{"title":"Efficient utilization of solar PV for corporate building in Riyadh, Saudi Arabia","authors":"Fahad Saeed Alharthi, A. Alamoud","doi":"10.24084/repqj21.232","DOIUrl":null,"url":null,"abstract":"This paper presents a case study for rooftop PV system mounted on corporate building of Saudi Electricity Company (SEC) HQ with a capacity of 277KWp. By collecting the generation data of the PV system along with the electrical loads of the building for the year 2021, the data showed that the amount of energy produced from the system, which was directly fed to the loads is about 404.8 MWh. Accordingly, the contribution rate of the PV system generation to energy consumption was calculated to be about 15.7% of the loads of the entire building, which totaled about 2547.8 MWh. The study showed that there is an excess of electrical energy produced from these solar panels. The system is programmed through the inverter to keep the production of solar panels equal or less than the electrical loads which is connected to due to the absence of the regulation for connecting PV systems with the electric grid at that time. The excess energy of PV generation was calculated as 478.5 MWh. Hence, the surplus energy is 69.1 MWh representing approximately 15% of the calculated PV generation. The study covered the economic perspective for the system by estimating the levelized cost of energy and payback period to be LCOE= 0.33 SR/kWh = 0.088 USD/kWh and Payback period= 23.9 years respectively.","PeriodicalId":21076,"journal":{"name":"Renewable Energy and Power Quality Journal","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Renewable Energy and Power Quality Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24084/repqj21.232","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Energy","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents a case study for rooftop PV system mounted on corporate building of Saudi Electricity Company (SEC) HQ with a capacity of 277KWp. By collecting the generation data of the PV system along with the electrical loads of the building for the year 2021, the data showed that the amount of energy produced from the system, which was directly fed to the loads is about 404.8 MWh. Accordingly, the contribution rate of the PV system generation to energy consumption was calculated to be about 15.7% of the loads of the entire building, which totaled about 2547.8 MWh. The study showed that there is an excess of electrical energy produced from these solar panels. The system is programmed through the inverter to keep the production of solar panels equal or less than the electrical loads which is connected to due to the absence of the regulation for connecting PV systems with the electric grid at that time. The excess energy of PV generation was calculated as 478.5 MWh. Hence, the surplus energy is 69.1 MWh representing approximately 15% of the calculated PV generation. The study covered the economic perspective for the system by estimating the levelized cost of energy and payback period to be LCOE= 0.33 SR/kWh = 0.088 USD/kWh and Payback period= 23.9 years respectively.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
沙特阿拉伯利雅得企业建筑太阳能光伏的高效利用
本文介绍了沙特电力公司(SEC)总部办公楼屋顶光伏系统的案例研究,该系统容量为277KWp。通过收集2021年光伏系统的发电数据以及建筑物的电力负荷,数据显示,该系统产生的直接馈送给负荷的能量约为404.8兆瓦时。据此计算,光伏发电对能耗的贡献率约为整个建筑负荷的15.7%,总计约为2547.8 MWh。研究表明,这些太阳能电池板产生的电能过剩。该系统通过逆变器进行编程,以保持太阳能电池板的产量等于或小于所连接的电力负荷,因为当时没有将光伏系统与电网连接的规定。光伏发电的剩余能量计算为478.5 MWh。因此,剩余能量为69.1兆瓦时,约占计算光伏发电量的15%。本研究从经济角度对该系统进行了分析,预计该系统的平准化能源成本和投资回收期分别为LCOE= 0.33 SR/kWh = 0.088 USD/kWh,投资回收期为23.9年。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Renewable Energy and Power Quality Journal
Renewable Energy and Power Quality Journal Energy-Energy Engineering and Power Technology
CiteScore
0.70
自引率
0.00%
发文量
147
期刊最新文献
Experimental set-up to study power quality in single-phase split-phase distribution systems Analysis of Synthetic Inertia Applied to Wind Farms Cosine Windows in Interpolated DFT-based Method for an Accurate High-Frequency Distortion Assessment in Power Systems Thermal and electrical performance prediction of an FSPV system: a case study in the Douro/Portugal climatic conditions I-V Characteristics Measuring System for PV Generator based on PDM Inverter
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1