{"title":"Change impact analysis of complex product using an improved three-parameter interval grey relation model","authors":"W. Yang, C. D. Li, Y. H. Chen, Y. Yu","doi":"10.14743/apem2021.2.393","DOIUrl":null,"url":null,"abstract":"Change impact evaluation of complex product plays an important role in controlling change cost and improving change efficiency of engineering change enterprises. In order to improve the accuracy of engineering change impact evaluation, this paper introduces three-parameter interval grey number to evaluate complex products according to the data characteristics. The linear combination of BWM and Gini coefficient method is used to improve the three-parameter interval grey number correlation model. It is applied to the impact evaluation of complex product engineering change. This paper firstly constructs a multi-stage complex network for complex product engineering change. Then the engineering change impact evaluation index system is determined. Finally, a case analysis was carried out with the permanent magnet synchronous centrifugal compressor in a large permanent magnet synchronous centrifugal unit to verify the effectiveness of the proposed method.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":"17 1","pages":""},"PeriodicalIF":2.8000,"publicationDate":"2021-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Production Engineering & Management","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.14743/apem2021.2.393","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MANUFACTURING","Score":null,"Total":0}
引用次数: 1
Abstract
Change impact evaluation of complex product plays an important role in controlling change cost and improving change efficiency of engineering change enterprises. In order to improve the accuracy of engineering change impact evaluation, this paper introduces three-parameter interval grey number to evaluate complex products according to the data characteristics. The linear combination of BWM and Gini coefficient method is used to improve the three-parameter interval grey number correlation model. It is applied to the impact evaluation of complex product engineering change. This paper firstly constructs a multi-stage complex network for complex product engineering change. Then the engineering change impact evaluation index system is determined. Finally, a case analysis was carried out with the permanent magnet synchronous centrifugal compressor in a large permanent magnet synchronous centrifugal unit to verify the effectiveness of the proposed method.
期刊介绍:
Advances in Production Engineering & Management (APEM journal) is an interdisciplinary international academic journal published quarterly. The main goal of the APEM journal is to present original, high quality, theoretical and application-oriented research developments in all areas of production engineering and production management to a broad audience of academics and practitioners. In order to bridge the gap between theory and practice, applications based on advanced theory and case studies are particularly welcome. For theoretical papers, their originality and research contributions are the main factors in the evaluation process. General approaches, formalisms, algorithms or techniques should be illustrated with significant applications that demonstrate their applicability to real-world problems. Please note the APEM journal is not intended especially for studying problems in the finance, economics, business, and bank sectors even though the methodology in the paper is quality/project management oriented. Therefore, the papers should include a substantial level of engineering issues in the field of manufacturing engineering.