{"title":"On the choice of batch mode in order to maximize throughput","authors":"P.J. Weeda","doi":"10.1016/0167-188X(90)90048-M","DOIUrl":null,"url":null,"abstract":"<div><p>An analysis of serial process configurations consisting of three processes and two machines shows interesting relations between the choice of batch mode (or batch structure), utilization of capacities and maximum throughput.</p></div>","PeriodicalId":100476,"journal":{"name":"Engineering Costs and Production Economics","volume":"19 1","pages":"Pages 241-247"},"PeriodicalIF":0.0000,"publicationDate":"1990-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-188X(90)90048-M","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Costs and Production Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167188X9090048M","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
Abstract
An analysis of serial process configurations consisting of three processes and two machines shows interesting relations between the choice of batch mode (or batch structure), utilization of capacities and maximum throughput.