{"title":"Construction of transient voltage UWB on-line monitoring system in UHV GIL based on capacitive voltage division","authors":"Jiao Chunlei, Ding Deng-wei, L. Weidong, He Liang, Zhang Ziwei, Yu Minghu","doi":"10.1109/ICHVE49031.2020.9279507","DOIUrl":null,"url":null,"abstract":"The transient voltage process in UHV transmission system has a great influence on the insulation state of Gil equipment. Therefore, in order to monitor the transient voltage process suffered by the UHV GIL during its operation in real time, this paper constructs a transient voltage ultrawideband (UWB) online monitoring system based on capacitive voltage division, which is actual applied in 1100kV Sutong GIL utility tunnel project. The system included voltage sensor, monitoring terminal and storage and control unit. Capacitance sensing transformation is carried out on the cover plate of the GIL. Signal conversion and acquisition are implemented locally at the monitoring terminal, and uploaded to the upper storage control unit through optical fiber. The effective measurement bandwidth of the monitoring system ranges from 2.1Hz to 230MHz, the sampling rate is 250 MS/s, and the analog bandwidth is 100MHz. The abrupt voltage waveform can be accurately captured by customized steep trigger mode, and the recording time is not less than 100 ms. During withstand voltage test of the GIL, the transient voltage process caused by internal insulation breakdown is recorded successfully and accurately. The transient voltage duration is about 400us, the first abrupt change of voltage is about 120ns, and the instantaneous frequency excited by the abrupt change is close to 35MHz. Through in-depth analysis of transient voltage waveform, it is helpful to research the process of fault occurrence, identify the type of fault, and locate the breakdown location quickly and accurately, which provides strong support for the maintenance of UHV GIL.","PeriodicalId":6763,"journal":{"name":"2020 IEEE International Conference on High Voltage Engineering and Application (ICHVE)","volume":"166 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE International Conference on High Voltage Engineering and Application (ICHVE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHVE49031.2020.9279507","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The transient voltage process in UHV transmission system has a great influence on the insulation state of Gil equipment. Therefore, in order to monitor the transient voltage process suffered by the UHV GIL during its operation in real time, this paper constructs a transient voltage ultrawideband (UWB) online monitoring system based on capacitive voltage division, which is actual applied in 1100kV Sutong GIL utility tunnel project. The system included voltage sensor, monitoring terminal and storage and control unit. Capacitance sensing transformation is carried out on the cover plate of the GIL. Signal conversion and acquisition are implemented locally at the monitoring terminal, and uploaded to the upper storage control unit through optical fiber. The effective measurement bandwidth of the monitoring system ranges from 2.1Hz to 230MHz, the sampling rate is 250 MS/s, and the analog bandwidth is 100MHz. The abrupt voltage waveform can be accurately captured by customized steep trigger mode, and the recording time is not less than 100 ms. During withstand voltage test of the GIL, the transient voltage process caused by internal insulation breakdown is recorded successfully and accurately. The transient voltage duration is about 400us, the first abrupt change of voltage is about 120ns, and the instantaneous frequency excited by the abrupt change is close to 35MHz. Through in-depth analysis of transient voltage waveform, it is helpful to research the process of fault occurrence, identify the type of fault, and locate the breakdown location quickly and accurately, which provides strong support for the maintenance of UHV GIL.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于容性分压的特高压GIL暂态电压超宽带在线监测系统的构建
特高压输电系统中的暂态电压过程对Gil设备的绝缘状态有很大的影响。因此,为了实时监测特高压隧道运行过程中瞬时电压过程,本文构建了基于电容分压的瞬态电压超宽带在线监测系统,并在1100kV苏通隧道工程中实际应用。该系统包括电压传感器、监控终端和存储控制单元。在GIL的盖板上进行电容传感变换。信号的转换和采集在监控终端本地完成,并通过光纤上传到上层存储控制单元。监控系统的有效测量带宽范围为2.1Hz ~ 230MHz,采样速率为250ms /s,模拟带宽为100MHz。通过定制的陡触发方式,可以准确捕获电压突变波形,记录时间不小于100ms。在GIL耐压试验中,成功准确地记录了内部绝缘击穿引起的瞬态电压过程。瞬态电压持续时间约为400us,电压第一次突变约为120ns,突变激发的瞬时频率接近35MHz。通过对暂态电压波形的深入分析,有助于研究故障发生过程,识别故障类型,快速准确地定位击穿位置,为特高压GIL维护提供有力支持。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Excellent electrical properties of zinc-oxide varistors by tailoring sintering process for optimizing line-arrester configuration Research of Short Air Gap Flashover Characteristic with Water Droplets Pattern Recognition of Development Stage of Creepage Discharge of Oil-Paper Insulation under AC-DC Combined Voltage based on OS-ELM Study on the PD Creeping Discharge Development Process Induced by Metallic Particles in GIS A Novel Fabry-Perot Sensor Mounted on External Surface of Transformers for Partial Discharge Detection
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1