An effective heuristic for stockyard planning and machinery scheduling at a coal handling facility

Samer Hanoun, Burhan Khan, Michael Johnstone, S. Nahavandi, D. Creighton
{"title":"An effective heuristic for stockyard planning and machinery scheduling at a coal handling facility","authors":"Samer Hanoun, Burhan Khan, Michael Johnstone, S. Nahavandi, D. Creighton","doi":"10.1109/INDIN.2013.6622883","DOIUrl":null,"url":null,"abstract":"Coal handling is a complex process involving different correlated and highly dependent operations such as selecting appropriate product types, planning stockpiles, scheduling stacking and reclaiming activities and managing train loads. Planning these operations manually is time consuming and can result in non-optimized schedules as future impact of decisions may not be appropriately considered. This paper addresses the operational scheduling of the continuous coal handling problem with multiple conflicting objectives. As the problem is NP-hard in nature, an effective heuristic is presented for planning stockpiles and scheduling resources to minimize delays in production and the coal age in the stockyard. A model of stockyard operations within a coal mine is described and the problem is formulated as a Bi-Objective Optimization Problem (BOOP). The algorithm efficacy is demonstrated on different real-life data scenarios. Computational results show that the solution algorithm is effective and the coal throughput is substantially impacted by the conflicting objectives. Together, the model and the proposed heuristic, can act as a decision support system for the stockyard planner to explore the effects of alternative decisions, such as balancing age and volume of stockpiles, and minimizing conflicts due to stacker and reclaimer movements.","PeriodicalId":6312,"journal":{"name":"2013 11th IEEE International Conference on Industrial Informatics (INDIN)","volume":"84 1","pages":"206-211"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"18","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 11th IEEE International Conference on Industrial Informatics (INDIN)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INDIN.2013.6622883","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 18

Abstract

Coal handling is a complex process involving different correlated and highly dependent operations such as selecting appropriate product types, planning stockpiles, scheduling stacking and reclaiming activities and managing train loads. Planning these operations manually is time consuming and can result in non-optimized schedules as future impact of decisions may not be appropriately considered. This paper addresses the operational scheduling of the continuous coal handling problem with multiple conflicting objectives. As the problem is NP-hard in nature, an effective heuristic is presented for planning stockpiles and scheduling resources to minimize delays in production and the coal age in the stockyard. A model of stockyard operations within a coal mine is described and the problem is formulated as a Bi-Objective Optimization Problem (BOOP). The algorithm efficacy is demonstrated on different real-life data scenarios. Computational results show that the solution algorithm is effective and the coal throughput is substantially impacted by the conflicting objectives. Together, the model and the proposed heuristic, can act as a decision support system for the stockyard planner to explore the effects of alternative decisions, such as balancing age and volume of stockpiles, and minimizing conflicts due to stacker and reclaimer movements.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
煤炭装卸设备堆场规划和机械调度的有效启发式算法
煤炭处理是一个复杂的过程,涉及不同的相关和高度依赖的操作,如选择适当的产品类型,计划库存,安排堆垛和回收活动以及管理火车负载。手动规划这些操作非常耗时,并且可能导致未优化的计划,因为可能没有适当考虑决策的未来影响。研究了多目标冲突的连续输煤作业调度问题。由于问题本质上是np困难的,提出了一种有效的启发式方法来规划库存和调度资源,以最大限度地减少生产延迟和库存中的煤龄。描述了一个煤矿堆场作业模型,并将其表述为一个双目标优化问题。在不同的实际数据场景中验证了算法的有效性。计算结果表明,求解算法是有效的,目标冲突对煤的吞吐量有较大影响。同时,该模型和提出的启发式方法可以作为一个决策支持系统,为库存计划者探索替代决策的影响,如平衡库存的年龄和数量,以及最小化由于堆垛机和取料机运动引起的冲突。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assessment of IEC-61499 and CDL for Function Block composition in factory-wide system integration Roll stabilization: A higher order sliding mode approach Analysis and prediction of jitter of internet one-way time-delay for teleoperation systems Remote rendering of industrial HMI applications An intelligent SA-adaptive interface to aid supervisory control of a UAV swarm
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1