Adeel Ahmad, Muhammad Sajid, Zeeshan Khan, M. Iqbal
{"title":"Influence of Construction Project Performance Indicators on Project Success Moderating Role of Pandemic Covid-19 and Project Evaluation Management","authors":"Adeel Ahmad, Muhammad Sajid, Zeeshan Khan, M. Iqbal","doi":"10.26710/jbsee.v8i1.2189","DOIUrl":null,"url":null,"abstract":"Purpose: The main objective of this study is to identify moderating effect of pandemic covid-19 and project evaluation management between construction project performance indicators and projects success. Construction Project performance indicators were found to have a significant influence on Project Success along with the moderating role of Pandemic Covid-19 and Project Evaluation Management \nDesign/Methodology/Approach: \nA quantitative research strategy is used to collect primary data from the 250 project managers working in construction firms in Pakistan. A questionnaire survey is used to collect data and the collected data is analyzed by performing tests of reliability, validity, correlation, and multiple regression analysis in SPSS software, and the moderation effect is studied by using Hayes Process Macro. \nFindings: The study concluded that communication factors, Supply chain factors, and Human Resource factors have a significant effect on the success of the project. When these three construction Project Performance Indicators are moderated with Pandemic Covid-19 and Project Evaluation Management show significant results, The results conclude that both moderators significantly moderate the effect of Human Resource Factors, Supply Chain Factors, and Communication Factors on Project Success. \nImplications/Originality/Value: The findings of this study will be helpful for the practitioners to minimize the effect of Pandemic covid-19 by adopting proper project management techniques. ","PeriodicalId":53047,"journal":{"name":"Journal of Business and Social Review in Emerging Economies","volume":"18 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Business and Social Review in Emerging Economies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26710/jbsee.v8i1.2189","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Purpose: The main objective of this study is to identify moderating effect of pandemic covid-19 and project evaluation management between construction project performance indicators and projects success. Construction Project performance indicators were found to have a significant influence on Project Success along with the moderating role of Pandemic Covid-19 and Project Evaluation Management
Design/Methodology/Approach:
A quantitative research strategy is used to collect primary data from the 250 project managers working in construction firms in Pakistan. A questionnaire survey is used to collect data and the collected data is analyzed by performing tests of reliability, validity, correlation, and multiple regression analysis in SPSS software, and the moderation effect is studied by using Hayes Process Macro.
Findings: The study concluded that communication factors, Supply chain factors, and Human Resource factors have a significant effect on the success of the project. When these three construction Project Performance Indicators are moderated with Pandemic Covid-19 and Project Evaluation Management show significant results, The results conclude that both moderators significantly moderate the effect of Human Resource Factors, Supply Chain Factors, and Communication Factors on Project Success.
Implications/Originality/Value: The findings of this study will be helpful for the practitioners to minimize the effect of Pandemic covid-19 by adopting proper project management techniques.
目的:本研究的主要目的是确定大流行covid-19和项目评估管理在建设项目绩效指标与项目成功之间的调节作用。发现建筑项目绩效指标对项目成功具有重大影响,同时Covid-19大流行和项目评估管理设计/方法/方法也具有调节作用。项目评估管理设计/方法/方法:采用定量研究策略从巴基斯坦建筑公司的250名项目经理那里收集主要数据。采用问卷调查法收集数据,在SPSS软件中对收集到的数据进行信度、效度、相关检验和多元回归分析,并使用Hayes Process Macro研究调节效应。研究发现:沟通因素、供应链因素和人力资源因素对项目的成功有显著影响。当这三个项目绩效指标被大流行疫情和项目评估管理调节时,结果表明,这两个调节因子都显著调节了人力资源因素、供应链因素和沟通因素对项目成功的影响。含义/原创性/价值:本研究的发现将有助于从业者通过采用适当的项目管理技术来最大限度地减少covid-19大流行的影响。