{"title":"Extended Reach Wells in Unconsolidated Sands in Bolivia","authors":"G. Dordoni","doi":"10.2118/191271-MS","DOIUrl":null,"url":null,"abstract":"\n The objective of this Technical Paper is to show the experiences and challenges in the design and execution of an extended reach well in unconsolidated sands carried out by Pluspetrol Bolivia Corporation in the Tacobo-Curiche Area. Due to surface obstacles (bed of the Rio Grande river) was proposed the drilling of a directional well which trajectory had to pass through two objectives: 1570 m Horizontal Displacement (HD) at 770 mTVD and 2345 mHD at 1171 mTVD, with the following conditions: 1st.- unconsolidated sands, 2nd.- channel of the river and 3rd.- superficiality of the objectives.\n The main objectives set for this project were: Reach the targets in the required position.Provide well quality to obtain reservoir data.Provide a well capable of being tested and produced in multiple thin layers of reservoir.\n These objectives raised technical challenges in different areas of well construction, i) curve construction in the first section with significant Dog Leg Severity (DLS) in well of 17½\" and in unconsolidated sands, ii) complex trajectory type \"S\" with HD/TVD ratio> 2; iii) collision with existing well; iv) well stability and v) cementing job for high angle well, with long areas of interest and interspersed water levels.\n To face these challenges, it was necessary to achieve a balance between hole cleaning, bit hydraulics, Rate of Penetration (ROP) and BHA directional response, being of vital importance for this, thixotropic mud, its density and the management of drilling parameters.\n The challenges and the way to face them will be developed in this Technical Paper together with the results obtained.","PeriodicalId":11006,"journal":{"name":"Day 3 Wed, June 27, 2018","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, June 27, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/191271-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The objective of this Technical Paper is to show the experiences and challenges in the design and execution of an extended reach well in unconsolidated sands carried out by Pluspetrol Bolivia Corporation in the Tacobo-Curiche Area. Due to surface obstacles (bed of the Rio Grande river) was proposed the drilling of a directional well which trajectory had to pass through two objectives: 1570 m Horizontal Displacement (HD) at 770 mTVD and 2345 mHD at 1171 mTVD, with the following conditions: 1st.- unconsolidated sands, 2nd.- channel of the river and 3rd.- superficiality of the objectives. The main objectives set for this project were: Reach the targets in the required position.Provide well quality to obtain reservoir data.Provide a well capable of being tested and produced in multiple thin layers of reservoir. These objectives raised technical challenges in different areas of well construction, i) curve construction in the first section with significant Dog Leg Severity (DLS) in well of 17½" and in unconsolidated sands, ii) complex trajectory type "S" with HD/TVD ratio> 2; iii) collision with existing well; iv) well stability and v) cementing job for high angle well, with long areas of interest and interspersed water levels. To face these challenges, it was necessary to achieve a balance between hole cleaning, bit hydraulics, Rate of Penetration (ROP) and BHA directional response, being of vital importance for this, thixotropic mud, its density and the management of drilling parameters. The challenges and the way to face them will be developed in this Technical Paper together with the results obtained.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
玻利维亚未固结砂中的大位移井
本技术文件的目的是展示Pluspetrol玻利维亚公司在tacboo - curiche地区在未固结砂中进行的大位移井的设计和实施的经验和挑战。由于地面障碍(格兰德河河床),拟钻一口定向井,其轨迹必须穿过两个目标:770 mTVD处1570 m水平位移(HD)和1171 mTVD处2345 mHD,条件如下:-松散砂,排名第二。-河道和第三。-目标的肤浅。为这个项目设定的主要目标是:在要求的岗位上达到目标。提供井质量以获取储层数据。提供能够在多个薄层油藏中进行测试和生产的井。这些目标在不同的建井领域提出了技术挑战,1)在17½”井和未固结砂岩中,第一段曲线的构造具有显著的狗腿严重程度(DLS), 2) HD/TVD比> 2的复杂轨迹类型“S”;Iii)与现有井碰撞;Iv)井的稳定性,v)大角度井的固井作业,具有较长的兴趣区域和分散的水位。为了应对这些挑战,必须在井眼清洁、钻头水力学、钻速(ROP)和BHA定向响应之间取得平衡,触变性泥浆、其密度和钻井参数的管理对这一点至关重要。本技术文件将与所获得的结果一起阐述挑战和面对挑战的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Application of Integrated Dynamic Asset Modeling to Predict and Resolve Production Instabilities in an Offshore Facility, A Case Study, Mexico The Casing Deformation During Shale Gas Hydraulic Fracturing: Why it is so Serious in Weiyuan-Changning, China? Re-Evaluating Contributions from Thin Bedded Reservoirs: Integrated Reservoir Modelling of the Greater Dolphin Area Experimental Evaluation of Sand Porosity in Eagle Ford Shale Fractures An Experimental Investigation of Proppant Diagenesis and Proppant-Formation-Fluid Interactions in Hydraulic Fracturing of Eagle Ford Shale
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1