Applications of Surveying and Geoinformatics for Planning New Routes to Solve Traffic Congestion in part of Minna Metropolis (Kpakungu, a case study)

I. Onuigbo, T. Adewuyi, J. Odumosu, G. A. Oluibukun
{"title":"Applications of Surveying and Geoinformatics for Planning New Routes to Solve Traffic Congestion in part of Minna Metropolis (Kpakungu, a case study)","authors":"I. Onuigbo, T. Adewuyi, J. Odumosu, G. A. Oluibukun","doi":"10.36263/nijest.2019.01.0105","DOIUrl":null,"url":null,"abstract":"The volume of traffic generated by land-use pattern varies during different periods of the day but there is usually a predictable pattern of such traffic volumes. Most often, the structure of urban land-use fails to provide easy and convenient traffic movement, which in the case of the study area is usually that of vehicles and pedestrian traffic. The fact is that Minna is presently experiencing rapid urban growth. Both the authorities and citizens seem to simply ignore this and its impact on human existence. The research is based on Road Traffic Network Analysis in Minna, to develop a road network map and determine the causes of Traffic Congestion in Kpakungu specifically. Quickbird satellite imagery was used in analyzing and mapping out the existing road network within the study area. Field survey aspects involving measuring of roads, traffic count, coordinates captured were also undertaken. It was discovered that the causes of the traffic pressure in the study area was as a result of the relocation of Federal University of Technology, Minna to its permanent site in Gidan Kwanu and the relocation of National Examination Council(NECO) Headquarter. Majority of the traffic pressure in the area were as a result of vehicles coming from Maikunkele, Bosso, Maitumbi, Minna central, Dutsen Kura, Chanchaga, Tunga, Sahuka-kahuta and BarikinSale going to Bida, Gidan-Kwanu or NECO office. It was concluded that alternative roads should be provided for vehicle diversion to limit the congestion of traffic on the road.","PeriodicalId":11031,"journal":{"name":"Day 4 Thu, March 21, 2019","volume":"50 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, March 21, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36263/nijest.2019.01.0105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The volume of traffic generated by land-use pattern varies during different periods of the day but there is usually a predictable pattern of such traffic volumes. Most often, the structure of urban land-use fails to provide easy and convenient traffic movement, which in the case of the study area is usually that of vehicles and pedestrian traffic. The fact is that Minna is presently experiencing rapid urban growth. Both the authorities and citizens seem to simply ignore this and its impact on human existence. The research is based on Road Traffic Network Analysis in Minna, to develop a road network map and determine the causes of Traffic Congestion in Kpakungu specifically. Quickbird satellite imagery was used in analyzing and mapping out the existing road network within the study area. Field survey aspects involving measuring of roads, traffic count, coordinates captured were also undertaken. It was discovered that the causes of the traffic pressure in the study area was as a result of the relocation of Federal University of Technology, Minna to its permanent site in Gidan Kwanu and the relocation of National Examination Council(NECO) Headquarter. Majority of the traffic pressure in the area were as a result of vehicles coming from Maikunkele, Bosso, Maitumbi, Minna central, Dutsen Kura, Chanchaga, Tunga, Sahuka-kahuta and BarikinSale going to Bida, Gidan-Kwanu or NECO office. It was concluded that alternative roads should be provided for vehicle diversion to limit the congestion of traffic on the road.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
测量与地理信息学在米纳市部分城区交通拥堵新路线规划中的应用(以Kpakungu为例)
土地用途模式所产生的交通量在一天的不同时段有所不同,但这些交通量通常有一个可预测的模式。大多数情况下,城市土地利用结构不能提供便捷的交通活动,研究区域的交通活动通常是车辆和行人交通。事实上,米纳目前正经历着快速的城市发展。当局和市民似乎都完全忽视了这一点及其对人类生存的影响。本研究以Minna的道路交通网络分析为基础,制定道路网络地图,并具体确定Kpakungu交通拥堵的原因。利用Quickbird卫星图像对研究区内现有的道路网络进行了分析和绘制。还进行了实地调查,包括测量道路、交通量、所获坐标。调查发现,造成研究地区交通压力的原因是米纳联邦工业大学搬迁到其设在基丹瓜努的永久校址和国家考试委员会总部的搬迁。该地区的交通压力主要是由于来自迈昆克莱、博索、迈通比、明纳中部、杜森库拉、昌查加、通加、萨胡卡-卡胡塔和巴里金塞尔的车辆前往比达、吉丹-克瓦努或NECO办事处。结论是应辟设其他道路供车辆分流,以限制道路上的交通挤塞。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Size distribution analysis of microstickies treated by enzyme mixtures in papermaking whitewater Evaluating hardness and the S-test Controllable anisotropic properties of wet-laid hydroentangled nonwovens A study of the softness of household tissues using a tissue softness analyzer and hand-felt panels A REVIEW OF MULTI HOMING AND ITS ASSOCIATED RESEARCH AREAS ALONG WITH INTERNET OF THINGS (IOT)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1