Integrated Reserves Management Using Portfolio Approach: A Case Study

M. Al-Bahar, A. Al-Sane, A. Bora, A. Kumar, A. Mendjoge, P. Dhote, Y. Antonevich, M. Back, A. Kassim, David Mason, M. U. Sethi, E. Siddique
{"title":"Integrated Reserves Management Using Portfolio Approach: A Case Study","authors":"M. Al-Bahar, A. Al-Sane, A. Bora, A. Kumar, A. Mendjoge, P. Dhote, Y. Antonevich, M. Back, A. Kassim, David Mason, M. U. Sethi, E. Siddique","doi":"10.2118/194669-MS","DOIUrl":null,"url":null,"abstract":"\n Management of oil and gas resources and reserves has always been complex process as the company’s portfolio consists of resource and reserves volumes with varying degrees of uncertainty and maturity levels of projects. Some of the hydrocarbon volumes are from resources that are highly uncertain and require technology imprevoments or breakthroughs. However, for strategy formulation of the country/company needs consideration of all hydrocarbon volumes that can generate value in the future. The prioritization of development strategies for its reservoirs based on rigorous technical and economic assessments while protecting the national interests is a challenging task.\n Kuwait Oil Company (KOC) has been using multiple systems for both asset and business planning processes that is not optimized for faster turnaround. The proposed integrated and automated reserves management solution provided a structured environment for systematic economic evaluation and portfolio optimization. It facilitates the visualization of key reservoir parameters delivering full understanding of the forecasted reserves, production and economic potential of the entire company. It indentifies gaps between reserves and detailed development plans based on technical and commercial criteria. By Optimizing the project timing and economics results in reduction of budgetary expences, increase in portfolio revenue and greater confidence for the company. Ranking the investment opportunities helps in allocating resources appropriately amongst different projects in a systemic manner to ensure profitability of the company. This approach provides ease to KOC in modeling complex scenarios and quickly evaluate a wide range of different development strategies catering for risk and uncertainty\n This paper describes current industry challenges in resource and reservoir management, and an integrated approach to reserves, economics and portfolio management envisioned for Kuwait Oil Company (KOC) which will assist in identifying optimal reservoir development options to meet any defined strategic goals. The results and benefits gained after deployment of pilot will also be explained in the paper. This integrated approach for optimization of Asset Action Plans is a unique solution and would prove beneficial for our industry.","PeriodicalId":11150,"journal":{"name":"Day 2 Wed, April 10, 2019","volume":"16 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, April 10, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/194669-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Management of oil and gas resources and reserves has always been complex process as the company’s portfolio consists of resource and reserves volumes with varying degrees of uncertainty and maturity levels of projects. Some of the hydrocarbon volumes are from resources that are highly uncertain and require technology imprevoments or breakthroughs. However, for strategy formulation of the country/company needs consideration of all hydrocarbon volumes that can generate value in the future. The prioritization of development strategies for its reservoirs based on rigorous technical and economic assessments while protecting the national interests is a challenging task. Kuwait Oil Company (KOC) has been using multiple systems for both asset and business planning processes that is not optimized for faster turnaround. The proposed integrated and automated reserves management solution provided a structured environment for systematic economic evaluation and portfolio optimization. It facilitates the visualization of key reservoir parameters delivering full understanding of the forecasted reserves, production and economic potential of the entire company. It indentifies gaps between reserves and detailed development plans based on technical and commercial criteria. By Optimizing the project timing and economics results in reduction of budgetary expences, increase in portfolio revenue and greater confidence for the company. Ranking the investment opportunities helps in allocating resources appropriately amongst different projects in a systemic manner to ensure profitability of the company. This approach provides ease to KOC in modeling complex scenarios and quickly evaluate a wide range of different development strategies catering for risk and uncertainty This paper describes current industry challenges in resource and reservoir management, and an integrated approach to reserves, economics and portfolio management envisioned for Kuwait Oil Company (KOC) which will assist in identifying optimal reservoir development options to meet any defined strategic goals. The results and benefits gained after deployment of pilot will also be explained in the paper. This integrated approach for optimization of Asset Action Plans is a unique solution and would prove beneficial for our industry.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
运用投资组合方法进行综合储备管理:一个案例研究
油气资源和储量的管理一直是一个复杂的过程,因为公司的投资组合包括不同程度的不确定性和项目成熟度的资源和储量。一些油气储量来自高度不确定的资源,需要技术改进或突破。然而,对于国家/公司的战略制定,需要考虑未来可能产生价值的所有碳氢化合物产量。在严格的技术经济评估的基础上,在保护国家利益的前提下,确定水库开发战略的优先顺序,是一项具有挑战性的任务。科威特石油公司(KOC)一直在使用多种系统进行资产和业务规划流程,但这些系统并未优化周转速度。提出的综合自动化储量管理方案为系统经济评价和投资组合优化提供了结构化环境。它有助于实现关键油藏参数的可视化,从而全面了解整个公司的预测储量、产量和经济潜力。它根据技术和商业标准确定储量与详细开发计划之间的差距。通过优化项目时间和经济性,可以减少预算支出,增加投资组合收入,增强公司的信心。对投资机会进行排序有助于系统地在不同的项目中适当地分配资源,以确保公司的盈利能力。本文描述了当前行业在资源和油藏管理方面面临的挑战,以及为科威特石油公司(KOC)设想的储量、经济和投资组合管理的综合方法,该方法将有助于确定最佳油藏开发方案,以满足任何既定的战略目标。本文还将说明试点部署后所取得的成果和效益。这种优化资产行动计划的综合方法是一种独特的解决方案,将对我们的行业有益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Exploring the Capability of Temperature-Only Analysis for Zonal Flow Quantification Field Operations Strategy for Installing Beam Pumping Units at 660 Wells in Just six Months Application of Radial Jet Drilling Technique with Gyro System to Enhance Reservoir Potential in Mature Sand Stone Reservoir in Assam-Arakan Basin Candidate Selection to Execution: A Detailed Case Study A Case Study on Treating Oil Contaminants and Heavy Metal of Produced Water Through Phytoremediation Using Reed Bed Technology: A Success Story of 15 Years Operation of Heglig Oil Field of Sudan Prevent Fouling and Corrosion During Mill-Out Operations: Case Studies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1