strategies in one of the large size oil and gas construction projects in Iran. In this paper, a hybrid method which is the combination of the SWOT (strengths, weakness, opportunities and threat) analysis and fuzzy Delphi method is first exploited for identifying the appropriate stakeholder engagement strategies. Subsequently, fuzzy SWARA (Step-wise Weight Assessment Ratio Analysis) is employed to weight the crucial criteria, and finally, fuzzy WASPAS (Weighted Aggregated Sum Product Assessment) is utilized to prioritize the identified stakeholder engagement strategies. This research contributes to the body of knowledge on project stakeholder management by presenting a novel framework for identifying, ranking and selecting the suitable strategies for effective stakeholder engagement considering one of the largest oil and gas construction projects in the country. The value of this study is in applicability of the proposed methodology for project managers and practitioners in other oil and gas construction projects.","PeriodicalId":46351,"journal":{"name":"E & M Ekonomie a Management","volume":"48 1","pages":""},"PeriodicalIF":1.4000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"E & M Ekonomie a Management","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.15240/tul/001/2021-4-004","RegionNum":4,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ECONOMICS","Score":null,"Total":0}
引用次数: 3

Abstract

The goals and objectives of a project as well as the needs, requirements and expectations of the project stakeholders may contradict or non-fulfillment of them may have different detrimental and negative consequences for the project. Therefore, project stakeholders should be effectively managed, but it is not possible to satisfy all project stakeholders and meet all of their expectations and requirements. As a result, project team must strike a balance between the project goals and objectives and the needs, requirements and expectations of the project stakeholders in order to complete the project successfully. Despite highlighting the significant importance of project stakeholder management, there exists a notable gap in exerting an effective decision support system to adopt stakeholder engagement strategies particularly in oil and gas construction projects. This study proposes a comprehensive framework for the identification, prioritization and selection of the stakeholder engagement strategies in one of the large size oil and gas construction projects in Iran. In this paper, a hybrid method which is the combination of the SWOT (strengths, weakness, opportunities and threat) analysis and fuzzy Delphi method is first exploited for identifying the appropriate stakeholder engagement strategies. Subsequently, fuzzy SWARA (Step-wise Weight Assessment Ratio Analysis) is employed to weight the crucial criteria, and finally, fuzzy WASPAS (Weighted Aggregated Sum Product Assessment) is utilized to prioritize the identified stakeholder engagement strategies. This research contributes to the body of knowledge on project stakeholder management by presenting a novel framework for identifying, ranking and selecting the suitable strategies for effective stakeholder engagement considering one of the largest oil and gas construction projects in the country. The value of this study is in applicability of the proposed methodology for project managers and practitioners in other oil and gas construction projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一种识别和选择利益相关者参与策略的有效方法:一个案例研究
项目的目标和目的以及项目干系人的需要、要求和期望可能相互矛盾,或者它们的不实现可能对项目产生不同的有害和消极的后果。因此,要对项目干系人进行有效的管理,但不可能满足所有的项目干系人,满足他们所有的期望和需求。因此,为了成功地完成项目,项目团队必须在项目目标和项目干系人的需要、要求和期望之间取得平衡。尽管强调了项目利益相关者管理的重要性,但在发挥有效的决策支持系统以采用利益相关者参与策略方面存在显著差距,特别是在油气建设项目中。本研究提出了一个全面的框架,用于在伊朗的一个大型油气建设项目中识别、优先考虑和选择利益相关者参与策略。本文首先利用SWOT(优势、劣势、机会和威胁)分析与模糊德尔菲法相结合的混合方法,确定合适的利益相关者参与策略。随后,采用模糊逐步加权评价比率分析法(Step-wise Weight Assessment Ratio Analysis, SWARA)对关键标准进行加权,最后,采用模糊加权总和产品评价法(Weighted Aggregated Sum Product Assessment, WASPAS)对确定的利益相关者参与策略进行优先级排序。考虑到该国最大的石油和天然气建设项目之一,本研究提出了一个新的框架,用于识别、排序和选择有效的利益相关者参与策略,从而为项目利益相关者管理的知识体系做出了贡献。本研究的价值在于所提出的方法对其他油气建设项目的项目经理和从业人员的适用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.70
自引率
13.30%
发文量
35
期刊最新文献
Discovering the mindsets of the luxury recycling phenomenon The importance of Industry 4.0 technologies when selecting an ERP system – An empirical study Has COVID-19 affected the organisational culture of non-governmental organisations? Applying an integrated data-driven weighting system – CoCoSo approach for financial performance evaluation of Fortune 500 companies Is banking and finance education producing sector-relevant personnel? Stakeholders’ psychological perceptions toward employment
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1