Political Commitment, Institutional Capacity and Urban Transport Governance Reform in Addis Ababa, Ethiopia

Yilak A Kebede
{"title":"Political Commitment, Institutional Capacity and Urban Transport Governance Reform in Addis Ababa, Ethiopia","authors":"Yilak A Kebede","doi":"10.17577/IJERTV10IS010258","DOIUrl":null,"url":null,"abstract":":- Following rapid urbanization, Ethiopia’s capital city Addis Ababa has become circumscribed by a complex set of multi-pronged transport challenges that are a greatly contributing to its overall urban inefficiency. A lack of political commitment and weak institutional capacity among transportation sector leadership exacerbates this urban predicament. In these contexts, this paper examines the efficiency of the 2012 transport sector reform package initiated by Addis Ababa City Administration under mayor Diriba Kuma. Through this research, the roles played by (a lack of) political commitment and institutional capacity in the design, management and implementation the urban reform agenda are closely examined. To do so, the paper utilizes a Public Sector Governance (PSG) reform framework to analyze the interplay between political commitment to reform and institutional capacity to implement agreed reforms. In particular, the paper highlights the outcome of reforms in circumstances in which there is substantial political commitment but low institutional capacity. In this regard, to achieve better public policy outcomes the study identifes the need for dismantling unnecessary bureaucratic procedures as well as addressing inefficiencies in governing structures, coupled with revisiting and improving existing norms, rules and regulations in transport governance. a policy reform plan focused on five pillars which aimed to narrow the gap between policy and implementation; a) development of strategic plans and standards that sustainably augment the current and future transport challenges of the City; b) institutional capacity building; c) project coordination and integration among different stakeholders and within the bureau; d) creating a system of sustainable operation of transport systems and services of the City; e) infrastructure development. The necessity of the reform was also to address some complex political and social contests including corruption, patronage, and political capture according to the General Manager of AARTB (reference?).","PeriodicalId":13986,"journal":{"name":"International Journal of Engineering Research and","volume":"54 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Research and","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17577/IJERTV10IS010258","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

:- Following rapid urbanization, Ethiopia’s capital city Addis Ababa has become circumscribed by a complex set of multi-pronged transport challenges that are a greatly contributing to its overall urban inefficiency. A lack of political commitment and weak institutional capacity among transportation sector leadership exacerbates this urban predicament. In these contexts, this paper examines the efficiency of the 2012 transport sector reform package initiated by Addis Ababa City Administration under mayor Diriba Kuma. Through this research, the roles played by (a lack of) political commitment and institutional capacity in the design, management and implementation the urban reform agenda are closely examined. To do so, the paper utilizes a Public Sector Governance (PSG) reform framework to analyze the interplay between political commitment to reform and institutional capacity to implement agreed reforms. In particular, the paper highlights the outcome of reforms in circumstances in which there is substantial political commitment but low institutional capacity. In this regard, to achieve better public policy outcomes the study identifes the need for dismantling unnecessary bureaucratic procedures as well as addressing inefficiencies in governing structures, coupled with revisiting and improving existing norms, rules and regulations in transport governance. a policy reform plan focused on five pillars which aimed to narrow the gap between policy and implementation; a) development of strategic plans and standards that sustainably augment the current and future transport challenges of the City; b) institutional capacity building; c) project coordination and integration among different stakeholders and within the bureau; d) creating a system of sustainable operation of transport systems and services of the City; e) infrastructure development. The necessity of the reform was also to address some complex political and social contests including corruption, patronage, and political capture according to the General Manager of AARTB (reference?).
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
埃塞俄比亚亚的斯亚贝巴的政治承诺、机构能力和城市交通治理改革
在快速城市化之后,埃塞俄比亚首都亚的斯亚贝巴受到一系列复杂的多管齐下的交通挑战的限制,这在很大程度上导致了其整体城市效率低下。交通部门领导层缺乏政治承诺和体制能力薄弱加剧了这种城市困境。在此背景下,本文考察了2012年亚的斯亚贝巴市长Diriba Kuma领导的亚的斯亚贝巴市政府发起的一揽子交通部门改革方案的效率。通过这项研究,政治承诺和机构能力在城市改革议程的设计、管理和实施中所起的作用被仔细研究。为此,本文利用公共部门治理(PSG)改革框架来分析改革的政治承诺与实施商定改革的机构能力之间的相互作用。该文件特别强调了在有大量政治承诺但体制能力较低的情况下改革的结果。在这方面,为了取得更好的公共政策成果,研究报告指出,有必要取消不必要的官僚程序,解决治理结构效率低下的问题,同时重新审视和改进运输治理方面的现有规范、规则和条例。政策改革计划侧重于五个支柱,旨在缩小政策与执行之间的差距;a)制定策略性计划及标准,以持续增加现时及未来的交通挑战;B)机构能力建设;C)不同利益相关者之间和局内的项目协调和整合;d)建立可持续运作的运输系统和服务系统;E)基础设施发展。根据AARTB总经理的说法,改革的必要性也是为了解决一些复杂的政治和社会问题,包括腐败、赞助和政治捕获。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Uçak Çakışma Saptama Ve Çözümleme Problemi için Karma Tam Sayılı Doğrusal Programlama Modeli Yaklaşımı Investigation of Thermal Conductivity Properties of Polymer Based Composites Containing Waste Materials Design and Prototyping of Sensor-based Anti-Theft Security System using Microcontroller Used Vehicles Survival Rates and Their Impacts on Urban Air Quality of Addis Ababa, Ethiopia Political Commitment, Institutional Capacity and Urban Transport Governance Reform in Addis Ababa, Ethiopia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1