{"title":"Integration of solar photovoltaic distributed generation in Nigerian power system network","authors":"J. Nweke, A. Ekwue, E. Ejiogu","doi":"10.1109/POWERAFRICA.2017.7991212","DOIUrl":null,"url":null,"abstract":"The installation of distributed generator (DG) is becoming increasingly attractive to utilities and consumers because distributed generation produces energy close to the load, are more efficient with reduced active losses and have less environmental impact. The paper proposed a validated two-step optimization novel technique with full Newton Raphson load flow. In the first step, the optimal size of DG is determined by partial derivative of exact loss formula with respect to active power injected by the DG. Whereas in the second step, the optimal location is found by loss sensitivity factor (LSF) aimed at reducing active power losses as well as improving the voltage profile of the network. Through a developed algorithm the sizing and location of the DG was validated. The test is carried out through Power System Software for Engineering (PSS/E) with the 28-bus 330kV Nigerian power network. The effectiveness yields 6.2% reduction in active power loss. Also, some of the vulnerable buses whose voltages were outside the statutory limit of 0.95 pu ≤ Vi ≤ 1.05pu: Ayede, Osogbo, New-haven, Onitsha, Gombe, Jos, Kaduna, Kano and Makurdi were improved.","PeriodicalId":6601,"journal":{"name":"2017 IEEE PES PowerAfrica","volume":"1 1","pages":"132-137"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE PES PowerAfrica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERAFRICA.2017.7991212","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The installation of distributed generator (DG) is becoming increasingly attractive to utilities and consumers because distributed generation produces energy close to the load, are more efficient with reduced active losses and have less environmental impact. The paper proposed a validated two-step optimization novel technique with full Newton Raphson load flow. In the first step, the optimal size of DG is determined by partial derivative of exact loss formula with respect to active power injected by the DG. Whereas in the second step, the optimal location is found by loss sensitivity factor (LSF) aimed at reducing active power losses as well as improving the voltage profile of the network. Through a developed algorithm the sizing and location of the DG was validated. The test is carried out through Power System Software for Engineering (PSS/E) with the 28-bus 330kV Nigerian power network. The effectiveness yields 6.2% reduction in active power loss. Also, some of the vulnerable buses whose voltages were outside the statutory limit of 0.95 pu ≤ Vi ≤ 1.05pu: Ayede, Osogbo, New-haven, Onitsha, Gombe, Jos, Kaduna, Kano and Makurdi were improved.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
太阳能光伏分布式发电在尼日利亚电网中的集成
分布式发电机(DG)的安装对公用事业和消费者越来越有吸引力,因为分布式发电在接近负荷的地方产生能量,效率更高,有功损耗更少,对环境的影响也更小。提出了一种经过验证的全牛顿-拉夫森潮流两步优化新方法。在第一步中,通过精确损耗公式对DG注入有功功率的偏导数确定DG的最优尺寸。第二步,利用损耗灵敏度因子(LSF)找到最优位置,以降低有功功率损耗,改善电网电压分布。通过开发的算法验证了DG的尺寸和位置。该测试是通过电力系统工程软件(PSS/E)与28总线330kV尼日利亚电网进行的。有效地降低了6.2%的有功功率损耗。此外,对电压超过法定限值0.95 pu≤Vi≤1.05pu的易损母线:阿义德、奥索博、纽黑文、奥尼沙、贡贝、乔斯、卡杜纳、卡诺、马库尔迪等进行了改善。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Optimized network planning of mini-grids for the rural electrification of developing countries Application of statistical tools in power transformer FRA results interpretation: Transformer winding diagnosis based on frequency response analysis An algorithm for micro-load shedding in generation constrained electricity distribution network Asynchronous interconnection of the proposed East Africa Power Pool (EAPP) Impact of large scale grid-connected wind generators on the power system network
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1