Resettlement Caused by Jatigede Dam Project -Consequence of Long Delayed Implementation of a Project

Q3 Social Sciences Journal of Comparative Asian Development Pub Date : 2019-02-28 DOI:10.5296/JAD.V5I1.14422
O. Suwartapradja, R. Fujikura, S. Sunardi, FU Regina Hoi Yee
{"title":"Resettlement Caused by Jatigede Dam Project -Consequence of Long Delayed Implementation of a Project","authors":"O. Suwartapradja, R. Fujikura, S. Sunardi, FU Regina Hoi Yee","doi":"10.5296/JAD.V5I1.14422","DOIUrl":null,"url":null,"abstract":"Jatigede dam was constructed in Sumedang Regency of West Java Province, Indonesia. It was planned as early as the 1960s. The World Bank cancelled its financing for the reason of insufficient resettlement planning in 1986, but land acquisition for the dam continued and cash compensation was provided to affected villagers. In spite of the suspension of land acquisition in 1997, the Chinese Government became the new sponsor and dam construction started in 2005. Inundation began in 2015 and the villagers were resettled mainly to the vicinity of the reservoir. The construction was completed in 2015. Most of the cash compensation was provided during the mid-1980s. As three decades have passed since the provision of the compensation, resettlers who received the money conceived that the dam construction project has been cancelled. They spent the money at their original place and did not invest for the resettlement. Today, most of the resettlers are jobless and poor. Their incomes are below the international poverty line. Aquaculture at the reservoir is one of the possible options to improve local economy, but the local government prohibits it to avoid deterioration of water quality.","PeriodicalId":53585,"journal":{"name":"Journal of Comparative Asian Development","volume":"7 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Comparative Asian Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5296/JAD.V5I1.14422","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 2

Abstract

Jatigede dam was constructed in Sumedang Regency of West Java Province, Indonesia. It was planned as early as the 1960s. The World Bank cancelled its financing for the reason of insufficient resettlement planning in 1986, but land acquisition for the dam continued and cash compensation was provided to affected villagers. In spite of the suspension of land acquisition in 1997, the Chinese Government became the new sponsor and dam construction started in 2005. Inundation began in 2015 and the villagers were resettled mainly to the vicinity of the reservoir. The construction was completed in 2015. Most of the cash compensation was provided during the mid-1980s. As three decades have passed since the provision of the compensation, resettlers who received the money conceived that the dam construction project has been cancelled. They spent the money at their original place and did not invest for the resettlement. Today, most of the resettlers are jobless and poor. Their incomes are below the international poverty line. Aquaculture at the reservoir is one of the possible options to improve local economy, but the local government prohibits it to avoid deterioration of water quality.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
贾蒂格德大坝工程引起的移民问题——工程长期拖延实施的后果
Jatigede大坝位于印度尼西亚西爪哇省Sumedang县。早在20世纪60年代就计划好了。1986年,世界银行以重新安置规划不足为由取消了贷款,但继续为大坝征地,并向受影响的村民提供现金补偿。尽管1997年停止征地,但中国政府成为新的发起人,2005年开始建设大坝。洪水从2015年开始泛滥,村民们主要被重新安置到水库附近。该建筑于2015年完工。大部分现金补偿是在1980年代中期提供的。在补偿金发放30年之后,收到补偿金的移民们以为大坝工程已经被取消了。他们把钱花在了原来的地方,没有为重新安置投资。今天,大多数重新安置的人都失业和贫穷。他们的收入低于国际贫困线。水库养殖是改善当地经济的可能选择之一,但当地政府为避免水质恶化而禁止养殖。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Journal of Comparative Asian Development
Journal of Comparative Asian Development Social Sciences-Political Science and International Relations
CiteScore
1.30
自引率
0.00%
发文量
2
期刊介绍: The Journal of Comparative Asian Development (JCAD) aims to offer the most up-to-date research, analyses, and findings on the many aspects of social, economic, and political development in contemporary Asia conducted by scholars and experts from Asia and around the world.
期刊最新文献
Advancing Muslim Modest Fashion Clothing Theoretical Discussions on China’s Rise in the Era of Globalization Movement Control Order (MCO) - A Viable Legal Mechanism in the Management of COVID-19 Pandemic in Malaysia? The Relationship of Foreign Direct Investment and Unemployment Rate in the Philippines Factors Driving Foreign Direct Investment: An Empirical Investigation Using Multiple Regression
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1