{"title":"Factors influencing triple constraints in public sector projects in Trinidad and Tobago","authors":"Leighton Ellis, Hector Martin, Syra Ramcharitar","doi":"10.1680/JMAPL.18.00047","DOIUrl":null,"url":null,"abstract":"The dynamic construction industry has seen many advances over the years, yet schedule delay, cost overrun and reduced quality are still prevalent, with little to no sign of improvement. Additionall...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"80 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JMAPL.18.00047","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 6
Abstract
The dynamic construction industry has seen many advances over the years, yet schedule delay, cost overrun and reduced quality are still prevalent, with little to no sign of improvement. Additionall...